ML20066E482
| ML20066E482 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 11/04/1982 |
| From: | Roman T NIAGARA MOHAWK POWER CORP. |
| To: | |
| Shared Package | |
| ML20066E481 | List: |
| References | |
| NUDOCS 8211150218 | |
| Download: ML20066E482 (4) | |
Text
.
4 NIAGARA M0llAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION UNIT #1 g
NARRATIVE OF OPERATING EXPERIENCE October 1982 The Station operated during the month of October 1982 with a monthly avail-ability factor of 0.0% and a net design electrical capacity factor of 0.0%.
The Station was shut down March 19, 1982, for a scheduled main-tenance outage. The Station remains shut down due to Reactor Recircula-tion system piping cracks found during Vessel Hydro on March 23, 1982.
CLASS I WORK - MAINTENANCE - OCTOBER 1982 WR #17766 - FW Booster Pump Discharge Blocking Valve Drains (51-44, 45, 46) cut caps to facilitate system layup WR #17768 - Drain on Condensate Blocking Valve 50-35 cut cap to drain system WR #18863 - Replaced packing and gasket on #12 Cond. Trans pump 10/7/82 WR #19010 - Replaced filters in Control Room Vent System 10/18/82 WR #18572 - Rebuild #13 Reactor Recire. Suction Valve 10/29/82 WR #18966 - Repaired penetration 1-31 Col. Q, QA-12A, CLASS I WORK - INSTRUMENTATION AND CONTROL - OCTOBER 1982
- 18939 - CRD Accumulators #22-15 and #14-11 Defective Float Switches.
(Replaced with new switches.)
CLASS I WORK - ELECTRICAL - OCTOBER 1982 WR #18941 - Repaired Contr'o1 Room Ventilation Damper 210-28 MO #2151 - Mark I Containment - New Torus Temp. Monitoring MO #3070 - Diesel Generation Isolation Switch Annunciation MO #1852 - Increased Range Radiation Monitors MO #2731 - Removed Electrical Wiring for Feedwater Isolation Valves N1-MST-M1 - 125 VDC Batteries, Cell Specific Gravities and Battery Voltage L
\\
8211150218 8210'08
~
PDR ADOCK 05000220 i
R PDR
AVER.tGE [ngty t.N!T POhER LEVEL DOCKET NO.
50-220 i
UNIT 9 Mile Pt. #1 1
11/4/82 DATE CO\\1PLETED By TW Roman egusu TELEPflONE -(315j 343-211 X1366 it October.1982 AIONTH DAY AVERACE DAILY POWER LEVEL DAY iMWe Net)
AVERACE DAILY POWER LEVEL (MWe-Neti g
0 I7 0
1 n
I8 0
0
(
3 0
19 4
0 20 0
5 n
I O
0 6
0 7
0 23 0
8 0
0 2a 0
9 0-
'S 0
10 0
26 O
0 II 27 12 0
0 25 I3 0
29 0
I4 0
0 30 I5 o
3I O
16 n
i s
INSTRUCTIONS On this format.fis: the averat.e the nearest whole megawaii ' d3,iy "" E"*#' I#'#I '" MWe Net abr e.sch day in ih, re;,,,,,,,,p,,,,,,,,,,, g.,,
me
('J I" li i
i
\\
i o
i.
.,.m.~,
.c ;-.
=
-. m c ~~ em
-~~ --~ N. -.:" "' "^"
}l;, z -;= ;l
?
OPERATING DATA REPORT 502220 DOCKET NO.
DATE 11/4/D4 COSIPLETED BY TW Roman-TELEPif0NE (3151343-21 0 OPERA TING STATUS X1383 1.
' nit Name:
Nine 51ile Point. Unit #1 Notes
.. Reportm; Period:
10/01/82 - 10/31/82 1650
- 3. Licensed Thermal Power (SIWt):
- 4. Nameplate Rating (Gross 51We):
640 620
- 5. Design Electrical Rating (Net 5tWe):
baU
- 6. Slaximum Dependable Capacity (Gross h!We):
01U 7.3f axim, um Dependable Capacity (Net 51We).
S. If Chan;es Occur in Capacity Ratings (items Number 3 Through 7)Since Last Report.Give Reasons:
- 9. Power Lese! To which Restricted,If Any (Net 51We):
- 10. Reasons For Restrictions,if Any:
This >!onth Yr..t o.Da t e Cumulatise 50 7386.0 113,952.0
- 11. liot;rs in Reporting Period
- 12. Number Of flours Reactor Was Critical 0.0 1874.0 81,308.5
- 13. Reactor ReserTe Shutdown liours 0.0 0.0 1,204.2
- 14. Hours Generatur On.Line 0.0 1872.5 78.,562.3
- 15. Unit Resene Shutdow n Hours 0.0 0.0 20.4
- 16. Gross Therma! Energy Generated (.\\iWili 0
3,421.090 129,a/4,avu U
- 17. Gross Electrical Ener;y Generated f. !w!!)
1,109,/UI 4.:, / 4 a, usu
\\
U
,1,134,756 41,392,o51 IS. Net Electricas energy Generated (.\\t w tt)
- 19. Urnt Senier r :ctor 0.0 25.4 68.9
- 20. Ur'
. :M '. ~
F::. :
0.0 25.4 68.9 21 U:.* O,-.
Tactor l'Usig S!DC Net,
- 22. Unit Capacity f actor ICsm; DER Net) 0.0 24.8 _
56.0
- 23. Unit Forced Outage Rate 100.0
/a.i 13.5 N. Shutdowns Scheduled Oser Aest 6 alonthsiType. Date.at.d Dur.:tiaa uf Each::
- 25. If Shur l>own Tt EnJ Of Report Period. Estunated I) ate of Startup.
September 1983
- 26. Unit, In Test Status (Prior to Commercial Operationi Forecast Achiesed INITI A L CRITICA LITY INilla L ELECTRICITY CO\\lt!ERCI \\I. OPER \\ LION
50-220 UNIT SilUIDOWNS AND POWER REDUCTIONS DOCKEFNO.
UNIT NAME 9 Mile I,t.
s1 DATE - 11/4/82 -
Oct. 1982 REPORT MON.iil COMPLETED !!Y TW Roman v/o-g g _
M 'llONE (315)343-211Cr/
X1245 q
.! ?
3
..$k Licensee
,E r, E4 Cause & Corrective No.
Date g
3g g
,gg5 Event
?
e-1 Action to
$E le j 6; g Report *
<N0 y'
Prevens Recurrence 6
745 8206 820323 F
A 4
82-009 Replacement of recire. piping continues.
TOTi L dB I
2 3
4 F: Forced Reason:
Method:
Exhibit G Instructions S: Scheduled A Equipment Failure (Explain)
I. Manual for Preparation of Data B Maintenance or Test 2 Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D. Regulatory Restrictio, 4-Other (Explain) 0161)
'E Operator Training & IJcinse Examination F-Administrailve l
G-Operation.il Er roe ( E > ph in) 5 (9/77) li Olher (Explain)
Exhibit 1 Same Source e
h