Advises of Plans Re Cycle 3 Reload.Description of Core Reload,Including Util Safety Evaluation of Core Redesign Due to Fuel Assembly Reconstitution & Replacement of Fuel Assemblies D22T,D19T & D20T Encl
ML20073P889
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 05/15/1991
From: Checca A
COMMONWEALTH EDISON CO.
To: Murley T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
NUDOCS 9105230265
Download: ML20073P889 (9)


Text

f'

'N Commonw:alth Edison 3

1400 Opus Place

.,,._ (i _ g/

  • T Downers Grove. Ilhnois (40515

%/

May 15, 1991 Dr. Thomas E. Murley, Director Office of Nuclear Reattor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Attn: Document Control Desk

SUBJECT:

Braidwood Station Unit 1 Cycle 3 Reload NRC Docket No. 50-456

REFERENCES:

1.

Westinghouse HCAP-9272-P-A, dated October 1985; " Westinghouse Reload Safety Evaluation Methodology", (originally issued March 1978).

2.

CECO submittal, J.A. Silady to T.E. Murley dated July 13, 1990; titled " Commonwealth Edison Company Topical Report on Benchmark of PHR Nuclear Design Methods Using The Phoenix-P and ANC Computer Codes, NRC Docket Nos.

50-295/304, 50-454/455, and 50-456/457".

l 3.

NRC SER on CECO's Neutronics Topical (Ref. 2) dated March 11, 1991.

4.

CECO submittal, F.G. Lentine to H.R. Denton dated July 27, 1983; titled " Zion Stations Units 1 and 2, Byron Station Units I and 2 Braidwood Station Units 1 and 2, Commonwealth Edison Company Topical, Report on Benchmark of PHR Nuclear Design Methods, NRC Docket Nos.

50-295/304, 50-454/455, and l

50-456/457".

l l

5.

NRC SER on CECO's Neutronics Topical (Ref 4) dated December 13, 1983.

910523026seqh'h'[j,

{DR AI,0CR 07,3 FDR AOO4]

[ Yl ZNLD/948/3 V

6.

Hestinghouse Letter 91CB*-G-0036, March 19, 1991 J. H. Swogger to H. F. Haughton; " Grid Damage to fuel Assemblies 007S and C22S" 7.

NRC Letter from S.P. Sands to T.E. Kovach, Amendment No. 23; "Use of VANTAGE 5 fuel",

dated April 19, 1990.

Dear Dr. Murley:

Braldwood Unit I has completed its second cycle of operation and is conducting a refueling outage that began March 1, 1991.

Braidwood Unit 1, Cycle 2 attained a final cycle burnup of approximately 13,052 MHD/MTU.

Cycle 3 is expected t_o commence on May 7, 1991.

This letter is to advise you of Commonwealth Edison Company's (CECO) plans regarding the Braidwood Unit 1, Cycle 3 reload core.

Attachment I describes the core reload including Ceco's safety evaluation of the core redesign due to fuel assembly reconstitution and replacement of fuel assemblies: D29T (significant grid damage) and symmetric assemblies 022T, D19T, and D201. All aspects of the redesign have been reviewed and compared to the original Cycle 3 safety parameters.

It has been determined that the Cycle 3 safety parameters remain valid for the redesigned core configuration.

The Braidwood Unit 1, Cycle 3 reload review was performed in accordance with the provisions of 10CFR50.59 and no unreviewed safety questions exist as a result of the redesign. provides the Core Operating Limits Report for Cycle 3 pursuant to Technical Specification 6.9.1.9.

CECO and its vendor (Westinghouse) apply NRC approved reload design methodologies developed by Westinghouse as described in Reference 1.

Commonwealth Edison requested approval to perform the neutronic portion of the reload design using the methods and codes described in References 2 and 4 and the NRC approved these requests in References 3 and 5, respectively.

Specifically, the Braidwood Unit 1, Cycle 3 reload design, including the development of the core operating limits, was generated by Commonwealth Edison using the NRC approved methodologies.

Please direct any questions regarding this notification to this office.

Very truly yours, h/1 Allen R. Checca Nuclear Licensing Administrator cc:

P.M. Pulsifer - NRR Project Manager A.B. Davis - Region III Administrator S. DuPont - Senior NRC Resident Inspector - Braidwood ZNLD/948/4

4 ALTACMENL1 Braidwood_UnlLkCyrle_3 Reload Desctlption The Braidwood Unit 1, Cycle 3 reload core was designed to perform under current nominal design parameters Technical Specifications and related bases, and current Technical Specification setpoints such that:

1.

