MONTHYEARML20217M3801999-10-21021 October 1999 Forwards Insp Rept 50-263/99-06 on 990813-0923.Four Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20217G0711999-10-13013 October 1999 Forwards Insp Rept 50-263/99-12 on 990913-17.No Violations Noted ML20216J2491999-09-30030 September 1999 Ack Receipt of 980804,990626 & 0720 Ltrs in Response to GL 98-01,suppl 1, Year 2000 Readiness of Computer Sys at Npps. Staff Review Has Concluded That All Requested Info Has Been Provided ML20217B1421999-09-30030 September 1999 Informs That on 990902,NRC Staff Completed mid-cicle Plant Performance Review of Monticello Nuclear Generating Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Information & to Plan for Insp Activities ML20212K9131999-09-30030 September 1999 Refers to 990920 Meeting Conducted at Monticello Nuclear Generating Station to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PRA ML20216J8091999-09-24024 September 1999 Informs That New Diaphragm Matl Has Corrected Sticking Problem Associated with Increased Control Rod Drive Scram Times.Augmented Testing of Valves at Monticello Has Been Discontinued ML20216G4341999-09-24024 September 1999 Forwards Exam Rept 50-263/99-301 on 990823-26.Violation Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy.Test Was Administered to Two Applicants. Both Applicants Passed All Sections of Exam ML20212G7171999-09-24024 September 1999 Submits Semiannual Status Update on Project Plans for USAR Review Project & Conversion to Its.Conversion Package Submittal Continues to Be Targeted for Aug of 2000 ML20212G9801999-09-23023 September 1999 Refers to Resolution of Unresolved Items Identified Re Security Alarm Station Operations at Both Monitcello & Prairie Island ML20212F0901999-09-21021 September 1999 Confirms Discussion Between M Hammer & Rd Lanksbury to Have Routine Mgt Meeting on 991005 in Lisle,Il.Purpose of Meeting to Discuss Improvement Initiatives in Areas of Operations & Equipment Reliability ML20212A9761999-09-0909 September 1999 Submits 1999 Annual Rept of Any Changes or Errors Identified in ECCS Analytical Models or Applications ML20217A5751999-09-0909 September 1999 Forwards Individual Exam Results for Licensee Applicants Who Took Aug 1999 Initial License Exam.Without Encls ML20211Q6981999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Monticello Operator License Applicants During Wks of 010604 & 11.Validation of Exam Will Occur at Station During Wk of 010514 ML20211L1981999-09-0101 September 1999 Forwards Insp Rept 50-263/99-05 on 990702-0812.No Violations Noted ML20211K7971999-09-0101 September 1999 Informs That Util Reviewed Rvid as Requested in NRC .Recommended Corrections Are Listed ML20211K2591999-08-27027 August 1999 Forwards NSP Co Fitness for Duty Program Performance Data for Six Month Period Ending 990630 ML20211F9961999-08-26026 August 1999 Forwards Effluent & Waste Disposal Semi-Annual Rept for 990101-990630, Revised Effluent & Waste Disposal Semi-Annual Rept for 980701-981231 & Revs to ODCM for Monitcello Nuclear Generating Plant ML20211C9501999-08-23023 August 1999 Forwards Rev 17 to Monticello Nuclear Generating Plant USAR, Updating Info in USAR to Reflect Implementation of Increase in Licensed Core Thermal Power from 1,670 Mwt to 1,775 Mwt.Rept of Changes,Tests & Experiments Not Included ML20210U1831999-08-12012 August 1999 Revises 980202 Commitment Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions ML20210T9601999-08-12012 August 1999 Provides Rept on Status of Util RPV Feedwater Nozzle Insps Performed in Response to USI A-10 Re BWR Nozzle Cracking ML20210Q0341999-08-0404 