ML20070G747

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for June 1994 for McGuire Nuclear Station
ML20070G747
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 06/30/1994
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20070G745 List:
References
NUDOCS 9407200278
Download: ML20070G747 (10)


Text

. _

l l

i OPERATINS DATA REPORT DOCKET NO 50-369 DATE July 15. 1994 DPERATING STATUS COMPLETED BY R.A. Williass TELEPHONE 704-382-5346

1. Unit Names McGuire 1
2. Reporting Period: June 1, 1994-June 30, 1994
3. Licensed Thersal Power (MWt): 3411
4. Naseplate Rating (Bross MWe): 1305* Notes *Naseplate Rating
5. Design Electrical Rating (Net MWe): 1180 (Gross MWel calculated as
6. Maxinus Dependable Capacity (Bross MWe): 1171 1450.000 MVA .90 power
7. Maxieur Dependable Capacity (Net MWe): 1129 factor per Page iii, j 8. If Changes Occur in Capacity Ratings (itess Nusber 3 Through 7) Since Last NURES-0020.

l Report. Give Reasons:

9. Power Level 10 Which Restricted, If Any (Net MWe):
10. Reason For Restrictions, If any:

1 This Month Yr.-to-Date Cusulative

11. Hours in Reporting Period 720.0 4343.0  !!0279.0
12. Nester Of Hours Reacter Was Critical 720.0 3543.1 77563.6
13. Reactor Reserve Shutdown Hours --0-- --0-- --0--
14. Hours Senerator On-Line 720.0 3537.0 76756.5
15. Unit Reserve Shutdown Hours --0-- --0-- --0--
16. Gross Thersal Enstgy Generated (MWH) 24475BB 11859570 238584406
17. Gross Electrical Energy Generated (MWH) B21833 4053406 82015561 IB. Net Electrical Energy Generated (MWH) 790021 3883191 78317341 ,
19. Unit Service Factor 100.0 El.4 69.6 1
20. Unit Availability Factor 100.0 Bl.4 69.6 1
21. Unit Capacity Factor (Using MDC Net) 97.2 79.2 61.8 l
22. Unit Capa:ity Factor (Using DER Net) 93.0 75.0 60.2 l
23. Unit Forced Outage Rate 0.0 18.6 14.5 Date, and Duration of Each):
24. Refueling Shutdown Scheduled

- August 19, Over Next 1994 - 6 Months (Type,57 days

]

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prict to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 9407200278 940715 PDR ADOCK 05000369 l R PDR <

OPERATING DATA REPORT DOCKET NO 50-369 UNIT -McGuire 1 DATE July 15. 1994 COMPLETED BY R.A. Williaes TELEPHONE 704-382-5346 00 NTH June,1994 E

D AVERAGE DAILY POWER LEVEL .DE AVERAGE DAILY PDWER LEVEL (MWe-Net) (MWe-Net) 1 1110 17 1092 2 1106 10 1096 3 1102 19 1099-4  !!07 20 1094 5  !!09 21 1092 6 1112 22 1089 7 1111 23 1094 8 1105 24  !!03 -

I 9 1099 25 1097 )

10 1009 26 1096 j 11 1052 27 1099 l

l 12 1099 28 1091

! i 13 1101 29 1092 I i

14 1100 30 1091 15 1098 16 1096 l

l I

t l

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-369 i UNIT NAME riusuinr.,1 DATE ui/1D/ws REPORT MONTH June 1994 COMPLETED BY x. a. wi11iams TELEPHONE (tu4J-JUZ-DJ4b (1) 3 (4) (5) -

{2) _

E HOD T A OF LICENSE N Y S SHUT . EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S -

(1)F Forced (2)Reason (3) (4)

  • Method: Exhibit G - Instructions S Scheduled A-Equihment FailureB-Maintenance or test (Explain) 1-Manual for Preparation of, Data 2-Manual Scram Entry Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER D-Regulatory Restriction 4-Other (Explain) File (N W EG-0161))

E-Operator Training & License Examination F-Administrative (5)

Exhibit I - Same Source G-Operator Errgr(Explain) (Explain)

H-Other

i

c. . .

t 1

DOCKET: 50-369 UNIT: McGuire 1.

i Date: ~07/15/94. ,

NARRATIVE Sut49RY ,

l >

l.

MJNIH: June 1994 McGuire Unit 1 began the Inonth of June operating at 100% full power. The unit '

operated at or near 100% full power for the ~ entire Inonth.

l l i l

I I

l.

I. Prepared by: R. A. Willians Telephone: - (704)-382-5346

MONTHLY REFUELING INFORMATION REOUEST

1. Facility name: EcGuire. Unit 1
2. Scheduled next refueling shutdown: Auaust 1994
3. Scheduled restart following refueling: October 1994 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF i ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other licence amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

! 5. Scheduled date(s) for submitting proposed licensing action and supporting information.

6. Important licensing considerations'(new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

t

7. Number of Fuel assemblies (a) in the core: 121 l (b) 'in the spent fuel pool: All l

L 8. Present licensed fuel pool capacity: 1463 l Size of requested or planned increase: ---

9. Projected date of last refueling which can be accommodated by present licensed capacity: March 2006 l~

l DUKE POWER COMPANY DATE: July 15. 1994 l

Name of

Contact:

R. A. Williams Phone: (704)-382-5346 l

l I

1 i

l OPERATING DATA REPORT l i

DOCKET NB 50-370 l DATE July 15. 1994

]

OPERATING STATUS COMPLETED BY- R.A. Williams i TELEPHONE 704-382-5346

, 1. Unit Nase: McGuire 2  !