Core characteristics will be less limiting than those previously reviewed and accepted; or 4

2.

For those postulated incidents analyzed and reported in the Updated Braidwood/ Byron Final Safety Analysis Report (UFSAR) which could potentially be affected by fuel reload, reanalyses or reevaluations have demonstrated that the results of the postulated events are within allowable limits.

Commonwealth Edison Company performed a detailed review with Westinghouse on the bases, including all the postulated incidents considered in the UFSAR, of the Reload Safety Evaluation (RSE).

Based on this review, the safety evaluations will be performed by the Commonwealth Edison on-Site and Off-Site Reviews pursuant to the requirements of 10CFR50.59(a) and 10CFR50.59(b).

The Braidwood Unit 1, Cycle 3 core is a " Low Leakage" design.

Commonwealth Edison has successfully developed and used similar " Low leakage" designs at its Braidwood, Byron and Zion units.

During the Cycle 2/3 refueling, sixty-four (64) VANTAGE 5 fuel assemblies will be inserted into the core.

The Braidwood Unit I core will then contain a combination of fresh Westinghouse 17x17 VANTAGE 5 assemblies and previously irradiated 17x17 Optimized fuel Assemblies (0FA's).

The NRC approved the use of VANTAGE 5 at Braldwood Unit i for Cycle 3 and thereafter, under the provisions of 10CFR50.90 in Reference 7.

Braidwood/ Byron UFSAR justified the compatibility of Westinghouse 0FA and VANTAGE-5 assemblies in a reload core, and verified compatibility with control rods and reactor internals interfaces. A mixture of Integral Fuel Burnable Absorber (IFBA) rods and Het Annular Burnable Absorbers (WABAs) will be used as the burnable poison.

The IFBA rods contain fuel pellets with enriched B-10 coating.

Both HABAs and IFBA fuel rods have been used previously by Commonwealth Edison.

The reload VANTAGE-5 fuel assemblies will incorporate Westinghouse i

standardized fuel pellets, reconstitutable top nozzles (RTN), extended burnup design features, and snag resistant Intermediate Flow Mixers (IFM) and grids.

Similar features have been successfully utilized previously in Commonwealth Edison's Byron and Braidwood Units.

Additionally, the reload fuel assemblies will incorporate the Debris filter Bottom Nozzle (DFBN).

The DFBN, hydraulically and structurally equivalent to the nozzle used on the existing fuel assemblies, is expected to improve fuel performance by reducing the size of any debris that may potentially enter the active fuel region.

This feature is currently in operation at Commonwealth Edison's Byron and Braidwood Units.

ZNLD/948/5

l The Braidwood Unit 1 Cycle 3 core has been redesigned and evaluated 1

'using NRC licensed and approved methods.

Commonwealth Edison requested approval to perform the neutronic portion of the PHR reload design using the methods described in Reference 2, and the NRC approved this request (Reference 3).

Specifically, the Braidwood Unit 1, Cycle 3 reload design, including the development of the core operating limits, was generated and verified by Commonwealth Edison using NRC approved methodology.

The reload redesign also reflects the reconstitution of fuel l

assemblies 073U, and the discharge of damaged fuel assembly 029T.

Fuel assembly 0291, and its three symmetric assemblies, were discharged when Grid #1 of assembly 029T was discovered to have been damaged during the prior core reload.

Two adjacent assemblies. 0075 and C225, also sustained some damage to a grid strap.

The damage to D075's grid strap and C22S's grid strap were evaluated by Hestinghouse in Reference 6.

The evaluation determined that the damage was minor in nature and allowed both assemblies to be used as is in t

the reload design. As the original design efforts and Reload Safety Evaluation did not reflect these changes, a comprehensive redesign and reexamination of safety limits has been performed.

The reload fuel's nuclear design is evaluated generically in the UFSAR. As OFA and VANTAGE 5 fuel have the same pellet and fuel rod diameters, most reactivity parameters are insensitive to fuel type.

Changes in nuclear-characteristics due to the transition from 0FA to VANTAGE 5 fuel are within the range normally seen from cycle to cycle due to fuel management effects.

The loading pattern dependent parameters (for the original Braidwood Unit 1 Cycle 3 design) were evaluated in detail in the CECO /Hestinghouse reload safety evaluation process.

The redesigned core was then evaluated in detail through a second CECO /Hestinghouse reload safety evaluation process.

The second meeting was performed to ensure that the redesigned core met the same safety analysis limits and assumptions.