August 1999 Forwards SE Granting Licensee 980724 Relief Request 10 Re Third 10-year Interval ISI Program Plan,Entitled, Limited Exam ML20210H0861999-07-28028 July 1999 Forwards Insp Rept 50-263/99-04 on 990521-0701.No Violations Noted.Licensee Conduct at Monticello Facility Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Appropriate Radiological Controls ML18107A7051999-07-20020 July 1999 Provides Suppl Info Which Supersedes Info in 990625 Ltr in Response to NRC RAI Re GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML20212H3191999-07-16016 July 1999 Forwards Aug 1999 Monticello RO Exam Package,Including Revised Outlines.All Changes Are in Blue Font ML20209G5621999-07-14014 July 1999 Forwards Insp Rept 50-263/99-11 on 990621-24.No Violations Noted.Objective of Insp,To Determine Whether Monticello Nuclear Generating Station Emergency Plan Adequate & If Station Personnel Properly Implemented Emergency Plan ML20196J5351999-07-0202 July 1999 Discusses GL 92-01,Rev 1,Supp 1, Rv Integrity, Issued by NRC on 950515 & NSP Responses & 980917 for Monticello Npp.Informs That Staff Revised Info in Rvid & Released Info as Rvid Version 2 ML20196J9681999-07-0101 July 1999 Informs That in Sept 1998,Region III Received Rev 20 to Portions of Util Emergency Plan Under 10CFR50.54(q).Based on Determination That Changes Do Not Decrease Effectiveness of Licensee Emergency Plan,No NRC Approval Required ML20209B6151999-06-25025 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Y2K Readiness Disclosure Attached ML20196H2291999-06-24024 June 1999 Responds to Administrative Ltr 99-02,dtd 990603,requesting Licensee to Provide Estimate of Licensing Action Submittals Anticipated.Four New Submittals Per Year Are Anticipated ML20207D5851999-05-25025 May 1999 Submits Info Re Partial Fulfillment of License Conditions Placed on Amend 101,which Approved Use of Ten Exceptions for 24 Months Subject to Listed App C Conditions.Util Will Submit Second Rept to Obtain Approval for Continued Use ML20206S0911999-05-17017 May 1999 Forwards Response to NRC 990324 RAI Re Proposed Amend to pressure-temp Limits & Surveillance Capsule Withdrawal Schedule, .Supporting Calculations Also Encl ML20206N5601999-05-13013 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Cm Craig Will Be Section Chief for Monticello Npp.Organization Chart Encl ML20206G2181999-05-0505 May 1999 Discusses Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits, Dtd 960110,for Plant ML20206G4901999-05-0404 May 1999 Forwards Staff Review of Licensee 960508 Response to NRC Bulletin 96-002, Movement of Heavy Loads Over Sf,Over Fuel in Rc or Over Safety-Related Equipment, .Overall, Responses Acceptable.Tac M95610 Closed ML20206G7741999-05-0303 May 1999 Forwards Insp Rept 50-263/99-02 on 990223-0408.One Violation Occurred & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20206D1651999-04-27027 April 1999 Forwards Radiation Environ Monitoring Program for MNGP for Jan-Dec 1998, Per Plant TS 6.7.C.1.Ltr Contains No New NRC Commitments or Modifies Any Prior Commitments ML20205N0821999-04-12012 April 1999 Forwards SE of NSP Response to NRC GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Licensee Adequately Addressed Actions Requested in GL ML20205N4811999-04-0909 April 1999 Forwards Licensing Requalification Insp Rept 50-263/99-10 on 990308-12.No Violations Noted.However,Inspectors Through Observation of Simulator Scenario Exams Noted Difficulties in Ability of SM to Simultaneously Implement Duties of SM ML20205N5301999-04-0909 April 1999 Discusses Arrangements Made on 990406 for Administration of