ML20073P677
| ML20073P677 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 04/30/1991 |
| From: | Baron M, Miller D PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| CCN-91-14067, NUDOCS 9105220211 | |
| Download: ML20073P677 (14) | |
Text
__
CCN-9 l-14 06 7
[
Pillt.ADlit.PillA !!! 1:CTHIC COMI'ANY N,[f Pf'.A0ll IKTl10Nl AluMit UWI R s! ATION k D I,lusJ0M H
%DL 41 Delu. Itunn h af d.
l'.414 num sorrow-He etmia to s u ettewa
("I') e % '014 D. It Millet, Jr.
Yke PretLient May 10, 1991 Docket Nos. 50 277 50 278 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20553 SUlljECT:
Peach llottom Atomic Power Station Monthly Operating Report Gentlemen:
Enclosed are twelve copies of the monthly operating report for Peach !!ottom Units 2 and 3 for the month of April 1991 fonvarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4.
f S.inc+rr ely, 2
/
' /-
l f
u ifi ' O un. h36 DilM/AAP/ JN/DRM/MJil: cme Enclosure ce:
R.A. Burricelli, Public Service Electrie & Gas T.M. Gerusky, Commonwealth of Pennsylvania l
JJ.1.yath, USNRC Senior Resident inspector R.I. Mel,ean, State of Maryland T.T. Martin, Administrator, Region I, USNRC II.C. Schwemm, Atlantic Electric
- l. Urban, Delmarva Power INPO Records Center f) co mt.NRc
/
9105220211 910430
\\
FDR ADOCK 05000277 R
NI(C Monthl) Ogwrations Summary Prach flottom Atomte Pemtr Station j
April 1991 0511.2 The unit began the month in the refuel maic, with refueling outage aethities in progrcss.
j The unit was placed in start up April 17 and was synchronized to the grid on April 18.
1 On April 24 the turbine was tripped and power was reduced to 1(&v for investigation of a high oil level alarm on the Il llcactor Retire pump.
Power ascension was resumed on April 25 after the condition causing the high oil level alarm was resolved, and the unit was synchronized to the grid the same day. The unit achieved nominal 98% power by the end of the month.
11 hill The unit began the month at nominal 1(X)% powcr.
During the weckend of April 31, p<>wer was tcduced to nominal 61% for r M pattern adjustment and preventive maintenance. The unit was returned to nominal 1(XM power by April 24.
ccwt.Nuc
Docket No.91-277 Attachment to hionthly ()perating iteport for April IW1 iMf1 Rill!LLLNIt_thl3LHA1111LLN 1.
Name of facility:
l'each llottom Unit 2 2.
Scheduled date for next refueling shutdown:
lleload 9 scheduled for September 5,1W2.
1 Scheduled date for restart followirg refueling:
ltestart following refueling forcer.t for November 22, IW2.
4.
Will refueling or resumption of operation therefore require a technical specification change or other license amendment?
No.
II answer is yes, what, in general, will these be?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
N/A ti.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplict, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
N/A COv491. Nit (.
Docket No. 50 277 Attachment to hionthly Operating Report for April 1991 Page 2 ifNIT 2 REI L111NG INFORhlillOh (Continued) l 7.
The nurnber of fuct auemblics (a) in the core and (b) in the spent fuel storage pool:
(a)
Core 7M 17uel Aswmblics (b) fuel Pool 18% l'uel Auemblics, $8 fuel Rmis I
The present licensed yient fucl wl storage capacity and the slic of any increase in licensed storage 8.
t capacity that has been requested or is planned, in number of fuel auemblies:
The spent fuel gwl storage capacity has been relicenwd for Nil 9 fuct auemblics.
9.
The projected date of the last refueling that can be discharged to the ywnt luel ml assuming the I
present capacity:
September 2W without full core ofiload capability.
September 1W7 with full core oilload capability.
CCN91.NRC
DocLet No. 50 278 Attachment to Monthly Operating fleport for April IW1 UNIT 3 HITtTI ING INFORM ATION 1.
Name of facility:
Peach flottom Unit 3 l
l 2.
Scheduled date for next refueling shutdown:
Itcload 8 scheduled for September 7, twl 3.
Scheduled date for restart following refueling flestart following refueling scheduled for December 6, IW1 4.
Will refueling or resumption of operation thereafter require a technical r.pecification change or oth:r license amendment?
No.
