Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NRC-94-4189, Forwards Responses to NRC RAIs on AP600 from Ltrs of 940429, 0502,11 & 23.Rev to Response Previously Submitted Also Provided + (14:52:56, 16 December 2024)
- 05000263/LER-1994-004-01, :on 940604 & 20,lightning Strikes Occurred, Resulting in Reactor Scram & Group 2 Containment Isolation, Respectively.Pressure Transmitter PT-7495A & Radiation Monitor RM-17-453B Will Be Modified + (14:52:58, 16 December 2024)
- ML20070D694 + (14:53:00, 16 December 2024)
- ML20070D674 + (14:53:01, 16 December 2024)
- ML20070D673 + (14:53:02, 16 December 2024)
- ML20070D668 + (14:53:03, 16 December 2024)
- JAFP-82-1261, Responds to NRC Re Violations Noted in IE Health Physics Appraisal Rept 50-333/80-20.Corrective Actions: Offgas Sys Undergoing Testing & Repair.Next Status Rept Will Be Filed by 830201 + (14:53:04, 16 December 2024)
- 05000395/LER-1982-041-03, /03L-0:on 821109,during Mode 2,radiation Monitor RM-A1 (Control Room Isolation) Failed Surveillance Test Procedure 360.032.Caused by Instrument Drift.Monitor Calibr & Returned to Svc + (14:53:05, 16 December 2024)
- 05000395/LER-1982-041, Forwards LER 82-041/03L-0.Detailed Event Analysis Encl + (14:53:06, 16 December 2024)
- 05000325/LER-1982-137-03, /03L-0:on 821111,routine Surveillance Revealed That Indication of Drywell Oxygen Concentration Increased Abruptly from 1.2 to 3.1%.Caused by Failure of Atmosphere Analyzer 1-CAC-AT-1263-2 Due to Zero Shift.Unit Recalibr + (14:53:08, 16 December 2024)
- ML20070D623 + (14:53:09, 16 December 2024)
- ML20070D618 + (14:53:09, 16 December 2024)
- 05000325/LER-1982-137, Forwards LER 82-137/03L-0 + (14:53:10, 16 December 2024)
- 05000296/LER-1982-053-03, /03L-0:on 821111,while Performing Daily Background Source Check of Turbine Bldg Continuous Air Monitor 3-90-251,inlet Hose Found Disconnected.Probably Caused by Failure to Securely Latch Quick Disconnect Fittings + (14:53:12, 16 December 2024)
- ML20070D604 + (14:53:12, 16 December 2024)
- 05000302/LER-1982-071-03, /03L-0:on 821114,during Mode 1,radiation Monitor RM-A5,control Room Iodine Channel Found Inoperable.Caused by Failure of Rotary Selector Switch.Switch Replaced & Monitor Placed in Svc + (14:53:14, 16 December 2024)
- 05000296/LER-1982-053, Forwards LER 82-053/03L-0 + (14:53:15, 16 December 2024)
- ML20070D590 + (14:53:15, 16 December 2024)
- 05000302/LER-1982-071, Forwards LER 82-071/03L-0 + (14:53:16, 16 December 2024)
- 05000260/LER-1982-036-03, /03L-0:on 821113,during Refueling Outage,Reactor Bldg Continuous Air Monitor 2-90-250 Became Inoperable Due to Broken Drive Belt on Sample Pump.Caused by Normal Wear. Std v-belt for Switzer Model 325 Svc Air Pump Replaced + (14:53:18, 16 December 2024)
- 05000302/LER-1982-070-03, /03L-0:on 821107,during Mode 1,nuclear Overpower Channel B Tripped Due to Failure of Reactor Coolant Flow Transmitter RC-14A-FT2.Caused by Shorted Capacitor in Power Supply.Capacitor Replaced & Transmitter Returned to Svc + (14:53:19, 16 December 2024)
- 05000260/LER-1982-036, Forwards LER 82-036/03L-0 + (14:53:20, 16 December 2024)
- 05000395/LER-1982-039-03, /03L-0:on 821108,steam Generator Steam Flow Transmitter (FT-476) Power Supply Found Defective.Caused by Failure on Transmitter Power Supply (FQY-476).Channel Placed in Tripped Condition.Circuit Board Replaced & Tested + (14:53:22, 16 December 2024)
- ML20070D566 + (14:53:23, 16 December 2024)
- 05000302/LER-1982-070, Forwards LER 82-070/03L-0.Detailed Event Analysis Encl + (14:53:24, 16 December 2024)
