TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 374ot 7.
pj 400 Chestnut Street Tower,II ' 3,,
December 17, 1982 9 0E C 20 m 5u t
BLRD-50-438/82-78 BLRD-50-439/82-72 l
U.S. Nuclear Regulatory Commission Region II Attn: Mr. James P. O'Reilly, Regional Ar'.ministrator 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303
Dear Mr. O'Reilly:
BELLEFONTE NUCLEAR PLANTS UNITS 1 AND 2 - IMPROPER USE OF ALTERNATE ANALYSIS ELBOLETS - BLRD-50-438/82-78, BLRD-50-439/82 FIRST INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector P. E. Fr adrickson ce November 18, 1982 in accordance with 10 CFR 50.55(e) as NCR BLN BLP 823?, Enclosed is our first interim report. We expect to submit our next report by March 23, 1983 If you have any questions concerning this matter, please get in touch with R. H. Shell at FTS 858-2688.
Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Manager Nuclear Licensing Enclosure oc: Mr. Richard C. DeYoung, Director (Enclosure)
Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 OFFICI AL CO"._,
8212220419 B21217 7g 2.,
PDR ADOCK 05000438 O
PDR An Ecual Opporto:,'ty Employer
o.
ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 IMPROPER USE OF ALTERNATE ANALYSIS FOR ELBOLETS 10 CFR 50.55(e)
NCR BLN BLP 8231 BLRD-50-438/82-78, BLRD-50-439/82-72
!*IRST INTERIM REPORT Description of Deficiency During design review, it was discovered that Bellefonte alternate analysis calculation BLN-KC-D053-11, which concerns the Component Cooling System, contains an elbolet. The Bellefonte Nuclear Plant Alternate Criteria for Piping Analysis and Support (CEB 76-11), which is the basis for this calculation, excludes any component from its scope which is not specifically listed in appendix E (Stress Intensification Factors). Elbolets are not listed.
Interim Progress All cases where piping containing an elbolet were qualified by the Bellefonte Nuclear Plant Alternate Criteria for Piping Analysis and Support are being identified and evaluated. After this avaluation is complete, TVA will supply additional information.
~