Interim Rept on Significant Const Deficiency 55 Re Incorrect Structural Calculations for Holdup & Boric Acid Makeup Tanks.Initially Reported on 830623.Final Rept Will Be Submitted by 830907
ML20076C154
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/05/1983
From: Drummond F
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3I83-0272, W3I83-272, NUDOCS 8308220252
Download: ML20076C154 (1)


Text

- _ _ _ _ _ _ _ _ _ _ - _ . _ _ _ _ _ _

1 Louisiama P O W E R & L 1 G H T ! New QRLEANS LeutGANA

,4, oet o~oe 1. <1 . .meo ecce 70174-6000 4 (504)3664345 MIDDLE SOUTH UTtuTIES SYSTEM August 5, 1983 W3183-0272 Q-3-A35.07.55 Mr. John T. Collins, Regional Administrator, Region IV 55 J g%  ;;

U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 ggg { S %

Arlington, Texas 76012 (,,

SUBJECT:

Waterford SES Unit No. 3 ~.----

Docket No. 50-382 Significant Construction Deficiency No. 55

" Hold Up and Boric Acid Make Up Tanks Incorrect Structural Calculations"

REFERENCE:

LP&L letter W3183-0220 dated June 23, 1983

Dear Mr. Collins:

The above referenced letter indicated submittal of a Final Report to the USNRC no later than August 5, 1983.

At the present time, the supporting documentation is under review and a Final Report is in preparation.

A Final Report will therefore be submitted to the USNRC by September 7,1983.

Very truly ours, h p-_-

F. J. Drummond Manager Engineering & Technical Services FJD/WAC/ MAL;keh cc: 1) Director 3) Mr. E. L. Blake Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555

2) Director 4) Mr. W. M. Stevenson Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, D.C. 20555 0308220252 830805 PDR ADOCK 05000382 S PDR IE-17 Ijo