Interim Deficiency Rept DER 83-12 Re Possible Malfunction in GE 480-volt Motor Control Ctr Size 2 Starter Add on Interlocks.Initially Reported on 830309.Design Change Package Issued.Next Rept Will Be Submitted by 830503
ML20073F208
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/04/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-23415-BSK, DER-83-12, NUDOCS 8304150446
Download: ML20073F208 (5)


Text

r ,

I e

Dockst Nos. c. 50-528/529/530 50.55(eNehN Arizona Public Service Company /W g.g ,

P O. 00X 21666 . PHOENIX ARIZONA 85006 ,7 b.' U,' t,'

April 4, 1983 ANPP-23415-BSK/RQT U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. D. M. Sternberg, Chief Reactor Projects Branch 1

Subject:

Interim Report - DER 83-12 A 50.55(e) Potentially Reportable Deficiency Relating to GE 480V MCC Size 2 Starter Add-On Interlocks May Malfunction File: 83-019-026; D.4.33.2

Reference:

Telephone Conversation between P. Narbut and G. Duckworth on March 9, 1983

Dear Sir:

The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation. At that time,-it was estimated that a determination of reportability would be made within thirty (30) days.

Due to the extensive investigation and evaluation required, an Interim Rep' ort is attached. It is now expected that this information will be finalized by May 3, 1983, at which time a complete report will be submitted.

Very truly ours, 11 OLR E. E. Van Brunt, Jr.

APS Vice President, Nuclear Projects ANPP Project Director EEVB/RQT:db Attachment cc: See Attached Page Two .

/

B304150446 830404 PDR ADOCK 05000528 S PDR

f f

U. S. Nuclear Regulatory Commission ANPP-23415-RQT/BSK Page Two cc: Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nucicar Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

G. C. Andognini J. R. Bynum J. A. Roedel D. B. Fasnacht A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees P. P. Klute/D. D. Green A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. II. Grant D. R. llawkinson L. E. Vorderbrueggen G. A. Florelli Institute of Nuclear Power Operations Records Center 1100 Circle 75 Parkway Suite 1500 Atlanta, Georgia 30339 1

i l

w INTERIM REPORT'- DER 83-12 POTENTIAL 4(EPORTABLE DEFICIENCY ARIZONA PUBLIC SERVICE C0!!?ANY (APS)

PVNGS UNITS 1 & 3

1. POTENTIAL PROBLEll General Electric (GE) has advised Bechtel Power Corporation that an inherent operational deficiency may exist in normally open electric interlocks (GE Part No. CR206D022ZACN) used with Class 1E, Size 2 Ftarters (see attached GE letter d?ted 2/9/83). These starters are located in Class 1E 400 Volt !!otor Control Centers (MCC's) supplied by GE. The identified 11CC's (1-E-PIIA-!Dl,1-E-PilB-M32 and 3-E-PilB-t-04) are used in conjunction with the following safety related equipment:
1) Diesel Generator Control Room Essential AIIU Fans M-llDA-A01;
2) Essential Chilled Water Circulation Pumps M-ECA-P01 and

!!-EC B-P01;

3) Fuel and Auxiliary Building Essential Exhaust AFU Heater M-IIFB-E01.

II. APPROACil TO AND STATUS OF PROPOSED RESOLUTION This condition was conveyed to Bechtel after the GE equipment had been received and all of the qualification documentation completed.

Design Change Package 1SE-Pii-034 and 3CE-PH-034 will be issued to implement GE's corrective action plan.

III. PROJECTED COMPLETION OF CORRECTIVE ACTION AND SUBI!ITTAL OF Tile FINAL REPORT Evaluation of this condition and submittal of the Final Report is forecast to be completed by May 3, 1983.

' I ATTACHMENT TO DER 83-12

~

GENERAL ELECTRIC b I NSTALLATION AND SERVICE ENGINEERING DIVISION GENER AL ELECTRIC COMPANY P. O BOX 10419, 5320 NORTH 16TH STREET

-

  • PHOENIX, ARIZONA 85o64, Phone (602) 241-7237 INDUSTRIAL SERVICES February 9, 1983

/rmt mensa ,

rut An4/_[__ _

FEB 11'83 A

Bechtel Power Corporation s 9e 12400 East Imperial Highway Norwalk, California 90650 /j n 3,c, m auw

.n maus e an Attention: W.G. Bingham Project Engineering Manager

.-__ g

- -amm t ont

Subject:

Palo Verde Nuclear Generating Station -- ~$.r m*

Bechtel Job 10407 ,8 480V Motor Control Centers; EM018 vs Auxiliary interlocks g_ "*?as , _

__ _ = >

Dear Mr. Bingham:

-lj!"

msw Please find attached a list of 480V MCC equipment located at the Pahy"j Verde site having Size 2 Starters containing normally open add-on ~

interlocks that potentially may malfunction.

Replacement interlocks are presently being certified at our Mebane Manufacturing Facility. Howevcr, before we send these replacements to the site, we will need the necessary Bechtel identification (i.e.,

DCP #, NCR #, etc.), so that they can be received at the Bechtel Warehouse.

Please provide me with this information so that we may proceed with shipment.

In addition, General Electric Engineering Services will provide technical direction to direct Bechtel craf t labor in the interlock changeout and therefore, I would appreciate knowing who to contact to schedule the work.

Your assistance in providing me with the necessary information is greatly appreciated.

Thank you.

Paul S. Rinne Field Engineering Supervisor Apparatus & Engineering Services cc: Mike Torikan, Bechtel-Downy Rich Roessler, GE-Mebane John Corbitt, GE-Bloomington .-

Les Fickel, GE-Los Angeles Norm David, GE-Phoenix Attachments PSR:rmh

^

W=f IE SIZE 2 STARTERS WITH N.0. ADD-ON BLOCK

! Address: P.O. Box 49 Customer: Bechtel/Palo Verde Customer P.O.: 13-10407-E018-234 Palo Verde, AZ 85343

~

\

RequisItibn No.: '480-55032 Attention: Field Procurerrient, G.E. ML No.: 443X015--- Jim Crotwell G.E. Cust. Cust.

MCC No. ML ltem No. Unit Loc. G.E. Par t No. Qty. Unit Ref. Device No.

M02 DR2 CR2060022ZACN I M3116 42 E-PHA-M31 ERI CR2060022ZACN 1 M3118 42 ER2 CR20600222ACH I M3113 42 AR3 CR206D022ZACN 1 M3216 42

-E-PHB-M32 M03 CR2 CR20600222ACN 1 M3215 42 SFl CR206D0222ACN 1 M3204 42 N05 BR1 CR206D022ZACN 1 M3423 42 3- E-P/f B-M3 L 1

1

.-