Third Interim Deficiency Rept Re Incorrect Tolerances for Tubular Steel Cable Tray Hangers,Initially Reported 810716. Next Rept by 820414
ML20069B871
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 01/21/1982
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8203080091
Download: ML20069B871 (2)


Text

TENNESSEE VALLEY AUTHORITY

(.1.;tIRC -

CHATTANOOGA. TENNESSEE 37401

'i l/ 7/

. ' f.'

400 Chestnut Street Tower II

  • N F, January 21, 1982 92. 5

BLRD-50-438/81-47 c3 BLRD-50-439/81-50 e

o; Mr. James P. O'Reilly, Director UNED Office of Inspection and Enforcement 9-U.S. Nuclear Regulatory Commission

'~

l44R 05 IOO2h Region II - Suite 3100 ag$!

101 Marietta Street i

p Atlanta, Georgia 30303

(

tu

Dear Mr. O'Reilly:

BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - TOLERANCE FOR TUBULAR STEEL CABLE TRAY HANGERS - BLRD-50-438/81-47, BLRD-50-439/81 THIRD INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector R. V.

Crlenjak on July 16, 1981 in accordance with 10 CFR 50.55(e) as NCR 1478. This was followed by our interim reports dated August 14 and November 9, 1981. Enclosed is our third interim report. We expect to submit our next report by April 14, 1982.

If you have any questions concerning this matter, please get in touch with R. H. Shell at FTS 858-2688.

Very truly yours, TENNESSEE VALLEY AUTHORITY

/

L. M. Mills, Ma ager Nuclear Regulation and Safety Enclosure cc:

Mr. Richard C. DeYoung, Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatorf Commission Washington, DC 20555

%iCIAL C ur

.n77 8203080091 820121 I"

.$DRADOCK05000 An Equal Opportunity Employer

/

~4b 'l w*

ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 TOLERANCE FOR TUBULAR STEEL CABLE TRAY HANGERS 10 CFR 50.55(e)

BLRD-50-438/81-47, BLRD-50-439/81-50 THIRD INTERIM REPORT

~3 Description of Deficiency i

Because of a misunderstanding, TVA Bellefonte field forces fabricated and installed cable tray hangers outside the tolerances allowed by the seismic analysis.

Interin Progress TVA has identified those supports that were modified outside the tolerances ellowed. These are deviations not covered by an approved field change request. These deviations have been analyzed by a designer and are now being reviewed by a checker on a case-by-case basis. Any modification required to ensure seismic qualification will be made.

Additional information will be supplied in our next report.

/