Bulletin Reply 83-01 ECEwee f'T Southem Califomia Edison Company gE
[1,
))
P.O. BOX 800 2 2 44 W ALN UT GROVE AVENUE ROSEMEAD. C ALIFORNI A 91770 Ikbb,' y K. P. B ASKIN TELEPHONE
,'."L'.".'~'o' ""c C1'~~; E a i~.
March 30, 1983 m u mm U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596-5368 Attention:
Mr. R. H. Engelken, Regional Administrator
Dear Sir:
Subject:
Docket Nos. 50-361 and 50-362 Response to IE Bulletin No. 83-01 San Onofre Nuclear Generating Station, Units 2 & 3
Reference:
- 1) Letter, R. Dietch (SCE) to R. H. Engelken (NRC), Response to IE Bulletin No. 83-01, dated March 8, 1983 l
- 2) Letter, H. B. Ray (SCE) to R. H. Engelken l
(NRC), Reply to Confirmatory Action Letter, i
dated March 22, 1983 This letter provides a correction of information presented in Reference 1, which was submitted in response to IE Bulletin No. 83-01.
In Reference 1, we indicated that preventive maintenance is performed in accordance with Item 3 of IE Bulletin No. 79-09, l
Failures of GE Type AK-2 Circuit Breakers in Safety-Related j
Systems, to assure breaker design performance. However, as discussed with you in a meeting on March 18 in your office, a detailed review of the preventive maintenance program for the reactor trip switchgear has iound a number of deficiencies in
^
that program with regard to conformance with Item 3 of IE Bulletin No. 79-09.
i i
8304150393 830330 PDR ADOCK 05000361 O
\\
BS-FM
Mr. R. H. Engelken March 30, 1983 These deficiencies will be corrected by the preparation of a new procedure which incorporates the provisions of IE Bulletin 79-09, the vendor manual, and other inputs from the vendor.
Maintenance in accordance with this new procedure will be performed on all Units 2 and 3 reactor trip circuit breakers prior to their respective Mode 2 entry.
i Additional information concerning our preventive maintenance program will be submitted separately. As discussed in Reference 2, neither Unit will enter Mode 2 until advised by your office that the matter involving the reactor trip breakers is resolved.
Subscribed on this JdM day of },1f,M 1983.
Respectfully submitted, 4
I SOUTHERN CALIFORNIA EDISON COMPANY By:
K. P. Baskin Manager of Nuclear Engineering, Safety, and Licensing Subscribed and sworn to before me this JdM day of 27 m L /9/3
._.........f__1--_
OFFlclAL SEAL
- I AGNES CRABTREE gp 2.
4 NOTARY PUBLlC - CALIFORNIA p
'8 PRINCIPAL OFF6CE 1N ufj LOS AMGELES COUNTY Notar.(Public in and for the County of Los A)ngeles, State of California T Y -N D b $-~4 My Commission Expires:
,,77 /pgic f