Licensing Exams at Monticello Nuclear Generating Station During Wk of 990823.Requests That Exam Outlines Be Submitted by 990128 & Supporting Ref Matls by 990719 ML20196K7831999-03-31031 March 1999 Forwards Decommissioning Funding Status Rept for Monticello & Prairie Island Nuclear Generating Plants,Per Requirements of 10CFR50.75(f)(1) ML20205H5731999-03-29029 March 1999 Submits Required 1998 Actual & 1999 Projected Cash Flow Statements for Monticello Nuclear Generating Plant & PINGP, Units 1 & 2.Encl Contains Proprietary Info.Proprietary Info Withheld,Per 10CFR2.790(b)(1) ML20205C4851999-03-26026 March 1999 Informs That on 990203,NRC Staff Completed PPR of Nuclear Plant.Staff Conducts Reviews for All Operating NPPs to Develop an Integrated Understanding of Safety Performance ML20205C6561999-03-26026 March 1999 Submits Semiannual Update on Project Plans for USAR Review Project & Conversion to ITS ML20205A5881999-03-24024 March 1999 Forwards Request for Addl Info Re Submittal Requesting Rev of pressure-temperature Limits & Surveillance Capsule Withdrawal Schedule ML20204H4711999-03-18018 March 1999 Forwards SER Concluding That Util Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Monticello & Adequately Addressed Actions Requested in GL 96-05 ML20207H5161999-03-11011 March 1999 Forwards Insp Rept 50-263/99-01 on 990112-0222.No Violations Noted ML20207F4091999-02-28028 February 1999 Forwards Fitness for Duty Program Performance Data for Six Month Period from 980701-981231,IAW 10CFR26.71 ML20207F6741999-02-24024 February 1999 Forwards Summary of Nuclear Property Insurance Maintained at Monticello & Prairie Island Nuclear Generating Plants ML20207F6901999-02-23023 February 1999 Forwards Effluent & Waste Disposal Semi-Annual Rept for 980701-981231, Off-Site Radiation Dose Assessment for 980101-981231 & Revised Effluent & Waste Disposal Semi- Annual Rept for 980101-980630, for Monticello ML20203F2541999-02-10010 February 1999 Informs That Beginning 990216,DE Hills Will Be Chief of Operations Branch Which Includes Operator Licensing Function 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20216J8091999-09-24024 September 1999 Informs That New Diaphragm Matl Has Corrected Sticking Problem Associated with Increased Control Rod Drive Scram Times.Augmented Testing of Valves at Monticello Has Been Discontinued ML20212G7171999-09-24024 September 1999 Submits Semiannual Status Update on Project Plans for USAR Review Project & Conversion to Its.Conversion Package Submittal Continues to Be Targeted for Aug of 2000 ML20212A9761999-09-0909 September 1999 Submits 1999 Annual Rept of Any Changes or Errors Identified in ECCS Analytical Models or Applications ML20211K7971999-09-0101 September 1999 Informs That Util Reviewed Rvid as Requested in NRC .Recommended Corrections Are Listed ML20211K2591999-08-27027 August 1999 Forwards NSP Co Fitness for Duty Program Performance Data for Six Month Period Ending 990630 ML20211F9961999-08-26026 August 1999 Forwards Effluent & Waste Disposal Semi-Annual Rept for 990101-990630, Revised Effluent & Waste Disposal Semi-Annual Rept for 980701-981231 & Revs to ODCM for Monitcello Nuclear Generating Plant ML20211C9501999-08-23023 August 1999 Forwards Rev 17 to Monticello Nuclear Generating Plant USAR, Updating Info in USAR to Reflect Implementation of Increase in Licensed Core Thermal Power from 1,670 Mwt to 1,775 Mwt.Rept of Changes,Tests & Experiments Not Included ML20210U1831999-08-12012 August 1999 Revises 980202 Commitment Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions ML20210T9601999-08-12012 August 1999 