Responds to NRC Re Violations Noted in IE Insp Rept 50-508/82-16.Util & Ebasco Have Not Agreed Upon Response to Problem Re Pressure Testing of Electrical Penetrations.Response to Be Provided by 830601
ML20072V284
Person / Time
Site: Satsop
Issue date: 03/29/1983
From: Leddick R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20072V265 List:
References
GO3-83-254, NUDOCS 8304110548
Download: ML20072V284 (2)


Text

,

ru.

Tiy'n E

Washington Public Power Supply System 17 /9"7N r" /? u Box 1223 Elma, Washington 98541 (206)482-4428

. Docket No. 50-508

.u;;

March 29,1983 G03-83-254 U. S. Nuclear Regulatory Commission, Region V Office of Inspection and Enforcement 1450 Maria Lane, Suite 260 Walnut Creek, California 94596-5368 Attention:

Mr. D. M. Sternberg, Chief Reactor Projects Branch No. 1

Subject:

NRC INSPECTION AT WNP-3 ITEM 0F NONCOMPLIANCE 50-508/82-16/02 PRr.SSURE TESTING 0F ELECTRICAL PENETRATIONS

References:

1) NRC Letter, Docket No. 50-508, Mr. D. M. Sternberg to Mr. R. S. Leddick, dated December 27, 1982.

2)

Letter, G03-82-1199, Docket No. 50-508, Mr. R. S.

Leddick to Mr. D. M. Sternberg, NRC Inspection at WNP-3, IE Report No. 50-508/82-16, dated November 24, 1982.

3)

Letter, G03-83-134, Docket No. 50-508, Mr. R. S.

Leddick to Mr. D. M. Sternberg, NRC Inspection at WNP-3, IE Report No. 50-508/82-16, dated February 11, 1983.

Reference 1) requested additional information concerning the Supply System's response (contained in Reference 2) to the subject noncom-pliance. Reference 3) noted that the Supply System and Ebasco had not agreed upon a response; however, it was anticipated that a resolution would be reached and a response provided by April 1, 1983.

To date the problem has not been resolved. Supply System Engineering i

has reviewed Ebasco's response to Reference 1) and considers it un-satisfactory in all three areas of NRC concern. Specifically, these areas are:

1) Full Penetration versus Double Butt Welding
2) Testing Subsequent to Rendering Weld Inaccessible
3) Vacuum Box Testing 8304110548 830406

~

fDR ADOCK 05000500 o

PDR

Mr. D. M. Sternberg March 29,1983 Page 2 G03-83-254 1

The Supply System Engineering position regarding the areas discussed above has been formally transmitted to Ebasco. Additionally, Ebasco has been requested to reassess their position to assure that the penetration welds are treated in accordance with the rules for unaccessible welds set forth in NE-5211.2.

It is anticipated that the problem can be resolved by June 1, 1983.

A Supply System response to your concerns will be provided by this date. Should you have any questions or desire further information, please contact me directly.

_QAO..

i

. R. S. Leddick (760)

Program Director, WNP-3 DRC:nj cc:

J. Adams - NESCO

-D. Smithpeter - BPA Ebasco - New York WNP-3 Files - Richland i

.