- L-82-531, Final Deficiency Rept 82-024 Re Defective Masonry Walls. Initially Reported on 821110.During Insp of as-built Masonry walls,31 Contained Less than Required Amount of Rebar Due to Design Misinterpretation.Walls Will Be Modified + (14:53:24, 16 December 2024)
- 05000395/LER-1982-039, Forwards LER 82-039/03L-0.Detailed Event Analysis Encl + (14:53:25, 16 December 2024)
- NG-91-0222, Comment Supporting Proposed Rule on Secy 90-347 Re Regulatory Impact Survey Rept + (14:53:25, 16 December 2024)
- 05000338/LER-1982-075-03, /03L-0:on 821119,individual Rod Position Indicator for Rods B-10 in Control Bank A,D-4 in Control Bank C & N-9 in Shutdown Bank A,Deviated from Group Demand Position W/No Rod Motion.Caused by Instrument Drift.Channels Recali + (14:53:27, 16 December 2024)
- 05000338/LER-1982-075, Forwards LER 82-075/03L-0 + (14:53:28, 16 December 2024)
- 05000395/LER-1982-040-03, /03L-0:on 821108,Tech Spec 3.3.2 Had Not Been Complied W/Due to Improper Interpretation.Caused by Personnel Error.Ltr Issued Delineating Correct Interpretation of Tech Spec + (14:53:29, 16 December 2024)
- ML20070D539 + (14:53:30, 16 December 2024)
- 05000395/LER-1982-040, Forwards LER 82-040/03L-0.Detailed Event Analysis Encl + (14:53:31, 16 December 2024)
- 05000281/LER-1982-067-03, /03L-0:on 821109,w/unit at Full Power,Electrical Fire Barrier Penetration Found Improperly Sealed.Cause Unknown.Fire Watch Established & Penetration Temporarily Sealed.Permanent Sealing to Be Completed by 830101 + (14:53:33, 16 December 2024)
- ML20070D528 + (14:53:34, 16 December 2024)
- ML20070D517 + (14:53:34, 16 December 2024)
- 05000247/LER-1982-045, Corrected LER 82-045/01T-0:on 821108,insp Revealed That Upper End Plug from Fuel Rod within Assembly Separated from Fuel Tube.Cause Not Stated.Assembly Replaced + (14:53:35, 16 December 2024)
- ML20070D514 + (14:53:35, 16 December 2024)
- 05000395/LER-1982-038-03, /03L-0:on 821114,main Control Board Indication for Steam Generator a Steam Flow (FT-474) Failed to Indicate Sys Flow.Caused by Indicator Needle Sticking to Lower Stop. Channel Calibr Performed + (14:53:37, 16 December 2024)
- B13730, Responds to 910110 Telcon Request for Addl Info Re Spent Fuel Storage,Per Amend 39 to License NPF-49 Restricting Limited Storage of Spent Fuel in Spent Fuel Pool + (14:53:38, 16 December 2024)
- ML20070D501 + (14:53:38, 16 December 2024)
- ML20070D497 + (14:53:39, 16 December 2024)
- ML20070D500 + (14:53:39, 16 December 2024)
- ML20070D492 + (14:53:42, 16 December 2024)
- 05000395/LER-1982-038, Forwards LER 82-038/03L-0.Detailed Event Analysis Encl + (14:53:43, 16 December 2024)
- ML20070D490 + (14:53:43, 16 December 2024)
- SNRC-1794, Shoreham Nuclear Power Station Annual Operating Rept,1990 + (14:53:44, 16 December 2024)
- SNRC-1790, Forwards Proposed Changes to Defueled TS Re Seismic Monitoring Instrumentation,Radiation Monitoring Instrumentation & Administrative Terminology,To Resolve Comments at 900802 Meeting W/Nrc + (14:53:44, 16 December 2024)
- 05000296/LER-1982-054-03, /03L-0:on 821110 low-pressure Main Steamline Pressure Switch 3-PS-1-76 Had Setpoint Less than Tech Spec Requirements.Caused by Setpoint Drift.Switch Recalibr & Returned to Svc + (14:53:49, 16 December 2024)
- SNRC-1791, Advises That a Mattessich (Senior Reactor Operator License SOP-4425-1) Permanently Assigned to Nine Mile Point Unit 2 & No Longer Needs to Maintain License at Shoreham + (14:53:50, 16 December 2024)
- L-82-529, Final Deficiency Rept 82-021 Re Incorrect Reactor Protective Sys Low Flow Input Signals.Initially Reported on 821013.Wiring Diagram & Polarity of Input Signal Cables Corrected.Deficiency Not Reportable Per 10CFR50.55(e) + (14:53:51, 16 December 2024)
- 05000296/LER-1982-054, Forwards LER 82-054/03L-0 + (14:53:52, 16 December 2024)