Provides Rept on Status of Util RPV Feedwater Nozzle Insps Performed in Response to USI A-10 Re BWR Nozzle Cracking ML18107A7051999-07-20020 July 1999 Provides Suppl Info Which Supersedes Info in 990625 Ltr in Response to NRC RAI Re GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML20212H3191999-07-16016 July 1999 Forwards Aug 1999 Monticello RO Exam Package,Including Revised Outlines.All Changes Are in Blue Font ML20209B6151999-06-25025 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Y2K Readiness Disclosure Attached ML20196H2291999-06-24024 June 1999 Responds to Administrative Ltr 99-02,dtd 990603,requesting Licensee to Provide Estimate of Licensing Action Submittals Anticipated.Four New Submittals Per Year Are Anticipated ML20207D5851999-05-25025 May 1999 Submits Info Re Partial Fulfillment of License Conditions Placed on Amend 101,which Approved Use of Ten Exceptions for 24 Months Subject to Listed App C Conditions.Util Will Submit Second Rept to Obtain Approval for Continued Use ML20206S0911999-05-17017 May 1999 Forwards Response to NRC 990324 RAI Re Proposed Amend to pressure-temp Limits & Surveillance Capsule Withdrawal Schedule, .Supporting Calculations Also Encl ML20206D1651999-04-27027 April 1999 Forwards Radiation Environ Monitoring Program for MNGP for Jan-Dec 1998, Per Plant TS 6.7.C.1.Ltr Contains No New NRC Commitments or Modifies Any Prior Commitments ML20196K7831999-03-31031 March 1999 Forwards Decommissioning Funding Status Rept for Monticello & Prairie Island Nuclear Generating Plants,Per Requirements of 10CFR50.75(f)(1) ML20205H5731999-03-29029 March 1999 Submits Required 1998 Actual & 1999 Projected Cash Flow Statements for Monticello Nuclear Generating Plant & PINGP, Units 1 & 2.Encl Contains Proprietary Info.Proprietary Info Withheld,Per 10CFR2.790(b)(1) ML20205C6561999-03-26026 March 1999 Submits Semiannual Update on Project Plans for USAR Review Project & Conversion to ITS ML20207F4091999-02-28028 February 1999 Forwards Fitness for Duty Program Performance Data for Six Month Period from 980701-981231,IAW 10CFR26.71 ML20207F6741999-02-24024 February 1999 Forwards Summary of Nuclear Property Insurance Maintained at Monticello & Prairie Island Nuclear Generating Plants ML20207F6901999-02-23023 February 1999 Forwards Effluent & Waste Disposal Semi-Annual Rept for 980701-981231, Off-Site Radiation Dose Assessment for 980101-981231 & Revised Effluent & Waste Disposal Semi- Annual Rept for 980101-980630, for Monticello ML20203A3081999-01-28028 January 1999 Forwards TS Page 60d,as Supplement 3 to 971125 LAR Re CST Low Level Hpci/Rcic Suction Transfer.Page Includes NRC Approved Amend 103 Changes for Use by NRC in Issuing SER ML20202F7821999-01-27027 January 1999 Forwards 1999 Four Year Simulator Certification Rept for MNGP Simulation Facility, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(vi).Ltr Contains No New Commitments or Modifies Any Prior Commitments ML20206S0331999-01-20020 January 1999 Submits Annual Rept of Safety & Relief Valves Failure & Challenges ML20206P1221998-12-31031 December 1998 Forwards LAR for License DPR-22,revising TS pressure-temp Curves Contained in Figures 3.6.1,3.6.2,3.6.3 & 3.6.4, Deleting Completed RPV Sample SRs & Requirement to Withdraw Specimen at Next Refueling Outage & Removing Redundant SR ML20198M3271998-12-28028 December 1998 Submits Change to Commitment for Submittal of ITS Application.Util Plans to Provide ITS Conversion Package Submittal to NRC in Dec of 2000 ML20198J7511998-12-22022 December 1998 Informs of Completion of Listed Commitment Made in Re Severe Accident