Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000366/LER-1991-010, :on 910416,current Surge Blew Fuse 2C61-F20 During Performance of Sp 57SV-D11-008-2S.Caused by Personnel Error & Poor Working Conditions.Event Will Be Discussed W/ I&C Personnel Re Preparation of Work Areas + (08:25:35, 15 December 2024)
- ML20073P911 + (08:25:36, 15 December 2024)
- ML20073P909 + (08:25:37, 15 December 2024)
- ST-HL-AE-3767, Responds to NRC Re Violations Noted in Insp Rept 50-498/91-08.Corrective Actions:Electrician Involved W/Event Counseled & Operational Improvement Program Addressed Initiatives to Improve Personnel Performance + (08:25:38, 15 December 2024)
- ML20073P906 + (08:25:42, 15 December 2024)
- ML20073P891 + (08:25:43, 15 December 2024)
- ML20073P889 + (08:25:44, 15 December 2024)
- ML20073P885 + (08:25:45, 15 December 2024)
- ML20073P879 + (08:25:46, 15 December 2024)
- ML20073P876 + (08:25:46, 15 December 2024)
- ML20073P873 + (08:25:47, 15 December 2024)
- 05000285/LER-1991-003, Informs of Extension of Completion Date for Changing Abnormal Operating Procedures & Emergency Operating Procedures to Resolve Containment Penetration M-3 Potential Leak Path Issue,Per 910306 LER 91-003 + (08:25:48, 15 December 2024)
- ML20073P867 + (08:25:48, 15 December 2024)
- NRC-83-0021, Forwards Response to Generic Ltr 83-10C Re Resolution of TMI Action Item II.K.3.5, Automatic Trip of Reactor Coolant Pumps. Best Estimate Analyses Will Be Performed Using W Flash Computer Code W/Better Estimate Assumptions + (08:25:49, 15 December 2024)
- ML20073P862 + (08:25:49, 15 December 2024)
- ML20073P843 + (08:25:50, 15 December 2024)
- ML20073P836 + (08:25:51, 15 December 2024)
- ML20073P834 + (08:25:51, 15 December 2024)
- ML20073P831 + (08:25:52, 15 December 2024)
- 05000387/LER-1983-019-03, /03L-0:on 830119,drywell Vacuum Breaker Considered Inoperable Based on Indication of Being Partially Open. Caused by Limit Switch Failure.Corrective Actions Under Investigation + (08:25:54, 15 December 2024)
- ML20073P826 + (08:25:55, 15 December 2024)
- 05000387/LER-1983-019, Forwards LER 83-019/03L-0 + (08:25:57, 15 December 2024)
- ML20073P823 + (08:25:57, 15 December 2024)
- ML20073P814 + (08:25:58, 15 December 2024)
- ML20073P804 + (08:25:58, 15 December 2024)
- RBG-35-012, Monthly Operating Rept for Apr 1991 for River Bend Station Unit 1 + (08:25:59, 15 December 2024)
- ML20073P794 + (08:26:00, 15 December 2024)
- ML20073P797 + (08:26:00, 15 December 2024)
- 05000368/LER-1991-011, :on 910415,subcritical Reactor Trip Occurred During Testing of Reactor Protective Sys.Caused by Procedural Deficiency.Administrative Process for Procedure Preparation Reviewed + (08:26:02, 15 December 2024)
- ML20073P789 + (08:26:03, 15 December 2024)
- ML20073P791 + (08:26:03, 15 December 2024)
- ML20073P779 + (08:26:04, 15 December 2024)
- ML20073P777 + (08:26:05, 15 December 2024)
- ML20073P773 + (08:26:05, 15 December 2024)
- ML20073P766 + (08:26:06, 15 December 2024)
- W3P90-1183, Informs That Util Completed Analysis on Extended Test Intervals & Effect on Instrument Drift + (08:26:06, 15 December 2024)
- ML20073P756 + (08:26:07, 15 December 2024)
- 05000364/LER-1991-004, :on 910420,reactor Tripped Due to Turbine Trip. Caused by Reduction of Condenser Vacuum.Turbine Bldg Sys Operator Immediately Restored Air to Steam Admission Valve Upon Finding Air Supply Valve Closed + (08:26:08, 15 December 2024)
- ST-HL-AE-3764, Responds to Violations Noted in Insp Repts 50-498/91-09 & 50-499/91-09.Corrective Actions:Radiation Protection Personnel Verified That No Exposures Resulted,Area Resurveyed & High Radiation Area Postings Removed + (08:26:09, 15 December 2024)
- ML20073P730 + (08:26:10, 15 December 2024)
- 05000348/LER-1991-003, :on 910430,steam Generator Tube Degradation Occurred.Caused by Leaks & Circumferential Cracks.Program of Boric Acid Addition Continued to Reduce Potential for SCC & Pressure Pulse Cleaning Process Being Used + (08:26:11, 15 December 2024)
- ML20073P701 + (08:26:12, 15 December 2024)
- ML20073P690 + (08:26:13, 15 December 2024)
- BECO-91-067, Comment Opposing Proposed Rules 10CFR71,170 & 171, Rev of Fee Schedules;100% Fee Recovery + (08:26:14, 15 December 2024)
- ML20073P681 + (08:26:14, 15 December 2024)
- ML20073P679 + (08:26:15, 15 December 2024)
- ML20073P677 + (08:26:15, 15 December 2024)
- ML20073P668 + (08:26:16, 15 December 2024)
- 05000366/LER-1991-011, :on 910420,ESF Actuation Occurred While Undergoing Refueling Outage.Caused by Component Failure.Fuse Replaced & Mcrec Sys Returned to Normal Mode of Operation + (08:26:18, 15 December 2024)
- 05000341/LER-1991-007, :on 910414,error During Performance of Radiation Monitor Calibration Results in Actuation of Esf. Caused by Personnel Error.Personnel Counseled Re Event & Subject Procedure Revised + (08:26:20, 15 December 2024)
- ML20073P653 + (08:26:22, 15 December 2024)