The thermal-hydraulic design for the Cycle 3 reload core has not l

significantly changed from that of the previously reviewed and accepted initial cycle design. Tests and analysis have confirmed that the VANTAGE 5 assemblies are hydraulically compatible with the 0FA assemblies reloaded as Regions 3, 4A, 48, and 4C.

The FNDH limits of less than 1.55 for OFA assemblies and 1.65 for VANTAGE 5 assemblies ensures that the DNB ratto of the.

limiting power rod during Condition I and Condition II events is greater than or equal to the DnBR limit of the DNBR correlation being applied.

L Hestinghouse determined through the Reload Safety Evaluation (RSE) process that the Braidwood Unit i non-LOCA and LOCA analyses described in the Braidwood/ Byron UFSAR were not adversely impacted by the original Braidwood

~ Unit 1, Cycle 3 design.

Westinghouse and CECO have subsequently reconfirmed that the impact of the redesign, and the reconstitution, on the original Reload Safety Evaluation (RSE) conclusions were negligible.

ZNLD/948/6

Westinghouse determined through the Reload Safety Evaluation (RSE) process that the Braidwood Unit I non-LOCA and LOCA analyses described in the Braidwood/ Byron UfSAR were not adversely impacted by the original Braidwood Unit i The Braidwood Unit 1, Cycle 3 reload core was designed to perform under current nominal design parameters, Technical Specifications and related bases, and current Technical Specification setpoints such that:

1.

Core operating characteristics will be equivalent or less limiting than those previously reviewed and accepted; or 2.

For those postulated incidents analyzed and reported in the Updated Braidwood final Safety Analysis Report (UFSAR) which could potentially be affected by fuel reload, reanalyses or reevaluations have been performed to demonstrate that the results of the postulated events are within allowable limits.

Commonwealth Edison's reload safety evaluation process (SPIL/RSE review) is a verification to ensure that the previously reviewed and approved accident analyses are not adversely impacted by the cycle specific reload core design.

Commonwealth Edison's Braidwood Unit 1, Cycle 3 Reload Safety Evaluation applied both the LOCA and non-LOCA safety analyses presented in Braidwood/ Byron UFSAR, and relied on previously reviewed and accepted analyses reported in the UFSAR, fuel technology reports, and previous reload safety evaluation reports.

A detailed review of the core characteristics was performed to determine those parameters affecting the postulated accident analyses reported in the Braidwood UFSAR, and in Reference 1.

Commonwealth Edison verified that accident analyses presented in the UFSAR, as modified by the analyses described in Reference 1, were not affected by the reload core characteristics.

All aspects of the redesign have been reviewed against the original Cycle 3 safety parameters, and it has been determined that the Cycle 3 safety limits previously established remains valid for the redesign.

The reload safety evaluation demonstrated that no additional Technical Specification changes, beyond those previously described, are required for operation of Braidwood Unit I during Cycle 3.

Commonwealth Edison believes that both the On-Site and Off-site reviews will conclude that no unreviewed safety questions, as defined by 10CFR50.59, are involved with this reload.

More specifically with this reload; a)

The redesign does not involve an increase in the probability of occurrence of an accident previcJsly evaluated in the safety analysis repert.

The revised Biaidwood Unit 1 Cycle 3 design has been verified to satisfy ac'ident analysis limits and assumptions.

The design and coistruction of the reload core and its fuel assemblies is to the fame standards as the previously installed eqJipment.

As such, the probability of accidents applicable to all licensed M0ffs remains unchanged.

ZNLD/948/1

b)

The redesign does not involve an increase in the consequences of an accident previously evaluated in the safety analysis report.

The Braidwood Unit 1 Cycle 3 reload parameters have been verifled to be less limiting than than the bounding values assumed in the safety analyses. As such, the consequence of accidents previously analyzed remain unchanged.

c)

The redesign does not involve an increase in the probability of a malfunction of equipment important to safety which has been previously analyzed in the safety analysis report.

The reload core does not impact the design or operation of any active plant i

equipment, d)

The redesign does not involve an increase in the consequences of a malfunction of equipment important to safety which has been previously analyzed in the safety analysis report.

1he reload core does not impact the design or operation of any active plant equipment, e)

The redesign does not create the possibility of a new or different Lind of accident from any accident previously evaluated.

This is based on the fact that the reload core's structural, thermal-hydraulic, and nuclear characteristics are not significantly different from previously installed equipment and that the method and manner of plant operation is unchanged.

f)

The redesign does not create the possibility of a new or different type of a malfunction of equipment important to safety which has been previously analyzed in the safety analysis report.