Mgt. Severe Accident Mgt Guidelines Have Been Assessed,Plant Procedures Have Been Modified & Training of Affected Plant Staff Has Been Completed ML20198J4311998-12-21021 December 1998 Forwards Rev 2 to SIR-97-003, Review of Test Results of Two Surveillance Capsules & Recommendations for Matls Properties & Pressure-Temp Curves to Be Used for Monticello Rpv. Under Separate Cover,Licensee Is Providing LAR to Revise Curves ML20198J7711998-12-14014 December 1998 Documents 981214 Discussion with NRC Staff Re Deviation from Emergency Procedure Guidelines ML20195C8781998-11-11011 November 1998 Forwards Supplement to 971125 License Amend Request Re Condensate Storage Tank Low Level Suction Transfer Setpoints for HPCI Sys & Reactor Core Isolation Cooling Sys ML20195C9631998-11-11011 November 1998 Forwards 120-day Response to NRC GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Construction & Protective Coating Deficiencies & Foreign Matl in Containment ML20195E2261998-11-10010 November 1998 Submits Suppl 1 to Util Response to NRC Request for Addl Info Re 981118 Request for Deviation from Emergency Procedure Guidelines ML20155H6591998-11-0404 November 1998 Forwards Response to 980910 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20155F9091998-10-27027 October 1998 Forwards Master Table of Contents to Rev 16 of Usar.Info Was Inadvertantly Omitted at Time of 981023 Submittal 05000263/LER-1998-005, Forwards LER 98-005-00,re HPCI Being Removed from Service to Repair Steam Leak in Drain Trap Bypass.Commitments Made by Util Are Listed1998-10-21021 October 1998 Forwards LER 98-005-00,re HPCI Being Removed from Service to Repair Steam Leak in Drain Trap Bypass.Commitments Made by Util Are Listed ML20154L9321998-10-12012 October 1998 Forwards Suppl 2 to LAR & Suppl 980319,which Proposed Changes to Ts,App a of Operating License DPR-22 for Mngp.Number of Addl Typos & One Title Change on Pages Associated with Amend Request Have Been Identified 05000263/LER-1998-004, Forwards LER 98-004-00 Re Manual Scram Inserted Following Pressure Transient Closes Air Ejector Suction Isolation Valves & Trips Offgas Recombiners.Ler Contains Listed Commitment1998-10-0909 October 1998 Forwards LER 98-004-00 Re Manual Scram Inserted Following Pressure Transient Closes Air Ejector Suction Isolation Valves & Trips Offgas Recombiners.Ler Contains Listed Commitment ML20154L8671998-10-0909 October 1998 Forwards Suppl 1 to LAR for License DPR-22, Replacing Exhibits B & C of Original Submittal to Reflect Item 2 & Subsequent Changes.Request for APRM Flow Converter Calibr Interval Extension,Withdrawn ML20154J6201998-10-0505 October 1998 Forwards Rev 49 to Monticello Security Plan.Encl Withheld, Per 10CFR73.21 ML20153F5351998-09-25025 September 1998 Submits Semiannual Status Update on Project Plans for USAR Review Project & Conversion to Improved TS ML20153F0051998-09-25025 September 1998 Forwards Suppl 1 to 971031 Application for Amend to License DPR-22,replacing Exhibit C Which Contains TS Pages Incorporating Proposed Changes Described in Original 971031 Request ML20153D8561998-09-17017 September 1998 Forwards Rev 17 to EPIP A.2-414, Large Vol Liquid Sample &/ or Dissolved Gas Sample Obtained at Post Accident Sampling Sys. Superseded Procedures Should Be Destroyed.Ltr Contains No New NRC Commitments,Nor Does It Modify Prior Commitments ML20153D1441998-09-17017 September 1998 Informs NRC That Listed Commitments 1 & 3 Were Completed by End of 1998 Refueling Outage.Commitments Involved Final Disposition of Remaining Outlier Components Re All Known Outstanding Work Associated with GL 