Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20069B904 + (16:10:01, 16 December 2024)
- ML20069B900 + (16:10:05, 16 December 2024)
- ML20069B897 + (16:10:07, 16 December 2024)
- 05000424/LER-1994-003-03, :on 940426,PPAFES Were Found to Be Closed Due to Circuit Breakers Being Deenergized While Design Change Was Being Performed.Corrective Action:Engineers Will Be Trained & Circuit Breakers Have Been Corrected + (16:10:08, 16 December 2024)
- 05000237/LER-1983-012, Forwards LER 83-012/01T-0 + (16:10:09, 16 December 2024)
- ML20069B890 + (16:10:10, 16 December 2024)
- ML20069B889 + (16:10:11, 16 December 2024)
- ML20069B886 + (16:10:11, 16 December 2024)
- ML20069B884 + (16:10:13, 16 December 2024)
- ML20069B885 + (16:10:13, 16 December 2024)
- ML20069B879 + (16:10:15, 16 December 2024)
- ML20069B880 + (16:10:15, 16 December 2024)
- ML20069B876 + (16:10:16, 16 December 2024)
- ML20069B873 + (16:10:16, 16 December 2024)
- ML20069B862 + (16:10:17, 16 December 2024)
- ML20069B871 + (16:10:17, 16 December 2024)
- ML20069B858 + (16:10:18, 16 December 2024)
- ML20069B857 + (16:10:19, 16 December 2024)
- ML20069B855 + (16:10:19, 16 December 2024)
- ML20069B852 + (16:10:22, 16 December 2024)
- 3F0594-16, Withdraws Request for Exemption from 10CFR50.75 & Advises That Util Will Work Toward Generic Review of Decommissioning Funding Regulation & Associated Guidance + (16:10:23, 16 December 2024)
- ML20069B851 + (16:10:23, 16 December 2024)
- ML20069B846 + (16:10:24, 16 December 2024)
- 05000324/LER-1982-020-03, /03L-0:on 820129,primary Containment Atmospheric Oxygen Analyzer 2-CAT-AT-1263-2 Found Indicating High. Caused by Moisture Buildup in Analyzer Sample Piping. Moisture Removed & Analyzer Recalibr + (16:10:25, 16 December 2024)
- ML20069B839 + (16:10:29, 16 December 2024)
- ML20069B842 + (16:10:29, 16 December 2024)
- ML20069B835 + (16:10:30, 16 December 2024)
- ML20069B837 + (16:10:30, 16 December 2024)
- ML20069B834 + (16:10:31, 16 December 2024)
- 05000324/LER-1982-020, Forwards LER 82-020/03L-0 + (16:10:32, 16 December 2024)
- ML20069B832 + (16:10:33, 16 December 2024)
- ML20069B828 + (16:10:34, 16 December 2024)
- ML20069B830 + (16:10:34, 16 December 2024)
- 05000302/LER-1982-003-01, /01T-0:on 820128,RCS Pressure Boundary Leak Found in Valve Body of MUV-43.Caused by Thermally Induced Cyclic fatigue.MUV-43 Removed.New Valve Will Be Installed in Improved Location + (16:10:36, 16 December 2024)
- ML20069B824 + (16:10:38, 16 December 2024)
- ML20069B822 + (16:10:38, 16 December 2024)
- B14848, Responds to Generic Ltr 92-01,Rev 1, Reactor Vessel Structural Integrity, Specifically Verification of Reactor Vessel Integrity Database.Response Accurately Reflected in Database W/Listed Exception + (16:10:39, 16 December 2024)
- ML20069B820 + (16:10:39, 16 December 2024)
- ML20069B812 + (16:10:42, 16 December 2024)
- ML20069B811 + (16:10:43, 16 December 2024)
- ML20069B808 + (16:10:44, 16 December 2024)
- ML20069B807 + (16:10:44, 16 December 2024)
- ML20069B805 + (16:10:45, 16 December 2024)
- PY-CEI-NRR-0026, Addresses SER Confirmatory Issue 36 Re 3-h Fire Rating for Gypsum Walls.Research Five Technology Group of Gold Bond Bldg Products Ltr Supplying Verification of 3-h Fire Rating Encl + (16:10:46, 16 December 2024)
- 05000325/LER-1982-014-03, /03L-0:on 820127,post-accident Monitors 2-CAC-AQH-1260-1 & 3 & 1262-1 & 3 Showed Upscale Indications,Along W/Several Unit 1 Monitors.Caused by Moisture Accumulation in Sampling Chanbers.Moisture Removed + (16:10:47, 16 December 2024)
- ML20069B801 + (16:10:48, 16 December 2024)
- ML20069B798 + (16:10:49, 16 December 2024)
- ML20069B797 + (16:10:50, 16 December 2024)
- 05000325/LER-1982-014, Forwards LER 82-014/03L-0 + (16:10:51, 16 December 2024)
- ML20069B793 + (16:10:51, 16 December 2024)
- CNL-20-025, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision + (16:10:52, 16 December 2024)
- PY-CEI-NRR-0022, Forwards Responses to NRC Questions 420.03,420.05 & 420.06.Questions Also Identified as SER Open Item 13, Loss of Non-Class IE Instrumentation & Control Power Sys Bus During Operation & 14, Control Sys Failure + (16:10:52, 16 December 2024)