If answer is yes, what, in general, will these be?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
N/A 6
Important licensing considerations associated v.4h refueling, e.g., new or dif ferent fuel design or supplier, unreviewed design or performance analysis metnvis, significant changes in fuel design, new operating procedures:
N/A l
C0491.NRC l
Docket No..%278 Attachment to Monthly Operating Report for April IW1 l' age 2 UNIT 3 Hi I(Tl ING INL1LIA1103 (Continued) 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool; (a) Core 7M Fuel Assemblics (b) Fuel Pool 1M9 fuel Assemblics,6 Fuel Rtxls 8. The present licenwd spent fuel piol storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned,in number of fuel assemblies: The spent fuel piol storage capacity has been relicensed for 3819 fuel assemblics. ModiGcation of the fuel poolis expected to be complete in the second quarter of IW1. 9 The projected date of the last refueling that can be diwharged to the spent fuel pol assuming the present capacity: With the current fuel pnl capacity (prior to the completion of the furi piol rcracking mmlification): September 19% without full core of00ad capability, lind of nest cycle with full core of00ad capability (est. January 1WI). With increased fuel pool capacity (subst quent to the completion of the fuel pool rcracking modiGeation): Sep' ember 2tol without full core olfload capability. September 1WH with full core of00ad capability. C(N91.N RC
AVIRAGE DA!LY Uhli POWIR t(Vil D3CLET hD. 50 - 277 Uhli PfACH BOT 10W UN11 2 DATE MAY 15, 1991 COMPANY PHIL ADEL PHI A [t(CIR1C COMPAhY M J. BARON SUPERVISDR REPOR15 LROUP P[ACH li0llDM A10MIC POVER STA110N TELEPH0kt (717) 45C-7014 [X1, 3321 MONTH APRIL 1991 DAY AVER AGE dally POWER LEvil DAY AVERAGE CAllY PDWEP LEVIL (MsE-hET) ( Me[ -h ti ) 1 0 17 0 2 0 IB 110 3 0 19 104 4 0 20 181 5 0 21 IB4 0 0 22 195 7 0 13 297 8 0 24 32 9 0 25 125 10 0 20 370 11 0 27 748 12 0 2B 1045 13 0 29 1048 14 0 30 1030 15 0 10 0 l
~ _ _ _ _ _ _ _ _. I. l I .1 1 AV[ RAG [ DAllV Uh!T POWIR ((Vf L i DOCLET hD. 50 - 278 U411 FI ACH B0fiDM UN!! 3 j Daft MAY 15, 1931 COMPAhv PHIL ADELPHI A [ llc 1RIC CDMPAhY 1 M. J. BARDN SUr[RVISOR REPDRTS GRDUP r[ ACH BoiTOM A;OM]c POV1R 51 A110N l 1[L[ PHON [ (117) 456-7014 [1f. 3321 M3 NTH april 1991 DAY AV[R AGE DAILY PDV[R (( VEL DAY AVERAGE DAIL Y PDVER ((V[L l (Mi[-h[i) (Wi[-h[1) 1 1048 17 1052 l 2 1052 18 1050 3 1064 19 1057 l 4 1001 20 080 5 1037 21 829 6 1030 22 975 l l 7 1020 23 1062 1 8 1070 24 1057 9 1046 25 1048 10 1000 26 1004 11 1056 27 1056 12 1050 26 1001 13 1050 29 1056 14 1056 30 1055 15 1058 16 1054 l i
OPER AlthG DAT A R[P021 DOClli hD. 50 - 277 DAll MAY 15, 1991 C0pril1[D BY PHit ADELPHI A [L(C1RIC COM"AhY M. J. BARON SUPIRVISOR R[PDR15 GROUP P( ACH BD110M ATOMit POVlR 51 A110N littPHONE (717) 450-7014111. 3321 I DP[RAllhG STA1VS \\
- 1. UN 11 h AMI : PEACH 0011DM UNil 2 h01L5:
- 2. REPORilh1 P(R100:
APRll, 1991
- 3. Ll![h5f D THE*. MAL POWER (Fil):
3?93
- 4. NAM [PL All RAllhG (GROSS FWC):
1152
- 5. DC51GN [LIC1R: CAL R AllhG (hti Mst):
1005
- 6. MAX 1MJM DEPLh0Abt[ CAPAtl1Y (04055 Mdf): 1098
- 7. MAXIMaM DCP[hDABLE CAPAC11Y (hti MVC):
1055
- 8. If CHANGES DCCLE IN CAPAC11Y KAllhG5 (11[M5 NUMB [R 31HR00GH 7) SlhC[ L A51 R[PDR1, Givt Rf A50NS:
- 9. POWER ((V[L 10 VHICH RE51RICTID, if AhY (hl1 Md[):
- 10. RI ASONS FOR RC51RIC110NS, if ANY:
1H15 MONTH YR-10-DAll CUMUL A11 VE
- 11. HOURS IN R[POR11hG P[RIOD 719 2,879 147.455 12 NUMBER OF HOURS REAC10R WAS CR11l CAL 393.6 (58.0 87.358.7
- 13. RE AC10R RLSERVE SHUIDOWN HCUR5 0.0 0.0 0.0
- 14. HOLAS G[h[RA10R ON-L lh[
?93.5 557.9 B4,143.0
- 15. UN!1 RE5LRVE SHUIDOVW HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL [htRGY GEhf RAl[D (MWH) 500,11?
