'i e
ISh= I' i.
m THE CINCINNATI GAS & ELECTRIC COMPANY CINCINNATO,OMIO 45201 July ll, 1983 LOZ-83-0079 J, WILLIAMS. JR stNaon vice passeDENT 3eUCLEAN OPERafMNs i
Docket No. 50-358
-U.S.
Nuclear Regulatory Commission
-Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention:
Mr. J.G. Keppler Regional Administrator Gentlemen:
RE:
WM. H. ZIMMER NUCLEAR POWER STATION - UNIT 1 10CFR50.55(e), ITEM M HVAC DAMPER ACTUATOR DEFICIENCIES W.O.
57300, JOB E-5590, FILE NO. 956C, M-14 This letter constitutes an interim report concerning the subject condition initially reported to the Commission on March 12, 1980- under the requirements of 10CFR50.55 (e).
As indicated in our previous report, LCZ-83-0005, dated March 24, 1983, actual field torque measurements on the dampers and analysis of the. torque data by Sargent & Lundy Engineers has determined that:
1.) Three actuators require replacement; 2.) Two actuators require spring replacement; and 3.): Three actuators require spring height adjustment.
~
Torque testland analysis are still required on ten (10) dampers in the Primary Containment Ventilation (VP) and Primary Containment Purge.(VQ) _systamc.. These. tests cannot be performed until the VPz and VQ system ductwork'is complete.
Completion of this work 'is contingent upon the release 'of the NRC November 12, 1982 " Order to Show Cause and Order Immediately Suspending Construction" for work in this area.
Upon this release, a projected schedule.for completion of the corrective actions will
'be submitted.
g7ggO
[
$b O
S
.~
r6 I
Mr. J.G. Keppler Rentonal Administrator July 11, 1983 LOZ-83-0079 Page 2 We trust the above will be found acceptable as an interim report under 10CFR50.55 (e).
Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY i
By g#r :1J
~
. WILLIAMS, J SENIOR VICE P SIDENT DJS/sfr cc:
NRC Office of Inspection & Enforcement Washington, D.C.
20555 NRC Senior Resident Inspector ATTN:
W.F. Christianson NRC Zimmer Project Inspector, Region III-ATTN:
E.
R.
Schweibinz l