ML20073F008

From kanterella
Jump to navigation Jump to search
Ro:On 830405,halon Sys Declared Inoperable Following Completion of Nonroutine Concentration Test.Followup Rept Will Be Submitted within 14 Days
ML20073F008
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 04/06/1983
From: Will Smith
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8304150406
Download: ML20073F008 (1)


Text

^

k' Qh~7INDIANA & MICHIGAN ELEC[RIC COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 (616) 465-5901 April 6, 1983  ;

Mr. J.G. Ibppler, Regional Administrator United States Nuclear Regulatory Cornission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-58 Docket No. 50-315

Dear Mr. Keppler:

This is to confim a verbal report given to Mr. E.R. Swanson of your staff at 1225 hours0.0142 days <br />0.34 hours <br />0.00203 weeks <br />4.661125e-4 months <br /> on this date. At that time, Mr. Swanson was advised that the Unit 1 Halon Systs had been declared inoperable on April 5, 1983, following empletion of a nonroutine concentration test. It was also noted that the Unit 2 Halon Systm is being administratively considered inoperable until the test can be performed in that unit.

A followup report will be submitted within fourteen days in accordance with Unit 1 Technical Specification Section 6.9.1.12.

Sin & rely, Ld/'. : 14sed4rr -

W.G. Smith,' Jr3 Plant Manager I

/bab cc: John E. Dolan R.S. Ibnter M.P. Alexich R.F. Kroeger B. Germano g bb O"- E.R. Swanson/N.E. DuBry RO:III go R.C. Callen, MPSC 8g a. czarnoff, Esq.

bn J.M. Hennigan C R.O. Bruggee, EPRI b2 INPO 88 PnSRC l

$Q J.P. Stietzel

  • E.L. Townley 85 Dir., IE (40 copies)

M Dir., MIPC (4' copies) APR11 1983