Discusses Closure of Maint Team Reinspection Item Re Auxiliary Steam Piping in Diesel Generator Rooms
ML20073P679
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 05/17/1991
From: Gates W
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LIC-91-164R, NUDOCS 9105220218
Download: ML20073P679 (2)


Text

.

l Omaha Public Power District 444 South 16th Street Mall Omaha, Nebraska 68102-2247 402/636-2000 May 17, 1991 LIC-91-164R U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station Pl-137 Washington, DC 20555

Reference:

1.

Docket No. 50/285 2.

Inspection Report 90-36, " Maintenance Team Reinspection",

dated February 25, 1991 3.

Telecon between OPPD and NRC, May 8, 1991 Gentlemen

SUBJECT:

Closure of Maintenance Team Reinspection item (285/9036-01)

Regarding Auxiliary Steam Piping in Diesel Generator Rooms During the conduct of the inspection of Reference 2, it was noted that:

"The auxiliary steam system supplied heating steam for a number of buildings and equipment, including the emergency diesel generator... The auxiliary steam system was not designated as seismically designed system (classified as a safety-affecting or safety-related) and had apparently not been included in design basis documents.

The inspectors were concerned regarding the ability of the auxiliary steam system to withstand a design basis event or system failure without adversely impacting safety-related equipment, which was designed to function in a mild environment (normal l

temperature and humidity conditions).

This issue is an inspector follow-up item (285/9036-01) and will be evaluated in a subsequent inspection."

During Inspection 91-01 (Electrical Distribution System functional Inspection),

and in the followup telecon of Reference 3, the NRC requested information related to closure of this item.

Specifically, two submittals were requested, the first being an outline of the method that would be used for closure of this item, and the second (to be submitted 60 days later) to provide the actual l

evaluation for closure.

9105220218 910517 PDR ADOCK 050002G5 t

P PDR ju l

4s5124 Empayment utn tavat opportung q

mm-e

V. S. Nuclear Regulatory Commission LIC-91-164R Page 2 This letter provides the information related to the method of closure to be used, as requested above.

Closure of the subject item will be accomplished by l

filing the evaluation summary and conclusion letter, field sketches, informal calculations (prepared as checks on certain judgements) and background reference materials in the Engineering Analysis (EA) file created for that purpose (EA-FC-91-15).

In addition, a document which follows the standard EA format will be prepared to identify the purpose, assumptions, methods, conclusions and references for the EA.

This document will be independently reviewed and a copy of the completed document will be provided to the NRC by July 8, 1991.

Sincerely,

&. )

W. G. Gates Division Manager Nuclear Operations WGG/sel c:

LeBoeuf, Lamb, Leiby & MacRae R. D. Martin, NRC Regional Administrator, Region IV W. C. Walker, NRC Project Manager R. P. Mullikin, NRC Senior Resident Inspector