- ML20072E843 + (10:29:53, 15 December 2024)
- AECM-83-0345, RO 83-045/0 on 830515,Fire Doors OC501 & OC503 on East Side of Control Room Blocked Open to Allow Routing of Hoses to Seal fire-rated Penetrations in Control Room.Fire Watch Established.Completion Expected by 830725 + (10:29:54, 15 December 2024)
- ML20072E842 + (10:29:54, 15 December 2024)
- ML20072E838 + (10:29:55, 15 December 2024)
- 05000298/LER-1983-007-03, /03L-0:on 830518,during Refueling,Both Standby Gas Treatment Sys Diesel Generators Found Inoperable.Caused by Personnel Failure to Follow Tech Spec Requirements. Requirements Reviewed & Clarified + (10:29:57, 15 December 2024)
- ML20072E829 + (10:29:58, 15 December 2024)
- 05000316/LER-1983-048-01, /01T-0:on 830603,operators Inadvertantly Closed Manual Isolation Valve on HX of Nontested Train,Rendering Trains Inoperable.Caused by Personnel Error.Personnel Counseled + (10:29:59, 15 December 2024)
- ML20072E824 + (10:30:00, 15 December 2024)
- ML20072E821 + (10:30:01, 15 December 2024)
- 05000316/LER-1983-049-01, /01T-0:on 830602,pressure Gauge Discovered Missing from Outside Wall of Outer Air Lock Door in Upper Containment.Cause Under Investigation.Pressure Gauge Replaced + (10:30:02, 15 December 2024)
- ML20072E817 + (10:30:03, 15 December 2024)
- ML20072E814 + (10:30:04, 15 December 2024)
- NRC-94-0063, Monthly Operating Rept for Jul 1994 for Fermi 2 + (10:30:04, 15 December 2024)
- 3F0894-05, Monthly Operating Rept for Jul 1994 for Crystal River Unit 3 + (10:30:05, 15 December 2024)
- RBG-15-265, Interim Deficiency Rept DR-103 Re Linear Indications Found in Lifting Lugs on Containment Dome.Initially Reported on 830325.Util Awaiting Addl Info from Ae.Next Rept Expected by 830811 + (10:30:05, 15 December 2024)
- ML20072E808 + (10:30:06, 15 December 2024)
- LIC-94-0166, Monthly Operating Rept for Jul 1994 for Fort Calhoun Station Unit 1 + (10:30:07, 15 December 2024)
- ML20072E804 + (10:30:07, 15 December 2024)
- 05000277/LER-1994-004-01, :on 940718,HPCI System Was Declared Inoperable. Caused by Problem W/Hpci Signal Isolator.Signal Isolating Device XS-2-23-144 Removed & Replaced + (10:30:09, 15 December 2024)
- 1CAN089404, Monthly Operating Rept for Jul 1994 for ANO Unit 1 + (10:30:10, 15 December 2024)
- ML20072E792 + (10:30:12, 15 December 2024)
- ML20072E793 + (10:30:12, 15 December 2024)
- 2CAN089402, Monthly Operating Rept for Jul 1994 for ANO Unit 2 + (10:30:13, 15 December 2024)
- ML20072E785 + (10:30:14, 15 December 2024)
- ML20072E775 + (10:30:14, 15 December 2024)
- 05000339/LER-1983-046-03, /03L-0:on 830527-29,31 & 0614 & 22,individual Rod Position Indicators Deviated from Group Demand Position. Caused by Instrument Drift.Indicator Channels Recalibr + (10:30:16, 15 December 2024)
- ML20072E765 + (10:30:17, 15 December 2024)
- ML20072E755 + (10:30:17, 15 December 2024)
- 05000395/LER-1983-050-03, /03L-1:on 830520 & 22,sump Pump XPP-138 Lost Prime & Became Incapable of Pumping Water,Rendering Reactor Bldg Sump Leakage Detection Sys Inoperable.Caused by Vapor Lock. Pump Primed.Air Vent Valve Will Be Installed + (10:30:19, 15 December 2024)
- AECM-83-0341, RO 83-042/0:on 830502,smoke Detectors in Corridor of Control Bldg Covered to Allow Welding.Hourly Fire Watch Established. Detectors Will Be Restored by 830725 + (10:30:20, 15 December 2024)
- ML20072E743 + (10:30:20, 15 December 2024)
- ML20072E740 + (10:30:21, 15 December 2024)
- RBG-15-267, Interim Deficiency Rept DR-119 Re Failure of Threaded Weld Studs During Const of Cable Tray Supports.Initially Reported on 830517.Investigation Incomplete.Interim or Final Rept Expected by 830802 + (10:30:21, 15 December 2024)
- ML20072E733 + (10:30:22, 15 December 2024)
- 05000354/LER-1994-009-02, :on 940718,discovered Design Deficiency in Orginal Plant Design.Caused by Design Change Omitting Necessary Wiring Changes for Control Switch.Personnel Involved Have Been Counseled + (10:30:27, 15 December 2024)
- AECM-83-0336, Updated RO 83-015/2:three Open Penetrations Identified. Caused by Incomplete Design Drawings or Const Oversight.Matl Nonconformance Repts Initiated to Correct Deficiencies. Estimated Restoration Date Is 830725 + (10:30:28, 15 December 2024)
- ML20072E729 + (10:30:28, 15 December 2024)
- ML20072E722 + (10:30:29, 15 December 2024)
- ML20072E725 + (10:30:29, 15 December 2024)
- ML20072E714 + (10:30:30, 15 December 2024)
- ML20072E719 + (10:30:30, 15 December 2024)
- BSEP-83-1769, Ro:On 830512 & 19,Fire Doors 106,109 & 201 Declared Inoperable Due to High Differential Air Pressure Across Each Door Preventing Automatic self-closure.Evaluation of Air Pressure Problem Underway + (10:30:31, 15 December 2024)
- ML20072E706 + (10:30:32, 15 December 2024)
- ML20072E709 + (10:30:32, 15 December 2024)
- AECM-83-0225, Revises 800319 Commitment in Response to Question 8 in IE Bulletin 79-08 Re Maint & Test Procedures.Operations Section Procedure Will Specify Verification by Test or Insp of Operability of Redundant safety-related Sys + (10:30:33, 15 December 2024)
- ML20072E703 + (10:30:33, 15 December 2024)
- ML20072E700 + (10:30:34, 15 December 2024)
- 05000305/LER-1983-013-03, /03L-0:on 830520,App J Type B & C Local Leak Rate Testing Identified Six Containment Isolation Valves W/ Unacceptable as-found Leakage.Cause Not Stated.Valves Repaired & Tested Satisfactorily + (10:30:39, 15 December 2024)
- ML20072E690 + (10:30:40, 15 December 2024)
- ML20072E678 + (10:30:41, 15 December 2024)
- ML20072E685 + (10:30:41, 15 December 2024)
- 05000338/LER-1983-040-03, /03L-0:on 830603,w/unit at 100% Power,Fire Door S71-19 Would Not Close W/O Assistance.Caused by Reclosure Mechanism Out of Adjustment.Mechanism Readjusted.Design Mods to Fire Door Being Investigated + (10:30:43, 15 December 2024)