1.355,83? 747,77?,805
- 17. GROSS [LICTRICAL lhlRGY GENtRAl[D (MWH) 139,700 423,700 B1,431.990
- 18. hti (L[CTRICAL th[RGY G[h[RAl[D (HVH) 130.219 393,74?
77.953,888 PAGI 1 0F 2
OP[RAllhS VATA R[tDR1 (CONilNJ1D) DDCtti NO. 50 277 DAfl MAY 15, 1991 THl$ M? NTH VR-10 DAlt C UMUL At lV[
- 19. UN!1 $[RVICf FACTOR 40.8 19,4
$1.1
- 20. UNIT AV AIL AB!L!TY FACf DR 40,8 19.4
$7.1
- 21. UNii CAPAC11Y F ACf 0R (USING MDC h[i) 17.2 13.1 50.1
??. UN!i CAPACITY F ACTOR (U$lh3 D[R hii) 17.0 13,0 49.6 23, UN!! IORC[D OUTAGE RATE 0.0 0.0 14.3
- 24. SHUTDOWNS SCHlDULID UVER h[Xi 6 M? NTH 5 (itF[, DAll, AhD DUR A110t Of [ACH):
25, IF !HU1DOWN Af thD Or R[ PORT FIRIOD, [511MA1ED DAll 05 STARTUP: if.. UNIT 5 th T[51 ST ATUS (PRIDR 10 COMMIRCI AL Ol'IR A110N): f0RlCA51 AL Hi[ V[ D IN!!! AL CRl11[ AL11Y 09/16/73 INITIAL flitfRIC11Y 02/18/14 ( I CDMMERCI AL OFIRA110N 07/05/74 l FAGE 2 0F 2 l l l A A
Or[ RATING DATA R[ PORT 00CL[1 NO, 50 - 278 DAlf MAY 15, 1991 COMPLIl[0 BY PHILADELPHI A [L[C1RIC CDMPANY M. J. BARON $UP[RVISOR R[PDRIS GROUP PEACH B011DM AfDMit POWER ST A110N 1[L(PHONE (?!'..).456-1014 [XI. 3321 OP[ RATING $1A10$
- 1. UNIT NAM [ P[ACH B0110M UNIT 3 N01[$:
- 2. R[PDRf!NG P[RIOD:
APRIL, 1991
- 3. LIC[N$(D TH[RMAL POV[R(MVT):
3293
- 4. NAM [ PLAT [ RATING (GR0$$ MW[):
1152
- 5. DE$1GN [L[CTRICAL RA11NG (N[i MWI):
1005
- 6. MAXIMUM DCP[NOABLt CAPAtlif (GROS 5 MWL): 1D98 7, MAXIMUM DlP[NDABL[ CAPAC11Y (k[1 MWE):
1035
- 8. If CHANGES DCCUR IN CAPACITY RA11NG$ (11[M5 kUMO[R 3 THROUGH 7) SINC [ L A51 R[POR1, GIVE REASONS:
- 9. POW [R L[V[L 10 VHICH R[$1RICi[D, IF ANY (N[1 MWL):
- 10. REASONS FOR R[51RICil0NS, Jr ANY:
THl$ MONTH YR-10-0Alf COMUL AllVL
- 11. HOUR $ IN REPDRIlNG P[RIDO 719 2,879 143,351 12, NUMB [R Of HOUR 5 REACIDR WAS CR!ilCAL 719.0 2,759.$
87,702.4
- 13. R[ACIDR RIS[RV[ SHU1DOWN HOUR $
0.0 0.0 0.0
- 14. HOURS G[NERATOR ON LINE 719.0 2,736.7 84,827.3 15, UNii R[5[RVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROS $ TH[RMAL [N[RGY GCNERATED (HWH) 2,301.096 8.605,890 248,518,402 17, GROSS [LICTRICAL [N[RGT GENERAT[D (MWH) 166,800 2,883.700 81.559,232
- 18. N[1 [L[CTRICAL [N[RGY G[N[RAl[D (MWH) 742,041 2.794,167 18,170,839 PAGE I Or 2 i
t .,..~.- - -..-. _,~. _. _ ~
DitRAllNG DATA R(PDR1 (CONTINULO) DDCtti N3. 50 - 278 DAlt MAY 15, 1991 1H15 H3 NTH TR-10-DATE CUMCIA11Vl
- 19. UN11 SERVICE F AC10W 100.0 95.1 59.2
- 10. UNil AVAIL ABIL11Y FACf DR 100.0 95.1 59.2
- 21. UN!1 CAPAC11Y FACIDE (USING MDC NL1) 99.7 93.B 52.7
??. UN!1 CAPAC11Y F ACIDR (U51NG DER NI1) 96.9 91.1 51.?
