ML20073P911

From kanterella
Jump to navigation Jump to search
Commits to Provide Info Re Changes or Violations of NPDES Permit in Annual Environ Operating Rept,In Response to NRC ,Per Amend 73 to OL
ML20073P911
Person / Time
Site: FitzPatrick 
Issue date: 04/25/1983
From: Bayne J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Vassallo D
Office of Nuclear Reactor Regulation
References
JPN-83-35, NUDOCS 8304270304
Download: ML20073P911 (2)


Text

_ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

-0 9

POWER AUTHORITY OF THE STATE OF NEW YORK t o COLUMBUS CIRCLE NEW YORK, N.Y.1 o019 (212) 397-6200 LEnOy w. SimCLAin inueiEES JOHN S. DYSON WALTER T. KICINSKI L"l'/,".*;'~f.

t-~

-*~

oEO..E L,~. ALLS

'"/',','*"""''

~~~~~^'

Apri1 25, 1983

. Cw Ano " "'""

JPN-83-35 J1MES L LAROCCA STEPHEN L BAUM EOLLAND E. KIDDER ee

.a e

=a Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555 t

Attention:

Mr. Domenic B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing

Subject:

James A.

FitzPatrick Nuclear Power Plant Docket No. 50-333 Non-Radiological Water Quality Requirements Referencei NRC Letter, D.B.

Vassallo to L.W.

Sinclair, dated March 11, 1983, which transmitted Amendment No. 73 to the FitzPatrick Operating License.

Dear Sir:

The referenced letter transmitted Amendment No. 73 to the FitzPatrick Operating License, which deleted all Environmental Technical Specifications pertaining to non-radiological water quality requirements.

This letter also requested that the Authority l

l confirm a commitment to report to the NRC, at the time of their occurrence, changes to or violations of our permit issued under the National Pollution Discharge Elimination System.

The Authority made this commitment, and agreed to its formalization in the FitzPatrick Technical Specifications, at the request of the NRC staff. However, this requirement was j

not incorporated into Amendment No. 73.

8304270304 830425 PDR ADOCK 05000333 P

PDR 1

e-To simplify these reporting requirements and' at the same time be responsive to the NRC staff,-the Authority commits to provide the requested information in the Annual Environmental Operating Report required by Appendix B Technical Specification 5.6.1.a.

If you have any questions, please contact Mr. J.A. Gray, Jr.

of my staff.

Very truly yours, J.P..Bayne Executive Vice President Nuclear Generation cc:

Mr. J.

Linville Resident Inspector U.S.

Nuclear Regulatory Commission P.O.

Box 136 Lycoming, N.Y.

13093