87-02,Suppl 1,USI A-46 ML20153E0331998-09-17017 September 1998 Forwards Response to NRC 980629 RAI Re RPV Weld Chemistry Values Previously Submitted as Part of Plant Licensing Basis.Next Monticello RPV Sample Capsule Scheduled to Be Removed During 1999/2000 Refueling Outage ML20153E9011998-09-0909 September 1998 Forwards Rev 1 to MNGP Colr,Cycle 19, Incorporating Changes to power-flow Maps in Figures 6 & 7.Changes Made to Correct Errors in Stability Exclusion Region & Stability Buffer Region Shown on Rev 0 ML20151S7401998-08-28028 August 1998 Responds to NRC Re Violations Noted in Insp Rept 50-263/98-09.Corrective Actions:Procedure 4 AWI-04.04.03 Will Be Revised to Eliminate Term Urgent from Section 4.3.1.D ML20238E8201998-08-26026 August 1998 Forwards Effluent & Waste Disposal Semi-Annual Rept for Jan-June 1998 & Revised Effluent & Waste Disposal Semi- Annual for Jul-Dec 1997. Ltr Contains No New NRC Commitments,Nor Does It Modify Any Prior Commitments ML20237E9741998-08-26026 August 1998 Forwards Rev 4 to EWI-09.04.01, Inservice Testing Program. Rev of Inservice Testing Program Reflects Valves Added as Result of Component Mods Recently Performed ML20237E6821998-08-25025 August 1998 Forwards fitness-for-duty Program Performance Data for Six Months Period Ending 980630 1999-09-09
[Table view] |
Text
-=
Northem States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401-1927 Telephone (612) 330-5500 September 9, 1994 NRC Generic Letter 94-02 1
US Nuclear Regulatory Commission l Attn: Document Control Desk Washington, DC 20555 l
MONTICELLO NUCLEAR GENERATING PIANT Docket No. 50-263 License No. DPR-22 Response to NRC Generic Letter 94-02, "Long-Term Solutions and Upgrade of Interim Operating Recommendations for Thermal-Hydraulic Instabilities in Boiline Water Reactors The purpose of this letter is to provide our response to NRC Generic Letter 94-02, dated July 11, 1994. The Generic Letter requests licensees to submit information regarding actions being taken to address thermal-hydraulic instabilities in boiling water reactors.
Reporting Requirement No. 1 of the Generic Letter requires that within sixty (60) days of the date of the letter all BWR addressees (except Big Rock Point):
" (a) Inform the NRC, in writing and under oath or affirmation, of the licensee's plans and status with respect to the actions requested 1 in this letter; and l (b) If the licensee does not plan to take an action requested in this l 1etter, the reasons for not taking the action, a description of the nature of any substitute action, and a schedule for completing or implementing the substitute action;"
Monticello Response: Attachment 2 of this submittal provides the information requested by Reporting Requirement 1 of NRC Generic Letter 94-02.
Reporting Requirement No. 2 of the Generic Letter states:
"If the licensee plans to tako an action requested, or a substitute action, within thirty (30) days of the completion of the action, inform the NRC, in writing and under oath of affirmation, of the action taken and verify its completion or implementation."
Monticello Response: As identified in Attachment 2, Monticello has completed Requested Action 1.b of Generic Letter 94-02. We will notify N LJn
- d 9409190251 940909 PDR ADOCK 05000263 p PDR [,
t
I I 1
l l USNRC NORTHERN STATES POWER COMPANY
- j. September 9, 1994' l l Page 2- .
the NRC, in writing, within thirty-(30) days of completion of Requested .
- Actions 1.a and 2 of Generic Letter-94-02.
l This letter contains the following new NRC. commitments:
Operating procedures will be revised and operator training provided .
