ML20073F008
| ML20073F008 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 04/06/1983 |
| From: | Will Smith INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| NUDOCS 8304150406 | |
| Download: ML20073F008 (1) | |
Text
Qh~7 k'
^
INDIANA & MICHIGAN ELEC[RIC COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 (616) 465-5901 April 6, 1983 Mr. J.G. Ibppler, Regional Administrator United States Nuclear Regulatory Cornission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-58 Docket No. 50-315
Dear Mr. Keppler:
This is to confim a verbal report given to Mr. E.R. Swanson of your staff at 1225 hours0.0142 days <br />0.34 hours <br />0.00203 weeks <br />4.661125e-4 months <br /> on this date. At that time, Mr. Swanson was advised that the Unit 1 Halon Systs had been declared inoperable on April 5, 1983, following empletion of a nonroutine concentration test.
It was also noted that the Unit 2 Halon Systm is being administratively considered inoperable until the test can be performed in that unit.
A followup report will be submitted within fourteen days in accordance with Unit 1 Technical Specification Section 6.9.1.12.
Sin & rely, Ld/'. : 1 ed4rr -
4s W.G. Smith,' Jr3 Plant Manager
/bab cc: John E. Dolan R.S. Ibnter M.P. Alexich R.F. Kroeger B. Germano bb g O"-
E.R. Swanson/N.E. DuBry RO:III go R.C. Callen, MPSC 8g
- a. czarnoff, Esq.
bn J.M. Hennigan C
R.O. Bruggee, EPRI b2 INPO 88 PnSRC
$Q J.P. Stietzel E.L. Townley 85 Dir., IE (40 copies)
APR11 1983 M
Dir., MIPC (4' copies)