Requests Review of Util Recovery Plan to Correct Deficiencies Associated W/Nrc 820623 Stop Work Order. Appropriate Procedures & Instructions Revised & Training Accomplished & Documented
ML20072E706
Person / Time
Site: Clinton Constellation icon.png
Issue date: 06/15/1983
From: Hall D
ILLINOIS POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
4250-L, U-10068, NUDOCS 8306270117
Download: ML20072E706 (1)


Text

V 1 4250-L

/LLINDIS POWER 00MPANY yp y_1onsg CLINTON POWER STATION, P.O. BOX 678, CLINTON. ILLINO!S 61727

. Tune 15, 1983 g g3g Docket No. 50-461 AMA PAO

%# I'2Bil., 1M9_

i l

r.! w!

l Mr. James G. Keppler ;it  ; j p:nr Regional Administrator x l Region III -

U.S. Nuclear Regulatory Commission 799 Roosevelt Road

! Glen Ellyn, Illinois 60137

Subject:

Stop Work Order No. 019 - Structural Steel

Dear Mr. Keppler:

On June 23, 1982 a Stop Work Order was initiated on struc-tural steel installation. A recovery plan was developed to correct the deficiencies associated with the Stop Work Order.

Illinois Power Company has completed the portions of the recovery plan which are necessary to lift the Stop Work Order.

The appropriate procedures and instructions have been revised and training has been accomplished and documented.

It is requested that you review Illinois Power Company's actions and concur in lifting the Stop Work Order on structural steel installation.

Si erely yours,

./

D. P. Hall Vice President REC /j f cc: NRC Senior Resident Inspector Manager - Quality Assurance Director - Office of I&E, USNRC, Washington, DC 20555 Illinois Department of Nuclear Safety 8306270117 830615 PDR ADOCK 0500046 h! /0 8

jg 2 0 G83 a