Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20069K151 + (15:37:49, 16 December 2024)
- ML20069K150 + (15:37:54, 16 December 2024)
- 05000387/LER-1982-022-03, /03L-0:on 820916,while Cleaning Control Rod Drive (CRD) Suction Strainers,Crd Pumps Tripped.Caused by Low Suction Pressure Due to Pressure Fluctuations from Cycling Condensate Reject Valve.Suction Trip Logic Modified + (15:37:56, 16 December 2024)
- 05000324/LER-1983-043, Forwards LER 83-043/01T-0 + (15:37:57, 16 December 2024)
- ML20069K145 + (15:37:58, 16 December 2024)
- ML20069K144 + (15:37:58, 16 December 2024)
- 05000282/LER-1982-018-03, /03L-0:on 820915,discovered That Two Ventilation Flow Tests Not Performed as Scheduled.Caused by Personnel Error.Tests Rescheduled + (15:38:00, 16 December 2024)
- 05000281/LER-1983-013-03, /03L-0:on 830323,ampere Readings for Heat Tracing Panel 8,circuit 2B Was Below Acceptance Criteria.Caused by Butt Splice Failure.Defective Butt Splice Replaced & Circuit Tested Satisfactorily + (15:38:03, 16 December 2024)
- ML20069K130 + (15:38:04, 16 December 2024)
- 05000335/LER-1983-020-03, /03L-0:on 830322,closing Latch Pin Broken on LPSI Pump 1B Breaker While Being Slow Closed for Alignment Check. Westinghouse porcel-line Air Circuit Breaker Model 50DHP250 Involved.Pins from Two Breakers on Bus Removed & Test + (15:38:06, 16 December 2024)
- ML20069K121 + (15:38:07, 16 December 2024)
- 05000387/LER-1982-022, Forwards LER 82-022/03L-0 + (15:38:08, 16 December 2024)
- ML20069K119 + (15:38:08, 16 December 2024)
- 05000285/LER-1983-003-01, /01T-0:on 830405,Tech Spec Heatup & Cooldown Curves in Use Since Dec 1979 Found to Be 12 Degrees Nonconservative.Caused by Baseline Curve Info Supplied in 1979 Being Inadequately Defined.Curve Being Revised + (15:38:11, 16 December 2024)
- 05000281/LER-1983-014, Forwards LERs 83-013/03L-0 & 83-014/03L-0.W/o LER 83-014/03L-0 + (15:38:13, 16 December 2024)
- ML20069K114 + (15:38:13, 16 December 2024)
- ML20069K106 + (15:38:14, 16 December 2024)
- 05000282/LER-1982-018, Forwards LER 82-018/03L-0 + (15:38:15, 16 December 2024)
- 05000335/LER-1983-020, Forwards LER 83-020/03L-0 + (15:38:16, 16 December 2024)
- ML20069K101 + (15:38:16, 16 December 2024)
- NRC-94-0048, Requests NRC Review & Approval of Change to QA Program as Contained in Section 17.2 of Updated Fsar.Proposed Change Revised Closure Process of Corrective Action Documents + (15:38:17, 16 December 2024)
- BECO-LTR-94-070, Monthly Operating Rept for May 1994 for Pilgrim Nuclear Power Station + (15:38:18, 16 December 2024)
- 05000282/LER-1994-004, :on 940508,as-found Lift Setpoint for MSSVs Determined to Be Outside TS Tolerance of +/- 1%.Lift Setpoints for Valves Measured Outside +/- 1% Tolerance Returned to within Tolerance Specified in TS + (15:38:21, 16 December 2024)
- ML20069K083 + (15:38:22, 16 December 2024)
- ML20069K076 + (15:38:27, 16 December 2024)
- ML20069K073 + (15:38:28, 16 December 2024)
- 05000285/LER-1983-003, Forwards LER 83-003/01T-0 + (15:38:29, 16 December 2024)
- ML20069K070 + (15:38:29, 16 December 2024)
- 05000266/LER-1982-016-01, /01T-0:on 821002,containment Isolation Valve 1CV-3200C in Suction Line of Radioactive Gas & Particulate Monitoring Sys Failed to Close.Caused by Failure of 3-way Solenoid Valve to Cycle.Valve Closed & Repaired + (15:38:32, 16 December 2024)
- ML20069K056 + (15:38:33, 16 December 2024)
- ML20069K052 + (15:38:34, 16 December 2024)
- ML20069K049 + (15:38:35, 16 December 2024)
- RBG-40630, Responds to Violations Noted in Insp Rept 50-458/94-06. Corrective Actions:Procedure Upgrade Program Initiative Underway + (15:38:36, 16 December 2024)
- ML20069K047 + (15:38:37, 16 December 2024)
- ML20069K040 + (15:38:46, 16 December 2024)
- TXX-3582, Interim Deficiency Rept Re Linear Indications Identified in Diesel Generator Auxiliary Skid.Initially Reported on 820709.Evaluation Continuing.Next Rept Expected by 821217 + (15:38:48, 16 December 2024)
- 05000266/LER-1982-016, Forwards LER 82-016/01T-0 + (15:38:49, 16 December 2024)
- ML20069K028 + (15:38:50, 16 December 2024)
- ML20069K024 + (15:38:51, 16 December 2024)
- ML20069K022 + (15:38:56, 16 December 2024)
- ML20069K021 + (15:38:57, 16 December 2024)
- ML20069K017 + (15:38:58, 16 December 2024)
- RBG-14-833, Interim Deficiency Rept DR-71 Re Inconsistencies Found in QA Program at Wj Woolley Co,Manufacturer of Personnel Air Locks.Initially Reported on 820827.Util Awaiting Info from Vendor.Next Rept Expected by 830603 + (15:38:58, 16 December 2024)
- HL-4608, Responds to NRC Re Violation Noted in Insp Rept 50-366/94-08.Corrective Actions:Involved Personnel Counseled Re Inappropriate Actions & Air Hose take-up Reel Adjusted Per Maint WO 2-94-1230 on 940416 + (15:38:59, 16 December 2024)
- ML20069K015 + (15:39:01, 16 December 2024)
- ML20069K011 + (15:39:01, 16 December 2024)
- TXX-3580, Interim Deficiency Rept Re Defective Limitorque Pinion Keys.Initially Reported on 820818.Matter Not Reportable Per 10CFR50.55(e) Based on Investigation + (15:39:02, 16 December 2024)
- BSEP-83-1193, Forwards Corrected Monthly Operating Repts for Apr 1982 - Mar 1983 + (15:39:03, 16 December 2024)
- ML20069K008 + (15:39:04, 16 December 2024)
- ML20069K006 + (15:39:06, 16 December 2024)
- ML20069K003 + (15:39:06, 16 December 2024)
- 05000244/LER-1982-022, Forwards LER 82-022/01T-0 + (15:39:07, 16 December 2024)