Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20076C326 + (08:01:12, 15 December 2024)
- ML20076C327 + (08:01:12, 15 December 2024)
- ML20076C325 + (08:01:13, 15 December 2024)
- ML20076C321 + (08:01:14, 15 December 2024)
- ML20076C322 + (08:01:14, 15 December 2024)
- 05000443/LER-1991-007, :on 910615,actuation of Control Room Emergency Air Cleanup & Filtration Subsystems Occurred.Caused by Personnel Error Due to Lack of Attention to Detail.Event Will Be Discuss W/Respective Operating Crews + (08:01:16, 15 December 2024)
- 05000316/LER-1983-064-03, /03L-0:on 830717,computer P-250 Which Logs Axial Flux Difference Failed.Caused by Personnel Error.Personnel Counseled + (08:01:18, 15 December 2024)
- A16764, Radiochemical Analysis of First Plateout Probe from Fort St Vrain High-Temp Gas-Cooled Reactor + (08:01:19, 15 December 2024)
- ML20076C314 + (08:01:20, 15 December 2024)
- 05000316/LER-1983-063-03, /03L-0:on 830709,steam Generator 2 Stop Valve MRV-220 Drifted Off Open Detents.Cause Not Stated.Detents Spring Tension Adjusted + (08:01:22, 15 December 2024)
- ML20076C310 + (08:01:23, 15 December 2024)
- ML20076C308 + (08:01:24, 15 December 2024)
- 05000366/LER-1983-062-03, /03L-0:on 830720 & 25,core Max Fraction of Limiting Power Density Exceeded Fraction of Rated Thermal Power.Caused by Peaks in Core Flux.Average Power Range Monitor Adjusted + (08:01:25, 15 December 2024)
- 05000316/LER-1983-062-03, /03L-0:investigation Determined 830616 & 24 Events Re Control Room Cable Vault Fire Detection Instrumentation Reportable.Events Caused by Pyralarm Detectors Alarming W/ No Adverse Conditions.Fire Watch Established + (08:01:27, 15 December 2024)
- ML20076C299 + (08:01:28, 15 December 2024)
- ML20076C295 + (08:01:29, 15 December 2024)
- 05000280/LER-1983-032-03, /03L-0:on 830718,svc Water Pump 1-SW-P-10B Would Not Develop Sufficient Discharge Pressure.Caused by Valve Not Properly Sealed Due to Matl in Svc Water.Check Valve Flushed Out + (08:01:30, 15 December 2024)
- ML20076C279 + (08:01:32, 15 December 2024)
- ML20076C280 + (08:01:32, 15 December 2024)
- ML20076C275 + (08:01:33, 15 December 2024)
- ML20076C272 + (08:01:33, 15 December 2024)
- U-601847, Reactor Containment Bldg Integrated Leak Rate Test. W/ + (08:01:34, 15 December 2024)
- ML20076C269 + (08:01:35, 15 December 2024)
- 05000361/LER-1983-010-01, Creacus Train a Failed to Maintain Required Positive Pressure in Control Room During Testing & Declared Inoperable.Caused by Air Leakage Through Control Room Boundary.New Door Seals Installed + (08:01:36, 15 December 2024)
- ML20076C265 + (08:01:37, 15 December 2024)
- 05000362/LER-1983-051-03, /03L-0:on 830712,while in Mode 4,condenser Air Ejector Monitor 3RT-7870 Discovered to Have Low Flow During Routine Daily Surveillance & Declared Inoperable.Caused by Valve Manipulation by Unauthorized Personnel + (08:01:39, 15 December 2024)
- ML20076C253 + (08:01:40, 15 December 2024)
- ML20076C257 + (08:01:40, 15 December 2024)
- ML20076C241 + (08:01:41, 15 December 2024)
- ML20076C250 + (08:01:41, 15 December 2024)
- ML20076C236 + (08:01:42, 15 December 2024)
- ML20076C234 + (08:01:43, 15 December 2024)
- 05000389/LER-1983-036-03, /03L-0:on 830714 & 18,personnel Airlock Outer Door Seal Failed Routine Leak Test Surveillance.Caused by Improper Seating of Door Seal.Operating Mechanism Adjusted + (08:01:44, 15 December 2024)
- TXX-4023, Deficiency Rept Re Inadequate Overpressure Protection for Spent Fuel Pool Cooling HXs for Component Cooling Water. Pressure Relief Piping & Valve Component Configuration Evaluated + (08:01:45, 15 December 2024)
- ML20076C202 + (08:01:46, 15 December 2024)
- 05000416/LER-1983-085-03, /03L-0:on 830719,inadvertent LOCA Signal Received in Div II LOCA Logic & RHR Pump B Breaker Closed Repeatedly Following Isolation.Cause of LOCA Signal Due to Troubleshooting Investigation + (08:01:48, 15 December 2024)
- ML20076C189 + (08:01:51, 15 December 2024)
- STC-20-020, Notification of Acceptance to the Brachytherapy & Gamma Knife & Other Uses (H-313) Course - Virtually: August 3-7, 2020 + (08:01:52, 15 December 2024)
- ML20076C162 + (08:01:54, 15 December 2024)
- ML20076C184 + (08:01:54, 15 December 2024)
- ML20076C154 + (08:01:55, 15 December 2024)
- ML20076C153 + (08:01:56, 15 December 2024)
- ML20076C151 + (08:01:56, 15 December 2024)
- ML20076C147 + (08:01:57, 15 December 2024)
- ML20076C148 + (08:01:57, 15 December 2024)
- 05000321/LER-1983-071-03, /03L-0:on 830719,while Performing Procedure HNP-1-3119,MSIV Closure Relay C71-K3D Would Not Deenergize, Stopping MSIV B21-F022B & B21-F028B from Opening.Caused by Failed Closure Relay.Relay Replaced + (08:01:59, 15 December 2024)
- ML20076C144 + (08:02:00, 15 December 2024)
- 05000370/LER-1983-032-03, /03L-0:on 830630,during Implementation of Mod, Nitrogen in Accumulator for Upper Head Injection Isolation Valve 2NI-243 Insufficient to Close Valve.Caused by Component Malfunction Due to Nitrogen Leakage + (08:02:01, 15 December 2024)
- RBG-15-650, Interim Deficiency Rept DR-108 Re Pipe Support Std Components Supplied by Bergen-Paterson Pipe Support Corp Not Conforming W/Parts Identified on Corresponding Load Capacity Data Sheets.Next Rept by 830926 + (08:02:02, 15 December 2024)
- 05000416/LER-1983-098-03, /03L-0:on 830718,air Start Solenoid Valve F508C Failed to Operate,Resulting in Diesel Generator Failure to Start.Caused by Open Circuit Coil on Solenoid.Valve Replaced + (08:02:04, 15 December 2024)
- 05000373/LER-1983-085-03, /03L-0:on 830718,cooldown Rate in Excess of 100 F/ H Observed When full-core Scram Occurred.Caused by Rapid depressurization,full-core Scram & HPCS & RCIC Injection. Parameters Returned to Normal + (08:02:06, 15 December 2024)