Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20073F269 + (08:53:12, 15 December 2024)
- ML20073F256 + (08:53:13, 15 December 2024)
- ML20073F267 + (08:53:13, 15 December 2024)
- ML20073F254 + (08:53:14, 15 December 2024)
- ML20073F235 + (08:53:14, 15 December 2024)
- ML20073F219 + (08:53:15, 15 December 2024)
- ML20073F208 + (08:53:16, 15 December 2024)
- ML20073F186 + (08:53:18, 15 December 2024)
- GO2-83-314, Interim Deficiency Rept Re balance-of-plant Board G-2 Design Error.Initially Reported on 830315.Drawing Part Lists Will Be Updated to Provide Correct Part Numbers.Next Rept Will Be Submitted by 830706 + (08:53:19, 15 December 2024)
- ELV-02749, 1990 Annual Rept-Part 2 + (08:53:20, 15 December 2024)
- ML20073F173 + (08:53:21, 15 December 2024)
- ML20073F171 + (08:53:21, 15 December 2024)
- GO2-83-313, Final Deficiency Rept Re Incorrect Wiring of Reactor Vessel Water Level Indicating Switches MS-LIS-37A & MS-LIS-37C. Initially Reported on 830315.Switches Rewired to Conform to GE Design Requirements + (08:53:22, 15 December 2024)
- ML20073F153 + (08:53:22, 15 December 2024)
- ML20073F126 + (08:53:23, 15 December 2024)
- ML20073F113 + (08:53:24, 15 December 2024)
- ML20073F125 + (08:53:24, 15 December 2024)
- LG-83-314, Responds to NRC Requiring Detailed Analysis of TMI Action Item II.K.3.5, Automatic Trip of Reactor Coolant Pumps. Analysis Will Not Be Submitted,Due to Indefinite Delay in Const of Facility + (08:53:25, 15 December 2024)
- ML20073F103 + (08:53:25, 15 December 2024)
- 05000373/LER-1983-023-03, /03L-0:on 830310,calibr Indicating Switches 1B21-N100A & B Found Out of Tolerance in Nonconservative Direction.Caused by Instrument Drift.Adjustment of Setpoint Considered + (08:53:27, 15 December 2024)
- 05000373/LER-1983-023, Forwards LER 83-023/03L-0 + (08:53:28, 15 December 2024)
- ML20073F070 + (08:53:29, 15 December 2024)
- 05000318/LER-1991-002, :on 910327,ESF Actuation Occurred While Operator Was Restoring ESF Actuation Sys AL Actuation Logic Cabinet.Caused by Personnel Error.Operators Counseled & Other Personnel Informed of Event + (08:53:31, 15 December 2024)
- ML20073F063 + (08:53:32, 15 December 2024)
- ML20073F050 + (08:53:32, 15 December 2024)
- ML20073F043 + (08:53:33, 15 December 2024)
- ML20073F030 + (08:53:34, 15 December 2024)
- ML20073F010 + (08:53:34, 15 December 2024)
- ML20073F008 + (08:53:35, 15 December 2024)
- ML20073E981 + (08:53:36, 15 December 2024)
- ML20073E999 + (08:53:36, 15 December 2024)
- ML20073E974 + (08:53:37, 15 December 2024)
- ML20073E968 + (08:53:38, 15 December 2024)
- ML20073E962 + (08:53:38, 15 December 2024)
- PY-CEI-NRR-1863, Forwards Perry Nuclear Power Plant Course of Action (PCA) Progress Rept, Detailing Actions Completed Per PCA Objectives,Reflecting Progress Through Completion of Fourth Refueling Outage + (08:53:39, 15 December 2024)
- TXX-9421, Provides Info Re Actions Taken for 940422 Event,As Requested in Insp Repts 50-445/94-10 & 50-446/94-10 on 940330-0430.All License Operations Personnel Trained on Guidance Detailed in 940422 Instructional Memo Re Invoking 10CFR50.54(x) + (08:53:40, 15 December 2024)
- 05000315/LER-1983-023-03, /03L-0:on 830310,diesel Generators A-B Inverter Failed Twice Rendering Generator Inoperable.Caused by Blown Fuses Due to High Ambient Room Temp.Room Inlet Ventilation Dampers Opened & Room Temp Lowered + (08:53:41, 15 December 2024)
- 05000315/LER-1983-023, Forwards LER 83-023/03L-0 + (08:53:43, 15 December 2024)
- ML20073E942 + (08:53:43, 15 December 2024)
- ML20073E936 + (08:53:44, 15 December 2024)
- ML20073E935 + (08:53:45, 15 December 2024)
- ML20073E931 + (08:53:46, 15 December 2024)
- ML20073E926 + (08:53:46, 15 December 2024)
- ML20073E922 + (08:53:47, 15 December 2024)
- ML20073E917 + (08:53:48, 15 December 2024)
- 3F0491-05, Describes Change to Estimated Emergency Feedwater Quantity & Time Necessary to Complete Natural Circulation Cooldown at Facility.Cooldown Expected to Use 735,000 Gallons of Water & Will Take 150 H Using Conservative Licensing Assumptions + (08:53:49, 15 December 2024)
- ML20073E912 + (08:53:49, 15 December 2024)
- ML20073E907 + (08:53:50, 15 December 2024)
- ML20073E901 + (08:53:54, 15 December 2024)
- 05000445/LER-1991-013, :on 910328,loss of Offsite Power Occurred. Caused by Grounded Transmission Line Due to Accumulation of Bird Droppings on Insulators.Increased Attention Given to Need for Cleaning + (08:53:55, 15 December 2024)
- PY-CEI-NRR-1352, Forwards Rev 15 to Security Plan.Rev Withheld (Ref 10CFR73.21) + (08:53:56, 15 December 2024)
- 05000259/LER-1994-003-03, :on 940713,defect Discovered in Pressure Rating for Air Conditioning Units (Acu) Supplied by Ellis & Watts. on 940823,determination Made That Event Reportable Per 10CFR21.All Acus Will Be Reworked + (08:53:58, 15 December 2024)