]lTg IIUUglUll
(
(
(
~
W company
=
Eleitric Tower PO Box 1700 October 7, 1976 a
Houston. Texas 77001 l
J AC-HL-AE-181 Mr. Benard C. Rusche
- r. h %
Director, Office of Nuclear
. :( t Reactor Regulation
.$ 3 '.T1.
.11 #
U.S. Nuclear Regulatory Coninission Washington, D. C.
20555
.,,-ef' i
--
- 3:s
.~
Dear Mr. Rusche:
.\\
Allens Creek Nuclear Generating Statiori 3
Units 1 and 2 Docket Nos. 50-466, 50-467 In confinnation of my telephone conversation with you on September 7,1976, this letter serves as official notification that Houston Lighting & Power Compan'y has reactivated the Allens Creek Nuclear Generating Station on a modified schedule.
The schedule now calls for the construction of one 1,200,000 - kilowatt nuclear unit (Unit 1), with construction activities anticipated to begin in late 1978 with completion scheduled for 1985.
Plans for Unit 2 have been cancelled.
As originally announced for Allens Creek, the General Electric Company will supply the NSSS and turbine-generator and Ebasco Services, Inc. will provide architect-engineering and construction services.
HL&P anticipates submitting to the NRC in mid-November,1976 a letter describing changes to be made to the Allens Creek design.
This letter was discussed in the September 23, 1976 meeting between HL&P and the NRC staff.
Very truly yours, i
. - ~ ' - -
8307200417 830711
' 77 '.".'4 3 PDR ADOCK 05000466 7
1 --
A PDR v
G.1 pre
'gg g-i Exe ut1ve e President A.A..
RWL/vj
,3,G,$
cc: Messrs. R. M. McCuistion W. M. Menger J. R. Sumpter D. R. Betterton
~ ~ -
C. G. Thrash (Baker & Botts)
'3' P. A. Horn GNClo.ruAs /
f... s j
- s KETED DOL.<p y i,
'82 OCT -6 P4 :05 UNITED STATES OF AliERICA NUCLEAR REGULATORY COMMISSION
BEFORE THE ATOMIC SAFETY AND LICENSING';;BOARDa SEic
- z..n iiCH g
In the Matter of
)
.,,pg HOUSTON LIGHTING & POWER COMPANY Docket No. 50-466
/f4
)
7' (Allens Creek Nuclear Generating
)
Station, Unit 1)
)
//G V-4' I si WITHDRAWAL OF APPLICATION
/
70 -
The Houston Lighting & Power Company hereby withdraws its application for a construction permit for the Allens Creek f.*uclear Generating Station in the subject docket.
Respectfully submitted this 6th day of October, 1982.
OF COUNSEL:
By F
/ MC
'/
LOWENSTEIN, NEWMAN, REIS ack R.
Newman
& AXELRAD, P.C.
David B. Raskin 1025 Connecticut Ave., N.W.
1025 Connecticut Ave.,
N.W.
c Washington, D.C.
20036 Washington, D.C.
20036 BAKER & BOTTS, J. Gregory Copeland 3000 One Shell Plaza Scott E.
Rozzell Houston, Texas 77002 3000 One Shell Plaza Houston, Texas 77002 RECEIVED D7 LfMB ATTORNEYS FOR APPLICANT I
HOUSTON LIGHTING & POWER COMPANY t-oa:e.1.R//.7[W-b-
Log......
F Cy......
C rig. To.
e - T r.m pl.
j__
/
G PDR fuuorumdL
' T PDR ADOCK' 05000466 s
r 4
w
....., =. G Q,i;2.,7T-~ %, fj;..
. -,, 3.,. '., _.... ;g
<fs Vil."*:- fjk 2 c
~
u ' Gi.$.~.b i '
NUCLEAR. REGULATORY COMMISS10!i ATOMIC SAFETY Af!D LICENSING C0ARD Before Administrative Judges:
Sheldon J. Wolfe, Chairman Gustave A. Linenberger, Jr.
Dr. E. Leonard Cheatum In the Matter of:
)
)
4 HOUSTON LIGHTING AND POWER COMPANY
)
Docket No. 50-466-CP
)
(Allens Creek Nuclear Generating
)
October 28, 1982 Station, Unit 1)
)
ORDER (Granting Applicant's Motion for Termination of Proceeding)
Having previously notified the Board on August 27, 1982 that it had cancelled plans to construct the Allens Creek Nuclear Generating Station, on October 6,1982, Houston Lighting and Power Company simulta-i neously filed a Withdrawal of Application and a Motion for Termination of Proceeding.
On October 15 and October 17, 1982, the NRC Staff and Intervenor John Doherty responded respectively that they had no objection I
to the granting of the motion.
C Absent objections, the Board grants the Motion for Termination of Proceeding and permits the withdrawal of the application.
Judge Cheatum concurs but was unavailable to sign this Order.
~
THE ATOMIC SAFETY AND LICENSING BOARD
~
w Gu(tave A. Line ger, Jr.
ADMINISTRATIVE JU GE A
W Sheldon J.@lfe, Cdairman ADMINISTRAUVE JUDGE 4,-r m& n,
factofute 3 p} lV/"<
Houston Lighting & Power Company Allens Creek 1 Withdrawn 10/28/82 Docket 50-466 Custom Design 170.21 A.1 Program Office Professional Staff-hour Contractual Total Review Staff-hours Expended Rate Cost Costs Costs Unit 1 NRR 22,072 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 3/
$39
$860,808
$643,502
$1,504,310 IE 621 hours0.00719 days <br />0.173 hours <br />0.00103 weeks <br />2.362905e-4 months <br /> 36 22,356 22,356 ACRS 126.8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 50 6,340 6,340 ASLBP (contested hearing) ASLAP NONE.
NMSS NONE TOTAL
$1,533,006 5U
-~1/We have not included 15,442 professional staff hours incurred by NRR for the contested environmental hearing. We have included 300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> which represents the NRR normal effort for the required mandatory hearing phase for the CP review.
-]
2 The total cost for Unit 1 is $1,533,006.
As stated in 170.21 A.1, the maximum fee for Unit 1 is $1,069,000.
Since only an application fee of $125,000 has been paid, the balance due NRC is as follows:
Unit 1
$1,069,000 Maximum Fee Less: App. Fee 125,000 Paid 8/24/73 Balance Due:
$ 944,000 i
d&VdLe5U$$ hb
-