- ML20070G768 + (14:39:28, 16 December 2024)
- ML20070G767 + (14:39:29, 16 December 2024)
- 05000311/LER-1982-139-03, /03L-0:on 821119,auxiliary Feedwater Storage Tank Dropped Below Tech Spec Min Vol of 200,000 Gallons.Caused by Personnel Error.Tank Level Restored & Operator Counseled + (14:39:34, 16 December 2024)
- ML20070G761 + (14:39:35, 16 December 2024)
- 3F0391-05, Discusses Issuance of Amend 133 to License DPR-72 on 910207, Changing TS for RCS Heatup & Cooldown Pressure/Temp Curves for Operation Up to 15 Efpys.Changes to Operating Practices Associated W/Nrc Bulletin 88-011 Underway + (14:39:39, 16 December 2024)
- ML20070G755 + (14:39:39, 16 December 2024)
- BECO-91-029, Suppls 910226 Response to Suppl 4 to Generic Ltr 88-20 Re Plans to Enhance Level 1 PRA to Address Seismic IPEEE Issues.Requests That NRC Recognize Use of PRA in NUREG-1407 & in Suppl 4 to Generic Ltr 88-20 Prior to Final Issuance + (14:39:40, 16 December 2024)
- SNRC-2175, Provides Notification of Survey Location Changes to Shoreham Facility Which Have Occurred Subsequent to Repts on Phases 1,2 & 3 Final Survey Status Provided in Refs 1,2 & 3 Respectively + (14:39:40, 16 December 2024)
- 05000482/LER-1991-005, :on 910208,setpoint for Containment Base Slab Triaxial Response Spectrum Recorder Incorrectly Set.Caused by Changed Design Specs.Setpoint Change Request Approved & Surveillance Test Procedure Revised + (14:39:42, 16 December 2024)
- ML20070G747 + (14:39:43, 16 December 2024)
- 05000311/LER-1982-139, Forwards LER 82-139/03L-0.Detailed Event Analysis Encl + (14:39:44, 16 December 2024)
- ML20070G743 + (14:39:44, 16 December 2024)
- ML20070G738 + (14:39:45, 16 December 2024)
- 05000338/LER-1982-070-03, /03L-0:on 821116 & 28,head Tracing Circuits ET-117N & ET-116N Failed,Reducing Piping Temp Below 145 F. Cause of 821116 Event Not Stated.Failure on 821128 Caused by Loose Insulation.Failed Channel Replaced & Insulation Added + (14:39:46, 16 December 2024)
- ML20070G733 + (14:39:47, 16 December 2024)
- RBG-34-555, Application for Amend to License NPF-47,changing Tech Spec Table 3.3.2-1 Re Isolation Actuation Instrumentation to Correctly Identify Required Reactor Water Level Signal to Initiate Main Control Room Area Ventilation Sys + (14:39:48, 16 December 2024)
- 05000395/LER-1982-046-03, /03L-0:on 821117,main Control Board Indication for Steam Generator Feedwater Flow Read Zero.Caused by Personnel Leaving Equalizing Valves on Transmitters Open.Valves Closed & Personnel Indoctrinated + (14:39:49, 16 December 2024)
- 05000395/LER-1982-046, Forwards LER 82-046/03L-0.Detailed Event Analysis Encl + (14:39:50, 16 December 2024)
- ML20070G715 + (14:39:51, 16 December 2024)
- PY-CEI-NRR-1323, Forwards Response to NRC Request for Addl Info on Product Forms,Other than Fittings & Flanges,Per NRC Bulletin 88-005.Testing & Analyses Demonstrate Adequate Shoulder Screw Strength to Perform Design Function + (14:39:51, 16 December 2024)
- 05000338/LER-1982-070, Forwards LER 82-070/03L-0 + (14:39:52, 16 December 2024)
- ML20070G709 + (14:39:52, 16 December 2024)
- ML20070G708 + (14:39:53, 16 December 2024)