-prior to the end of 1994 to require initiating'a manual reactor scram under all circumstances in which there are no recirculation pumps ~
operating while the reactor is in the RUN mode, I Monticello will' submit a. licensing topical report demonstrating applicability of stability solution Option I-D within three months following'NRC issuance of the' Safety Evaluation _ Report for the Option I - .I
'D. lead plant. A schedule for implementation of our.long-term stability j solution will be' submitted with our licensing topical report. ,
l We will notify the NRC, in writing, within thirty (30) days of completion of Requested Actions 1.a and 2 of Generic Letter 94-02. t Please contact Marv Engen, Sr Licensing Engineer, at.(612).295-1291-if you ['
require further information.
L l
/)V(({y n j 'E William J Hill l Manager L
Monticello Nuclear Generating Plant c: Regional Administrator - III, NRC NRR Project Manager, NRC Sr Resident Inspector, NRC State of Minnesota Attn: Kris Sanda ,
J Silberg i
Attachment 1: Affidavit to the United States Nuclear Regulatory Commission l Attachment 2: Monticello Status and Planned Actions With Respect to I Generic Letter 94-02 Requested Actions
l., . .
l l Attachment 1 UNITED STATES NUCLEAR REGULATORY COMMISSION l NORTHERN STATES POWER COMPANY MONTICELID NUCLEAR GENERATING PLANT DOCKET NO. 50-263 Response to NRC Generic Letter 94-02, "Long-Term Solutions and Upgrade of Interim Operating Recommendations for Thermal-Hydraulic Instabilities in Boiline Water Reactors l
l Northern States Power Company, a Minnesota corporation, hereby provides the 60 day response information required by NRC Generic Letter 94-02, as well as the
, completion information for Requested Action 1.b.
l This letter contains no restricted or other defense information.
NORTHERN STATES POWER COMPANY By M *r' N William # H1'll" Manager Monticello Nuclear Generating Plant On this day of b O /W before me a notary public in and for said County, pers$nally appeared William J Hill, Manager, Monticello Nuclear Generating Plant, and being first duly sworn acknowledged that he is authorized to execute this document on behalf of Northern States Power Company, that he knows the contents thereof, and that to the best of his knowledge, information, and belief the statements made in it are true and that it is not interposed for delay.
C A M lJa//n a f f/
. _ w ::::::::: -
JUDYL KLAPPERICK NOTARY PUBUC MINNESOTA l ANOKACOUNTY My Commssion Expires Sept 29,1997
( f
, m v::::::.:::::::::.s w + M w v" l
l l
l l
o . .
I Attachment 2 Monticello Status and Planned Actions With Respect to Generic Letter 94-02 Requesten actions Reauested Action 1 j "All Licensees of BWRs, except for Big Rock Point which does not have the capability for operation under variable flow conditions, are requested to review their current procedures and training programs and modify them as appropriate to strengthen the administrative provisions intended to avoid power oscillations or to detect and suppress them if they occur prior to implementation of the long-term solutions. The experience gained at WNP-2 should be a primary guide in this review. In doing this, each licensee of a BWR (except for Big Rock Point) should:
- a. Ensure that procedural requirements exist for initiation of a manual scram under all operating conditions when all recirculation pumps trip (or there are no pumps operating) with the reactor in the RUN mode, and ensure that operators are aware of the potential for very large power oscillations and the potential for exceeding core thermal safety limits before automatic protection systems function following the trip of all recirculation pumps (the procedural manual scram is not necessary after long-term solutions are approved and implemented for individual plants); and
- b. Ensure that factors important to core stability characteristics (e.g., radial and axial peaking, feedvater temperature, and thermal hydraulic compatibility of mixed fuel types) are controlled within appropriate limits consistent with the core design, power / flow exclusion boundaries, and core monitoring capabilities of the reactor in question, and that these factors are controlled through procedures governing changes in reactor power, including startup and shutdown, particularly at low-flow operating conditions. Each licensee should review its procedures and determine if instability can be avoided by these procedures and if the procedures can be carried out using existing instrument information. If it is concluded that a near-term upgrade of core i monitoring capability is called for to ease the burden on operators, determine the need to incorporate on-line stability monitoring or monitors for stability sensitive parameters and inform the NLC of the schedule and technical evaluation for such upgrades found to be necessary. (These procedural operation controls will no longer be necessary for licensees which implement fully automatic long-term sclutions, such as Options III or IIIa of Reference 2. Licensees should propose for plant-specific review the administrative controls to be retained in conjunction with other long-term solutions.)"