- 23. UNil FORClD OUTAGE R Alt 0.0 4,9
!?.3
- 24. $HU1DDVN5 $CHEDULED OVER NtXI_6 MONIHS (lVP[, OAlt, AND DURA 110N OF [ ACH):
61H REFU[L ING, $lPl[MBER 7, 1991 10 DittNBt R 6, 1991, 91 DAY 5.
- 25. If SHUIDO 'N Al ikD OF R[ FORT PERIOD. f 511 mal [0 DAl[ Of $1 ARIUP:
- 26. UN115 th 1[5T ST ATUS t/RIDR 10 COMMIRCI AL OPIR A1:0%):
FORICAST ACHI[Viq IN!11 AL CR111CAtl1Y 08/07/74 IN111AL (LtC1RIC11Y 09/01/74 CDMMfRCIAL 0FERA110N !?/?3/74 PAGC 2 Of 2 I C.....
I t: Nil SHJTDOWNS AND POWER REDUCil0NS D0tt[1 hD. !b - ??? tsN11 Naut PE ACH B0110M UNil ? Call MAY 15, 1991 c[ FORT HONTH APRIt, 1991 C0"Di[1[D BY PHil ADllPHI A EL[CTRIC COMPANY N J. BARON $UP[R Vl $0R REPORi$ GROUP PI ACH B0f f 0M AIDMit POVER $1 A110N 1[l[PH3N[ (117) 450 7014 [XI. 3321 METHDD OF tlc [N5f[ $YST[W COMPONE N T CAU$l AND CDRR[LilVi TYPC DUR A110N RIA$0N SHU111NG D0VN [ VENT COD [ C ODC AC110N TO hD, DAT[ (1) (HDURS) (?) k[AC10R (3) REPORT i (4) ($) PR[YINI RICURR[NCE I 9104'! 425.$ C ? N/A Il Z272/7 PL ANN [D R[FU[L DU1 AGE l 2 9104?3 f 0.0 H 4 N/A CB PUMPXX 'B' R[ CIRC PUMP HI Ott (( VEL R[ ACTOR NDT ' HUT DOWN l 42$ $ (1) (2) (3) (4) f - f0RC(0 REASON METHOD [xHIBli G - Ik51RUCfl0NS $ - SCHf.DUL(D A. [0Ulf M[hi FAILim[ ([XPLAlk) 1 - MANUAL FOR PR[ PARA 110N Of DATA B - MAINi[NANC[ OR 1[$T ? - MANUAL $ CRAM. [NTRY SHEE15 FOR LIC[NS(( C. R[ FUELING 3 - AUTOMAllC SCR AM, [V[Ni G[ FORT (l[R) D - R[GULATORY R[$iRICTION 4 - OTHER (EXPLAIN) FIL[ (NUR[G-0101) [ - OPERATOR TRAINING + LIC[N5E [XAMINA?!ON f - ADMIN!$1RAllV[ ($) G - OP[RA110NAL [RROR ([XPL AIN) H - OTHERf[XPL AIN) IXHlBIT I - SAME $0VRCE a
UNil SHUID0VNS AND POWER REDUCTIONS DOCKET NO. 50 278 UNil NANC PEACH B0110M UNIT 3 DATE MAY 15, 1991 REPORT MONTH APRIL, 1581 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR REPORTS GROUP PE ACH ROT 10M ATOMIC POVER STATION TELEPHONE (117) 4$6 7014 EXT. 3321 METH00 Of LICENSEE SYSTEM CDMPONE NT CAUSE AND CORRECTIVE TYPE DUR AT ION REASON SHUT 11NG DOUN E VE N T CODE CODE ACTION TO NO. DATE (1) (HOURS) (2) REACTOR (3) REPORT f (4) (5) PREVEFT RECl%RENCE I 5 910420 S 0.0 8 4 N/A HC HTEXCH B1 VATERBOX WORK -F 910420 5 0.0 H 4 N/A CH PUMPXX 3B AX fif D PUMP VORK ON COUPLING S 910420 5 0.0 H 4 N/A RB CONR10 77 PATTERN ADJUSTMENT SfACTDR NOT SHUT D0VN I (1) (2) (3) (4) F - FDRCEO REASON METHOD EXHlBli G - INSlRUCTIONS S - SCHEOULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF OATA B. MAINTENANCE OR TEST 2. MANUAL SCRAM. ENTRY SHEETS FDR LICENSEE C REFUELING 3 - AUTOMA11C SCRAM. EVENTREPORT(LER) D. REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE !NURE3-0161) E OPERAIDR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (S) G-OPERAfiONALERROR(EXPLA!N) i l. N - OTHER(EXPLAIN) EXHIBli 1 - SAME SOURCE l t I V l l l t -~}}