Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20072V454 + (09:10:02, 15 December 2024)
- 3F0994-01, Summarizes Results of Emergency Diesel Generator Maintenance & Testing at Facility.Tests Performed Demonstrates Capability of Machines to Deliver Power to Emergency Loads at Voltage & Frequency + (09:10:03, 15 December 2024)
- ML20072V441 + (09:10:07, 15 December 2024)
- ML20072V434 + (09:10:08, 15 December 2024)
- ML20072V425 + (09:10:09, 15 December 2024)
- ML20072V423 + (09:10:10, 15 December 2024)
- ML20072V421 + (09:10:11, 15 December 2024)
- ML20072V407 + (09:10:12, 15 December 2024)
- 05000387/LER-1983-038-03, /03L-0:on 830304,Zone 3 Reactor Bldg Normal Ventilation Fans Tripped During Performance of Isolation Sys Surveillance Test.Possibly Caused by Difficulty of Startup Procedure for Sys.Operating Procedure Revised + (09:10:14, 15 December 2024)
- 05000387/LER-1983-038, Forwards LER 83-038/03L-0 + (09:10:15, 15 December 2024)
- ML20072V376 + (09:10:15, 15 December 2024)
- ML20072V364 + (09:10:16, 15 December 2024)
- ML20072V360 + (09:10:17, 15 December 2024)
- ML20072V359 + (09:10:17, 15 December 2024)
- HL-4663, Forwards Partial Revision to 940225 Amend Request,Resulting from Meeting W/Nrc & Resolution of Industry Generic Issues + (09:10:18, 15 December 2024)
- ML20072V353 + (09:10:19, 15 December 2024)
- ML20072V350 + (09:10:19, 15 December 2024)
- BSEP-94-0356, Application for Amends to Licenses DPR-62 & DPR-71,revising Frequency for Verifying Position of drywell-suppression Chamber Vacuum Breakers from at Least Once Every 72 H to at Least Once Every 14 Days,Consistent w/NUREG-1433 + (09:10:20, 15 December 2024)
- BECO-LTR-94-102, Responds to GL 94-02, Long-Term Solutions & Upgrade of Interim Operating Recommendations for Thermal-Hydraulic Instabilities in Bwrs. Util Implemented Interim Corrective Actions Specified in NRC Bulletin 88-007,Suppl 1 + (09:10:20, 15 December 2024)
- BSEP-94-0350, Responds to GL 94-02, Long-Term Solutions & Upgrade of Interim Operating Recommendations for Thermal-Hydraulic Instabilities in Bwrs + (09:10:21, 15 December 2024)
- ML20072V328 + (09:10:25, 15 December 2024)
- 05000278/LER-1983-005-01, /01T-0:on 830312,refueling Bridge Interlock Inoperable.Caused by out-of-adjustment Interlock Switch. Switch Adjusted + (09:10:29, 15 December 2024)
- ML20072V320 + (09:10:30, 15 December 2024)
- 05000499/LER-1991-003-01, :on 910314,reactor Trip Occurred Due to Actuation of Generator Protective Relay.Caused by Inadequate Operating Procedures.Procedures Revised & Event Included in Requalification Training + (09:10:31, 15 December 2024)
- 05000336/LER-1983-010, Forwards LER 83-010/03L-0.Detailed Event Analysis Encl + (09:10:33, 15 December 2024)
- ML20072V314 + (09:10:33, 15 December 2024)
- 05000278/LER-1983-005, Forwards LER 83-005/01T-0.Detailed Event Analysis Submitted + (09:10:34, 15 December 2024)
- ML20072V308 + (09:10:34, 15 December 2024)
- ML20072V284 + (09:10:35, 15 December 2024)
- ML20072V277 + (09:10:35, 15 December 2024)
- FVY-82-127, Responds to NRC Re Violations Noted in IE Insp Rept 50-271/82-13.Corrective Actions:Qa Audit Program Performed by Hittman Nuclear & Development Corp Audited & Found Acceptable.Violation Disavowed + (09:10:36, 15 December 2024)
- ML20072V251 + (09:10:37, 15 December 2024)
- ML20072V253 + (09:10:37, 15 December 2024)
- BSEP-94-0329, Responds to NRC Violations Noted in Insp Rept 50-324/92-32 & 50-325/94-32.Corrective Action:Currently Evaluating Effects of Increased on-site Dose as Result of Dual Unit Simultaneous Hydrogen Injection Operation + (09:10:38, 15 December 2024)
- ST-HL-AE-4885, Forwards Rev 23 to Physical Security Plan.Encl Withheld (Ref 10CFR73.21) + (09:10:38, 15 December 2024)
- ML20072V224 + (09:10:42, 15 December 2024)
- ML20072V211 + (09:10:42, 15 December 2024)
- ML20072V208 + (09:10:43, 15 December 2024)
- ML20072V200 + (09:10:44, 15 December 2024)
- ML20072V197 + (09:10:45, 15 December 2024)
- ML20072V193 + (09:10:47, 15 December 2024)
- ML20072V192 + (09:10:49, 15 December 2024)
- ML20072V191 + (09:10:53, 15 December 2024)
- ML20072V190 + (09:10:54, 15 December 2024)
- ML20072V186 + (09:10:55, 15 December 2024)
- 05000325/LER-1994-011-01, :on 940820,unplanned Isolation of CAC System & Drywell Floor & Equipment Drain System Isolation Occurred. Caused by Control Logic Relay Contacts Opening.Relay Replaced & Testing Performed + (09:10:57, 15 December 2024)
- ML20072V168 + (09:10:58, 15 December 2024)
- ST-HL-AE-4869, Forwards 1993 Annual Financial Repts for Licensees + (09:10:59, 15 December 2024)
- ML20072V158 + (09:10:59, 15 December 2024)
- ML20072V156 + (09:11:00, 15 December 2024)
- ML20072V149 + (09:11:01, 15 December 2024)
- 05000353/LER-1994-008-01, :on 940813,Unit 2 Max Power Level of 100% Exceeded by Approx 2% Due to Malfunction of Recirculation Pump a M/G Set Scoop Tube Positioner Servo Amplifier.Servo Amplifier Will Be Adjusted + (09:11:03, 15 December 2024)