Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20076M701 + (07:12:58, 15 December 2024)
- ML20076M698 + (07:12:59, 15 December 2024)
- 05000353/LER-1994-009-02, :Between 940829 & 0906,approved Clearance Incorrectly Specified Removal of Fuse from D21 EDG Breaker Auxiliary Control Power Circuit That Would Prevent a CS Sys Subsystem from Automatically Starting + (07:13:01, 15 December 2024)
- 05000373/LER-1983-042-03, Inboard MSIVs 1B21-FO22A, B,C & D Found Leaking Above Tech Spec Limit.Caused by Imperfect Seating of Disc & Seat Surfaces.Valves & Discs Lapped & Reinstalled + (07:13:03, 15 December 2024)
- ML20076M693 + (07:13:04, 15 December 2024)
- ML20076M694 + (07:13:04, 15 December 2024)
- ML20076M691 + (07:13:05, 15 December 2024)
- 05000354/LER-1994-015, :on 941007,RPS Actuation - Invalid Main Turbine Trip Resulted in Reactor Scram Due to Component Failure.Ehc Card Replaced & Satisfactorily Tested & Failure Analysis Performed on Failed Card + (07:13:06, 15 December 2024)
- ML20076M688 + (07:13:07, 15 December 2024)
- ML20076M687 + (07:13:08, 15 December 2024)
- 05000278/LER-1994-005-03, :on 941011,Unit 3 Scram Occurred Due to Static Inverter Failure.Appropriate PCIS & RPS Scram Logic Reset & Affected Sys Reset to Appropriate Configuration & Failed Unit 3 Transformer Replaced & Properly Setup + (07:13:09, 15 December 2024)
- ML20076M682 + (07:13:10, 15 December 2024)
- 05000254/LER-1994-015-03, :on 941002,single Loop Operation in Unanalyzed Condition Occurred.Caused by Failure to Previously Establish,In Procedure & Training,Min Core Flow Limit. Training & Procedure Revised + (07:13:12, 15 December 2024)
- 05000254/LER-1994-015, Forwards LER 94-015-00:on 941002,single Loop Operation in Unanalyzed Condition Occurred + (07:13:13, 15 December 2024)
- ML20076M669 + (07:13:13, 15 December 2024)
- ML20076M663 + (07:13:14, 15 December 2024)
- TXX-4008, Discusses Suppl 3 to SER (NUREG-0797) Requiring Bore & Keyways of low-pressure Turbine Discs Be Inspected Ultrasonically During First Refueling Outage.Licensing Condition Unnecessary & Should Be Deleted + (07:13:15, 15 December 2024)
- ML20076M643 + (07:13:15, 15 December 2024)
- ML20076M641 + (07:13:16, 15 December 2024)
- ML20076M635 + (07:13:17, 15 December 2024)
- ML20076M632 + (07:13:19, 15 December 2024)
- ML20076M607 + (07:13:19, 15 December 2024)
- ML20076M604 + (07:13:23, 15 December 2024)
- ML20076M598 + (07:13:24, 15 December 2024)
- ML20076M583 + (07:13:25, 15 December 2024)
- 05000373/LER-1983-064-03, /03L-0:on 830613,Div 1 post-LOCA Oxygen Monitor Drifted Downscale & Declared Inoperable.Caused by Dust Particles in Metering Valve at Analyzer Cell.Oxygen Monitor Calibr Per LIS-PC-07 + (07:13:27, 15 December 2024)
- ML20076M574 + (07:13:28, 15 December 2024)
- ML20076M573 + (07:13:29, 15 December 2024)
- ML20076M562 + (07:13:30, 15 December 2024)
- ML20076M541 + (07:13:31, 15 December 2024)
- ML20076M539 + (07:13:36, 15 December 2024)
- HL-4727, Special Rept:On 941007,discovered That Required Hourly Fire Watch Patrol Initiated for Fire Area 0040 on 920629 Inappropriately Terminated Due to Personnel Error.Hourly Fire Watch Patrol for Affected Area re-established + (07:13:37, 15 December 2024)
- 05000461/LER-1994-008, :on 940417,identified That Reactor Recirculation Pump Discharge Valves Outside Seismic Design Bases Due to Loose Yoke Connections.Cause Unknown.Loctite Applied to Threads of Studs/Nuts + (07:13:43, 15 December 2024)
- ML20076M515 + (07:13:44, 15 December 2024)
- ML20076M510 + (07:13:45, 15 December 2024)
- ML20076M513 + (07:13:45, 15 December 2024)
- ML20076M505 + (07:13:46, 15 December 2024)
- ML20076M503 + (07:13:46, 15 December 2024)
- 05000266/LER-1994-011, :on 941004,discovered That on 940409 Redundant DHR Requirements Not Met During Refueling Outage Due to Inadequate Communication to Operators Re Interpretation of TS 15.3.1.A.3.b.Both RHR Pumps Secured + (07:13:48, 15 December 2024)
- ML20076M499 + (07:13:49, 15 December 2024)
- RBG-39360, Submits 1994 Evaluated Exercise objectives,90 Days in Advance,To Be Fulfilled During River Bend Station Emergency Planning Exercise + (07:13:50, 15 December 2024)
- NRC-94-0108, Forwards Test Rept Re Results of Special Control Ctr HVAC Fan Pressure Test + (07:13:51, 15 December 2024)
- ML20076M492 + (07:13:52, 15 December 2024)
- NRC-94-4330, Forwards Proprietary AP600 Notrump Core Makeup Tank Preliminary Validation Rept, MT01-GSR-001,Rev 0.Rept Withheld (Ref 10CFR2.790) + (07:13:53, 15 December 2024)
- ML20076M488 + (07:13:53, 15 December 2024)
- ML20076M474 + (07:13:54, 15 December 2024)
- ST-HL-AE-4908, Forwards Change QA-023 to Operations QA Plan. Change Will Be Incorporated in Operations QA Plan in Next Biennial Update + (07:13:55, 15 December 2024)
- ML20076M470 + (07:13:55, 15 December 2024)
- 05000298/LER-1994-024, :on 941002,inoperable Condition of Halon Sys in Svc Water Pump Room Identified.Caused by Inadequate Procedures.Procedure 0.39, Fire Watch Will Be Revised.W/ + (07:13:59, 15 December 2024)
- 05000271/LER-1994-011, :on 941005,failure to Properly Identify All Areas Requiring Emergency Lighting Units in Accordance w/10CFR50 App R,Section Iii.J Identified.Caused by Cognitive Human Error.Task Team Evaluation Initiated + (07:14:01, 15 December 2024)
- 2CAN119402, Clarifies Util Intention to Not Install Replacement Breakers in Next Practical Refueling Outage for ANO Unit 2, Per Concern Raised Re Circuitry Isolation During Electrical Distribution Sys Functional Insp of Facility + (07:14:03, 15 December 2024)