Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20073E999 + (08:53:36, 15 December 2024)
- ML20073E974 + (08:53:37, 15 December 2024)
- ML20073E968 + (08:53:38, 15 December 2024)
- ML20073E962 + (08:53:38, 15 December 2024)
- PY-CEI-NRR-1863, Forwards Perry Nuclear Power Plant Course of Action (PCA) Progress Rept, Detailing Actions Completed Per PCA Objectives,Reflecting Progress Through Completion of Fourth Refueling Outage + (08:53:39, 15 December 2024)
- TXX-9421, Provides Info Re Actions Taken for 940422 Event,As Requested in Insp Repts 50-445/94-10 & 50-446/94-10 on 940330-0430.All License Operations Personnel Trained on Guidance Detailed in 940422 Instructional Memo Re Invoking 10CFR50.54(x) + (08:53:40, 15 December 2024)
- 05000315/LER-1983-023-03, /03L-0:on 830310,diesel Generators A-B Inverter Failed Twice Rendering Generator Inoperable.Caused by Blown Fuses Due to High Ambient Room Temp.Room Inlet Ventilation Dampers Opened & Room Temp Lowered + (08:53:41, 15 December 2024)
- 05000315/LER-1983-023, Forwards LER 83-023/03L-0 + (08:53:43, 15 December 2024)
- ML20073E942 + (08:53:43, 15 December 2024)
- ML20073E936 + (08:53:44, 15 December 2024)
- ML20073E935 + (08:53:45, 15 December 2024)
- ML20073E931 + (08:53:46, 15 December 2024)
- ML20073E926 + (08:53:46, 15 December 2024)
- ML20073E922 + (08:53:47, 15 December 2024)
- ML20073E917 + (08:53:48, 15 December 2024)
- 3F0491-05, Describes Change to Estimated Emergency Feedwater Quantity & Time Necessary to Complete Natural Circulation Cooldown at Facility.Cooldown Expected to Use 735,000 Gallons of Water & Will Take 150 H Using Conservative Licensing Assumptions + (08:53:49, 15 December 2024)
- ML20073E912 + (08:53:49, 15 December 2024)
- ML20073E907 + (08:53:50, 15 December 2024)
- ML20073E901 + (08:53:54, 15 December 2024)
- 05000445/LER-1991-013, :on 910328,loss of Offsite Power Occurred. Caused by Grounded Transmission Line Due to Accumulation of Bird Droppings on Insulators.Increased Attention Given to Need for Cleaning + (08:53:55, 15 December 2024)
- PY-CEI-NRR-1352, Forwards Rev 15 to Security Plan.Rev Withheld (Ref 10CFR73.21) + (08:53:56, 15 December 2024)
- 05000259/LER-1994-003-03, :on 940713,defect Discovered in Pressure Rating for Air Conditioning Units (Acu) Supplied by Ellis & Watts. on 940823,determination Made That Event Reportable Per 10CFR21.All Acus Will Be Reworked + (08:53:58, 15 December 2024)
- ML20073E887 + (08:53:59, 15 December 2024)
- ML20073E880 + (08:54:02, 15 December 2024)
- 05000259/LER-1994-002-03, :on 940428,GE Akr Circuit Breakers Failed Trip Time Tests Due to Different Testing Equipment Used by TVA & GE for Breaker Testing.Akr Breakers Returned to GE for Addl Rework & Retest + (08:54:04, 15 December 2024)
- ML20073E851 + (08:54:10, 15 December 2024)
- 05000254/LER-1994-010-05, :on 940808,when Attempting to start-B-train CR Air Conditioning,Compressor Repeatedly Tripped on High Pressure Due to Plugged Svc Water Strainers.Flow Indicator Repaired & Procedure Qcop 5750-9 Changed + (08:54:12, 15 December 2024)
- ML20073E832 + (08:54:13, 15 December 2024)
- ML20073E835 + (08:54:13, 15 December 2024)
- ML20073E828 + (08:54:14, 15 December 2024)
- ML20073E815 + (08:54:15, 15 December 2024)
- ML20073E810 + (08:54:16, 15 December 2024)
- ML20073E809 + (08:54:16, 15 December 2024)
- ML20073E799 + (08:54:17, 15 December 2024)
- ML20073E797 + (08:54:17, 15 December 2024)
- ML20073E795 + (08:54:19, 15 December 2024)
- ML20073E794 + (08:54:19, 15 December 2024)
- HL-4696, Forwards Response to NRC 940915 RAI on Ehnp Unit 1 Core Shroud Stabilizer Design Submitted for NRC Review of 940902. Results of Final Stress Analysis & Summary of Dynamic Testing Previously Performed for GE by Hitachi Also Encl + (08:54:20, 15 December 2024)
- ML20073E770 + (08:54:21, 15 December 2024)
- ML20073E787 + (08:54:21, 15 December 2024)
- ML20073E758 + (08:54:22, 15 December 2024)
- ML20073E752 + (08:54:23, 15 December 2024)
- ML20073E754 + (08:54:23, 15 December 2024)
- ML20073E744 + (08:54:24, 15 December 2024)
- ML20073E747 + (08:54:24, 15 December 2024)
- ML20073E743 + (08:54:26, 15 December 2024)
- 05000368/LER-1994-003-03, :on 940824,discovered That Surveillance Testing of CEA Position Indication Not Performed as Required by TS Due to Personnel Error Associated W/Computer Software Change.Pms Software Revised + (08:54:27, 15 December 2024)
- ML20073E733 + (08:54:28, 15 December 2024)
- ML20073E732 + (08:54:29, 15 December 2024)
- ML20073E730 + (08:54:29, 15 December 2024)
- ML20073E722 + (08:54:30, 15 December 2024)