i Monticello Response to Reauested Action 1.a Monticello implemented the Interim Corrective Actions (ICAs) specified in NRC Bulletin 88-07, Supplement 1. In addition Monticello was actively involved i
l L
i
i 1
Attachment 2 September 9, 1994 Page 2 with the BWR Owners' Group effort to develop revised ICAs. As a result, Monticello was aware of the ICA revisions and implemented them in May of this year. The original ICA revisions required initiation of a manual reactor scram if operating without. recirculation pumps above the 70% rod line. At the request of the NRC, .the ICAs were further revised to require initiating a j manual reactor scram under all circumstances in which there'are no !
recirculation pumps operating while the reactor is in the RUN mode. The final l ICA revision incorporating this change, (hereafter referred to as-the Revised-ICAs) was issued by letter from L A. England to M J Virgilio dated June 6, l 1994, with subject "BWR Owners' Group Guidelines for Stability Interim Corrective Action". Monticello has fully implemented the Revised-ICAs with the exception of the recommendation to insert a manual scram at natural circulation if in the RUN mode. Operating procedures will be revised and operator training provided. prior to the end of.1994 to accommodate this change.
Monticello Response to Reauested Action 1.b Implementation of the Revised-ICAs assures a conservative operating philosophy ,
for avoidance of thermal-hydraulic instability. Since we have implemented the-Revised-ICAs, we have determined that our procedures provide the-appropriate guidance to reduce the likelihood of an instability. and provide for detection in the very unlikely event that some stability threshold is exceeded. These procedures can be carried out using existing plant instrumentation. A near-term up-grade to incorporate on-line stability monitoring'is not necessary.
Reauested Action 2 "All licensees of BWRs, except for Big Rock Point, are requested 1 to develop and submit to the NRC a plan for long-term stability corrective actions, including design specifications for any l hardware modifications or additions to facilitate manual or automatic protective response needed to ensure that the plant is in compliance with General Design Criteria 10 and 12. An acceptable plan could provide for implementing one of the long-term stability solution options proposed by the'BWROG and approved by the NRC in Reference 3 or in subsequent documentation. The plan should include a description of.the action proposed and a schedule of any submittal requiring plant-specific design review and approval by the NRC and an installation schedule (if applicable). The plan should a, so address the need for near-term and long-term technical specifiaation modifications. Generic l BWROG documents or planned submittal may be referenced in the plan."
Monticello Response to Reauested Action 2 Monticello is pursuing long-term stability solution Option I-D identified in NEDO-31960 and NEDO-31960 Supplement 1, "BWR Owners' Group Long-Term Stability
I
, .o.
l l
s 1 Attachment 2 1 September 9, 1994 l Page 3 Solutions Licensing Methodology". Changes to the Monticello Technical Specifications will be required for implementation of Option I-D. The proposed License Amendment Request would consist of the changes necessary to establish the required operational restrictions associated with the exclusion regions and would modify the bases of the Technical Specification to describe stability solution Option I-D. As part of our implementation of long-term stability solution Option I-D, Monticello is evaluating the implementation of a stability monitoring system.
Monticello will submit a licensing topical report demonstrating applicability of solution Option I-D within three months following NRC issuance of the Safety Evaluation Report for the Option I-D lead plant. A schedule for implementation of our long-term stability solution will be submitted with our licensing topical report.