'2. Reporting Period: June 1, 1994-June 30, 1994

3. Licensed Thermal Power (MWth 3411 l
4. Naseplate Rating (Gross MWah 1305* Notes iMaseplate Rating l 5. Design Electrical Rating (Net NWe): 1180 (Bross MWe) calculated as l 6. Maxieus Dependable Capacity (Gross MWe): 1171 1450.000 MVA x .90 power

! 7. Maxisus Dependable Capacity (Net MWe):  !!29 factor per Page iii,

! B. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last NURES-0020.

Report. Give Reasons:

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason For Restrictions, if any: -

This Month' Yr.-to-Date Cumulative

11. Hours in Reporting Period 720.0 4343.0 90575.0.
12. Nusber Of Hours Reactor Was Critical 720.0 4200.4 70042.4
13. Reactor Reserve Shutdown Hours --0-- --0-- --0--
14. Hours Benerator On-Line 720.0 4198.1 69074.3 L 15. Unit Reserve Shutdown Hours t --0-- --0-- --0--
16. Gross Thereal Energy Generated (MWH) 2452002 14263344 226135831
17. Gross Electrical Energy Generated (MWH) 042301 4979228 79028163 IB. Net Electrical Energy Generated (MWH) 811234 4797426 75763546 l 19. Unit Service Factor 100.0 96.7 76.3
20. Unit Availability Factor 100.0 96.7 76.3
21. Unit Capacity Factor (Using MDC Net) 99.8 97.8 73.2
22. Unit Capacity Factor (Using DER Net) 95.5 93.6 70.9
23. Unit Forced Outage Rate 0.0 3.3 7.0
24. Shutdown Scheduled Over Next 6 Months (Type Date, and Duration of Each):

l Refueling - November 24, 1994 - 61 days

25. If Shut Down At End Of Report Period. Estiaated Date of Startup:
26. Units In Test Status (Prior to Ccenercial Operationh Forecast Athieved l

l INITIAL CRITICALITY l INITIAL ELECTRICITY j COMMERCIAL OPERATION l

GFERA11NG DATA REPORT DOCVET NO 50-370 UNIT McGuire 2 DATE July 15,1994 COMPLETED BY R.A. Willians TELEPHONE 704-382-5346 RONTH June,1994 E

D AVERASE DAILY POWER LEVEL E D AVERASE DAILY POWER LEVEL (MWe-NetI (MWe-Net) 1 1139 17 1123 2 1134 18 1126  ;

1 3 1127 19 1125 4 1134 20 1123 5 1136 21 1122 6 1136 22 1120 7  !!35 23 1123 8 1130 24  !!29 i

9 1126 25 1124 i

10  !!24 26 1123 11  !!24 27 1125 1 12  !!29 2B 1120 13 1128 29 1121 I 14 1128 30 1120 15 1127 16 1126

UNIT SHUTDOWNS AND POWER REDUC 1' IONS DOC"TP NO. 50-370 UNIT NAME ricuulut. e DATE ui/lo/94 REPORT MONTH June 1994 COMPLETED BY x. a. williams TELEPHONE (fue;-asz-Dage (1) 2) _

(4) (5)

E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTIGN TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S -

(1)F Forced (2) (3) (4)

Reason: Method: Exhibit G - Instructions S Scheduled A-Equipment FailureB-Maintenance or test (Explain) 1-Manual for Preparation of Data 2-Manual Scram Entry Sneets For Licensee C-Refueling 3-Automatic Scram (LER D-Regulatory Restriction 4-Other (Explain) Eyent Renort(NUREG-0161))

File E-Operator Training & License Examination F-Administrative (5)

G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain)

_ _ .._ __ _ _ _ - . . - . .m t

l

- 4 $

i i

l DOCKET: 50-370

-l l

UNIT: McGuire 2 i

!' Date: 07/15/94 l

NAIGATIVE SUWARY  ;

l FONIH: June 1994 l

l McGuire Unit 2 began the month of June operating at 100% full power. The unit '

operated at or near 100% full power for the entire month.

i I

l 4

Prepared by: R. A. Williams Telephone: (704)-382-5346

--rs v-._- --r r

e- , . .

.g e

i 1

MONTHLY REFUELING INFORMATION REOUEST

)

1. Facility name: McGuire, Unit 2' f
2. Scheduled next' refueling shutdown:-November 1994
3. Scheduled restart following refueling: January 1995  ;

i

.THE PROJECT: MANAGER HAS BEEN' ADVISED BY-SEPARATE COMMUNICATION OF  ;

ANY T.S'. CHANGE OR . LICENSE AMENDMENT. THEREFORE, -QUESTIONS 4 ,

THROUGH 6 WILL NO-LONGER LE MAINTAINED IN THIS REPORT.

4. Will refueling or resumption of operation thereafter require a '

technical specification change or other licence amendment?

If yes, what will these be?

If no, has reload. design and' core-configuration been-rev'ewed i by' Safety' Review Committee.regarding unreviewed safety questions?

l

5. Scheduled date(s) for submitting proposed' licensing action and-supporting.information. l
6. Important licensing considerations'(new or different design or supplier, unreviewed design or. performance analysis methods,. 4
significant changes.in design or new operating procedures).

{

7. Number of Fuel assemblies (a) in the core:f111 (b) in1the-. spent fuel pool: 1121 l
8. Present licensed fuel pool capacity: 1463  ;

Size of requested or planned increase: ---

i

9. Projected date of last' refueling which can be' accommodated by present licensed capacity: December 2003 DUKE POWER COMPANY DATE: July 15, 1994 Name of

Contact:

R. A. Williams Phone: (704)-382-5346 b

I

- -