Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20078N439 + (05:19:06, 15 December 2024)
- ML20078N434 + (05:19:07, 15 December 2024)
- HL-4738, Provides Implementation Schedule for Power Update for Units 1 & 2.Major Milestones for Program Provided in Encl + (05:19:08, 15 December 2024)
- ML20078N433 + (05:19:08, 15 December 2024)
- ML20078N422 + (05:19:09, 15 December 2024)
- ML20078N425 + (05:19:09, 15 December 2024)
- ML20078N410 + (05:19:10, 15 December 2024)
- ML20078N412 + (05:19:10, 15 December 2024)
- ML20078N408 + (05:19:11, 15 December 2024)
- 0CAN108302, Withdraws Request for Schedular Exemption Until 830501 to Complete Installation of Certain 1 H Rated Fire Barriers. Mods Completed by 830422 + (05:19:12, 15 December 2024)
- ML20078N403 + (05:19:12, 15 December 2024)
- ML20078N402 + (05:19:13, 15 December 2024)
- ML20078N401 + (05:19:14, 15 December 2024)
- ML20078N394 + (05:19:14, 15 December 2024)
- W3P83-3406, Advises That Deficiency Re Failure of CPC Software to Apply Failed Ceac Penalty Factor to Local Power Density Corrected, Per NRC Request.Item Should Be Closed Out in Next Suppl to SER + (05:19:15, 15 December 2024)
- ML20078N389 + (05:19:15, 15 December 2024)
- 05000362/LER-1983-065, Corrected LER 83-065/03L-0:on 830905 & 12,high-range in-containment Radiation Monitor 3RI-7820-1 Declared Inoperable After Discovery in Failed Low Condition.Caused by Faulty Electrical Cable Penetration Path + (05:19:16, 15 December 2024)
- HL-4782, Informs That DM Crowe Is Replacing Sj Bethay as Licensing Svc Manager + (05:19:17, 15 December 2024)
- ML20078N379 + (05:19:17, 15 December 2024)
- ML20078N374 + (05:19:18, 15 December 2024)
- ML20078N363 + (05:19:18, 15 December 2024)
- ML20078N362 + (05:19:19, 15 December 2024)
- ML20078N360 + (05:19:20, 15 December 2024)
- ML20078N359 + (05:19:20, 15 December 2024)
- ML20078N358 + (05:19:21, 15 December 2024)
- 05000331/LER-1983-037-03, /03L-0:on 830915,during Surveillance Test,Rod Block Monitor Channel B Prevented Movement of Rod 26-07, Causing Inoperability of Channel.Caused by Wiring Problem. Component Replaced + (05:19:22, 15 December 2024)
- 05000321/LER-1995-001, :on 950110,personnel Error Resulted in Missed TS Surveillance.Operations Shift Supervisor Was Counseled on Importance of Paying Attention to Detail + (05:19:24, 15 December 2024)
- BSEP-83-3167, Responds to NRC Re Violations Noted in IE Insp Repts 50-324/83-23 & 50-325/83-23.Corrective Actions: Procedure Will Be Implemented by 831130 to Ensure Revs to Certificates of Compliance Will Be Identified + (05:19:25, 15 December 2024)
- ML20078N348 + (05:19:26, 15 December 2024)
- RBG-41175, Forwards Woodward-Clyde Consultants Evaluation of Proposed Wildlife Mgt Lake, Final Rept.Util Will Not Construct Lake Ref in TAC M-83577 Based on Review of Rept & Considers Item Closed + (05:19:26, 15 December 2024)
- ML20078N337 + (05:19:27, 15 December 2024)
- 05000455/LER-1993-008-01, :on 931123,reactor Trip/Turbine Trip Occurred Due to Solid State Protection Sys Universal Logic Card Intermittent Failure.Further Testing of Removed Cards A218, A316 & A517 Completed W/No Definitive Results + (05:19:29, 15 December 2024)
- 05000362/LER-1983-074-03, /03L-0:on 830909,containment Airborne Radiation Monitor 3RI-7804C in Continuous Alarm State & Declared Inoperable.Caused by Alarm Setpoint Being Set Too Low.New Setpoint Established + (05:19:34, 15 December 2024)
- 05000255/LER-1983-064-03, /03L-0:on 830916,during Routine Surveillance Test, as-found Lift Pressure of Pressurized Relief Valve RC-1039 Exceeded Acceptance Criteria Range.Cause Unknown.Valve Lift Setting Adjusted to Proper Value + (05:19:37, 15 December 2024)
- BSEP-83-2504, Responds to NRC Re Violations Noted in IE Insp Repts 50-324/83-18 & 50-325/83-18.Corrective Actions:Special Ventilation Hood Installed from HEPA Filtration Unit in Bag Cutting/Insp Station + (05:19:38, 15 December 2024)
- ML20078N296 + (05:19:38, 15 December 2024)
- ML20078N288 + (05:19:39, 15 December 2024)
- GO2-83-916, Final Deficiency Rept,Condition 262 Re Power Piping M-146 Near Brackets Substituted for Previously Approved & Unavailable M-142 Brackets.Burns & Roe Revised Spec 215, Section 1B,App D + (05:19:40, 15 December 2024)
- ML20078N270 + (05:19:40, 15 December 2024)
- JPN-95-005, Submits Results of Reactor Vessel Head Weld Inspections Conducted During 1995 Refueling Outage.Insp Data Shows No Changes from 1992 Insp Data + (05:19:41, 15 December 2024)
- U-602406, Application for Amend to License NPF-62,changing TS 3.3.2.1, Control Rod Block Instrumentation to Revise Two SRs & Associated Notes for Rod Withdrawal Limiter Mode of Rod Pattern Control Sys + (05:19:42, 15 December 2024)
- ML20078N260 + (05:19:42, 15 December 2024)
- ML20078N257 + (05:19:43, 15 December 2024)
- 05000298/LER-1995-002, :on 950110,14 PCIVs Documented as Not Having Been Modified to Prevent Potential auto-opening Upon Manual Reset.Caused by Personnel Error.Control Circuitry of 14 PCIVs Modified to Prevent auto-opening + (05:19:45, 15 December 2024)
- ML20078N247 + (05:19:46, 15 December 2024)
- ML20078N241 + (05:19:51, 15 December 2024)
- ML20078N231 + (05:19:52, 15 December 2024)
- ML20078N239 + (05:19:52, 15 December 2024)
- ML20078N219 + (05:19:53, 15 December 2024)
- ML20078N225 + (05:19:53, 15 December 2024)
- L-83-415, Responds to NRC Re Violations Noted in IE Insp Repts 50-250/83-19 & 50-251/83-19.Corrective Actions:Qc Personnel Responsible for Preparing Audits Instructed to List Dates & Responsible Personnel for All Commitments + (05:19:54, 15 December 2024)