Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20066E622 + (23:28:22, 16 December 2024)
- ML20066E615 + (23:28:22, 16 December 2024)
- LIC-91-0022, Responds to NRC 901114 Denial of Util 900221 Request for Exemption from 10CFR50,App R for Fire Area 34B (Upper Electrical Penetration Room).Schedule for Mod Re wide-range Nuclear Instrumentation Cable Will Be Sent by 910331 + (23:28:23, 16 December 2024)
- ML20066E602 + (23:28:24, 16 December 2024)
- ML20066E606 + (23:28:24, 16 December 2024)
- 05000374/LER-1990-012-09, :on 901215,hydrogen Samples for Offgas Sys Not Taken During Planned Shutdown for Repairs on Low Pressure Feedwater Heater 23C.Caused by Miscommunication.Sample Analyzed & Offgas Sys Secured + (23:28:30, 16 December 2024)
- 05000416/LER-1982-087-03, /03L-0:on 821010,during non-nuclear Heatup Phase of Initial Plant Testing,One Loop of RHR Shutdown Cooling Was Not Operating.Caused by Planned Entry Into Limiting Condition for Operation Action Statement + (23:28:32, 16 December 2024)
- 05000416/LER-1982-087, Forwards LER 82-087/03L-0 + (23:28:33, 16 December 2024)
- ML20066E588 + (23:28:35, 16 December 2024)
- ML20066E585 + (23:28:35, 16 December 2024)
- ML20066E583 + (23:28:36, 16 December 2024)
- ML20066E584 + (23:28:36, 16 December 2024)
- ML20066E575 + (23:28:40, 16 December 2024)
- ML20066E577 + (23:28:40, 16 December 2024)
- 05000296/LER-1982-047-03, /03L-0:on 821007,while Performing SI 4.1.A-7, Reactor High Water Level Switch as-found Calibr Exceeded Tech Spec Requirements.Caused by Level Indicating Switch Calibr Drift.Switch Recalibr + (23:28:42, 16 December 2024)
- 05000296/LER-1982-047, Forwards LER 82-047/03L-0 + (23:28:43, 16 December 2024)
- 05000416/LER-1982-102-99, /99X-0:on 821011,while Performing Maint to Pull Addl Cable Into Panel 1H13P614,panel Fire Barrier Broken. Caused by Need to Perform Maint.Limiting Conditions for Operation Entered & Hourly Fire Watch Established + (23:28:52, 16 December 2024)
- 05000416/LER-1982-102, Forwards LER 82-102/99X-0 + (23:28:53, 16 December 2024)
- ML20066E545 + (23:28:54, 16 December 2024)
- ML20066E547 + (23:28:54, 16 December 2024)
- 1CAN078103, Forwards Monthly Operating Rept for June 1981 + (23:28:55, 16 December 2024)
- RBG-13-691, Final Deficiency Rept DR-39 Re Insufficient Beam End Gaps Between Drywell Wall & Primary Shield Wall.Initially Reported on 821008.One Connection Plate Removed Allowing Removal & Proper Trimming of Beam + (23:28:56, 16 December 2024)
- ML20066E539 + (23:28:56, 16 December 2024)
- ML20066E516 + (23:29:03, 16 December 2024)
- ML20066E512 + (23:29:03, 16 December 2024)
- 05000293/LER-1982-045, Forwards LER 82-045/03L-0 + (23:29:04, 16 December 2024)
- ML20066E509 + (23:29:05, 16 December 2024)
- ML20066E500 + (23:29:06, 16 December 2024)
- ML20066E508 + (23:29:06, 16 December 2024)
- ML20066E495 + (23:29:10, 16 December 2024)
- ML20066E498 + (23:29:10, 16 December 2024)
- ML20066E492 + (23:29:11, 16 December 2024)
- 05000259/LER-1982-081-03, /03L-0:on 821008,during Normal Operation While Performing Routine Filter Changeout,Continuous Air Monitor CAM 1-90-251 Found Inoperable.Caused by Low Oil Level in Sample Pump.Pump Refilled W/Oil + (23:29:13, 16 December 2024)
- ML20066E480 + (23:29:14, 16 December 2024)
- ML20066E482 + (23:29:14, 16 December 2024)
- ML20066E478 + (23:29:15, 16 December 2024)
- 05000259/LER-1982-085-03, /03L-0:on 821010,smoke Detector XS-39-27A Alarmed & Would Not Clear.Probably Caused by Increased Detector Sensitivity.Detector Replaced & Tested Satisfactorily. Firewatch Established + (23:29:19, 16 December 2024)
- 05000259/LER-1982-081, Forwards LER 82-081/03L-0 + (23:29:20, 16 December 2024)
- 05000259/LER-1982-085, Forwards LER 82-085/03L-0 + (23:29:21, 16 December 2024)
- ML20066E451 + (23:29:22, 16 December 2024)
- ML20066E447 + (23:29:22, 16 December 2024)
- 05000267/LER-1982-039-03, /03L-0:on 821006,sys 21 Loop Split Mod Procedures Failed to Require Posting of Fire Watch During Maint or Performance of Fire Barrier Penetration Seal post-maint Insp.Controlled Work Procedure Manual Being Revised + (23:29:24, 16 December 2024)
- 05000267/LER-1982-039, Forwards LER 82-039/03L-0.Detailed Event Analysis Encl + (23:29:28, 16 December 2024)
- ML20066E436 + (23:29:28, 16 December 2024)
- 05000324/LER-1982-119-03, /03L-0:on 821007,reactor Recirculation Pump 2A Tripped When Test Signal Applied to Atws/Rpt Instrument 2-B21-LT-N024A-1.Caused by Failure of Periodic Test to Provide for Shutting N024A-1 Instrument Manifold Valves + (23:29:30, 16 December 2024)
- ML20066E427 + (23:29:31, 16 December 2024)
- 05000333/LER-1982-045-03, /03L-0:on 821006,isolation Valves 02-39 & 40 Associated W/Penetration X-41 Failed to Isolate on All Signals.Caused by Failure to Update FSAR & Tech Specs to Reflect Change in Signals During Const.Valves Closed + (23:29:32, 16 December 2024)
- 05000387/LER-1982-038-03, /03L-0:on 821004,remote Sampling,Initiated Due to Inoperable Reactor Bldg Special Particulate Iodine Mobile Gas Monitor,Discontinued Prior to Complete Sign Off of Work Authorization.Caused by Personnel Error + (23:29:35, 16 December 2024)
- 05000387/LER-1982-038, Forwards LER 82-038/03L-0 + (23:29:36, 16 December 2024)
- ML20066E412 + (23:29:36, 16 December 2024)
- 05000333/LER-1982-045, Forwards LER 82-045/03L-0 + (23:29:37, 16 December 2024)