- ML20070G706 + (14:39:55, 16 December 2024)
- 05000395/LER-1982-048-03, /03L-0:on 821117,condensate Polisher Backwash Water Released to Site Settling Ponds W/O Sampling.Caused by Inadequate Procedures for Release Process.Station Order Generated to Address Group Interface Prior to Release + (14:39:57, 16 December 2024)
- 05000311/LER-1982-138-03, /03L-0:on 821119,shift Supervisor Realized That Surveillance Requirement to Check Local Sightglass Levels of Accumulators 23 & 24 Was Overdue.Caused by Personnel Oversight.Personnel Counseled + (14:39:59, 16 December 2024)
- PLA-1419, Responds to NRC Re Violations Noted in IE Insp Rept 50-387/82-34.Corrective Actions:Procedures Revised to Clarify & Implement Insp Program for Prefabricated Hanger Components.Affidavit Encl + (14:40:00, 16 December 2024)
- ML20070G689 + (14:40:00, 16 December 2024)
- ML20070G682 + (14:40:01, 16 December 2024)
- ML20070G681 + (14:40:04, 16 December 2024)
- ML20070G677 + (14:40:05, 16 December 2024)
- ML20070G676 + (14:40:05, 16 December 2024)
- 05000395/LER-1982-048, Forwards LER 82-048/03L-0.Detailed Event Analysis Encl + (14:40:06, 16 December 2024)
- ML20070G675 + (14:40:06, 16 December 2024)
- ML20070G662 + (14:40:07, 16 December 2024)
- 05000499/LER-1991-002-01, :on 910131,discovered That ASME Section XI Pressure Test of Completed Work Package for Weld Repairs on AFW Pump 24 Steam Supply Line Not Performed.Caused by Inadequate Procedures.Procedures Revised + (14:40:09, 16 December 2024)
- ML20070G648 + (14:40:10, 16 December 2024)
- ML20070G647 + (14:40:11, 16 December 2024)
- 05000339/LER-1982-081-03, /03L-0:on 821206,breaker for MOV-SW-201D Discovered Open.Caused by Inadvertent Opening of Circuit Breaker Perhaps Due to Narrow Passage.Breaker Closed & Valve Control Power Verified + (14:40:12, 16 December 2024)
- 05000311/LER-1982-138, Forwards LER 82-138/03L-0.Detailed Event Analysis Encl + (14:40:13, 16 December 2024)
- ML20070G635 + (14:40:14, 16 December 2024)
- PY-CEI-NRR-1818, Informs of Implementation of Amend 57,which Will Change Peak Accident Pressure Pa from 11.31 Psig to 7.80 Psig + (14:40:14, 16 December 2024)
- 05000339/LER-1982-081, Forwards LER 82-081/03L-0 + (14:40:15, 16 December 2024)
- ML20070G623 + (14:40:15, 16 December 2024)
- ML20070G620 + (14:40:16, 16 December 2024)
- 05000339/LER-1982-075-03, /03L-0:on 821123,delta Flux Momentarily Exceeded 5% Target Band During Performance of Control Rod Operability Periodic Test.Caused by Movement of Control Rods Into Core 18 Steps for Control Rod Operability Test + (14:40:18, 16 December 2024)
- PY-CEI-NRR-1831, Emergency Application for Amend to License NPF-58,adding Exception to Provisions of LCO 3.0.4 as Applies to TS 3.6.1.4, MSIV Leakage Control Sys for Duration of Fifth Cycle of PNPP Unit 1 Operation + (14:40:19, 16 December 2024)
- ML20070G614 + (14:40:19, 16 December 2024)
- ML20070G601 + (14:40:22, 16 December 2024)
- 05000339/LER-1982-075, Forwards LER 82-075/03L-0 + (14:40:25, 16 December 2024)
- ML20070G598 + (14:40:25, 16 December 2024)
- ML20070G585 + (14:40:26, 16 December 2024)