This is based on the fact that the redesign does not change any core or fuel design requirement and does not affect any other plant system or component.

g)

The redesign does not involve a significant reduction in a margin of safety.

The Braidwood Unit 1, Cycle 3 reload core has been shown to remain within nresent safety analysis limits and therefore margins to safety limits have not been impacted.

The reference safety analysis of record is documented in the VANTAGE 5 Reload Transition Safety Report which has been approved under the provisions of 10CFR50.59, and in Chapter 4 and 15 of the Byron /Braidwood UFSAR.

Therefore, based upon the assumption that the On-Site and Off-site Reviews will find no unresolved safety questions, no additional prior NRC review and approval of the reload core analyses and application for amendment to the Braidwood Unit 1 operating license is required as a result of the cycle specific reload design for Cycle 3.

f ZNLD/948/8

.~. -. -.- -.-.

l Finally, verification of the Braideood Unit 1 Cycle 3 reload core design will~be performed per the standard reload startup physics tests.

These tests include, but are not limited to:

l 1.

A physical-inventory of the fuel in the reactor by serial number l

and location prior to the replacement of the reactor head; i

2.

Control rod drive tests and drop times; 3.

Critical boron concentration measurements; 4.

Control bank worth measurements using the rod swap technique; 5.

Moderator temperature coefficient measurements:

6.

Startup power distribution measurements using the incore flux mapping system.

7.

In addition, per the requirements of the NRC SER (Reference 3),

Braidwood will provide a report to the NRC detailing the results j

of the startop physics tests, l

l L

ZNLD/948/9-il_.-=,__-

......-.----,--.L..--..~.

- -... ~. - - ~ ~. - - - -... - -

\\

ATTACitMr.NT 2 Braidwood Unit I Cycle 3 Operating Limit Report - Fxy Portion (Revised 3/21/91)

This Radial Peaking Factor Limit Report is provided in accordance with Paragraph 6.9.1.9 of the Braidwood Unit 1 Nuclear Plant Technical Specifications.

The Fry limits for RATED THERMAL I'0WER witnin s, '*i' ed core planes for Cycle 3 shall be:

a.

For the lower core region from greater than or equal to 07. to less than or equal to 507.:

RTP 1.

F,y less than or equal to 2.304 for all co1*e planes containing bank "0" control rods, and RTP 2.

F less than or equal to 1.755 for all unfoddedcoreplanes.

x b.

For the upper core region from greater than 507. to less than or equal to 1007.:

RTP 1.

F less than or equal to 2.304 for all core planes xcohtaining bant "0" control rods, and i

l RTP 2.

F less than or equal to 1.934 for all unrodded xy core planes.

l These Fry (r) limits were used to confirm that the heat flux hot channel factor FQ(z) will-be limited to the Technical Specification values of:

F (z)s[L50) (K(z))

for P > 0.5 and, 9

P Fg(z)<(5.00] [K(z)]

for P 1 0.5 assuming the most limiting axial power distributions expected to result from the insertion and removal of Control Banks C and D during operation, including the accompanying variations in the avtal xenon and power distributions as described in the " Power Distribution Control and Load following Procedures",

HCAP-8403, September, 1974.

Therefore, these F limits provide assurance yy that the initial conditions assumed in the LOCA analysis are met, along with the ECCS acceptance criteria of 10 CFR 50.46.

See Figure i for a plot of (F.Pp,;) vs. Axial Core Height.

9 SY:me ZCZC:66:2

BRNDViOOD UNIT 1 CYCLE 3 (REVISED 3/22/91) f0(Z) X P vs. CORE HEIGHT FXY LiMll ANALYSIS 0

( 6.0L2 50)

~

I 2.60 0

x 2.50 s xi

( 12.0, 2.31) x i

x x~

N =-

Y 2.40 "x

  • ' X X X^^X

'Mhy' x

5 x

    • x x

<j 30 ~~

v x

x

^

x x x x x I

x 2.20 x

x

_1 i

2.10 :

X y

2.00 ;

m 5 1.90 ',

i g 1.80 7 25 1.70 :.

a:

EI1.50 !

4 E

1 1.50 +1x 1.40 i o Icp Sredbce List 1.30 :

o Edi:n Srdere LHi

~

1.20 :

i x G0CkdpisPcirt i

1.10jx 1.00 !

-x-LOG Lidiir,g Er.dpe

I

. e:

5 0.90 0

1 2

3 4

5 6

7 5

9 10 11 12 IUE B0ii0u CCOOGR(R)

. _ -