[P3 USNRC REmo,y -.
ggpf ATlM a
=cosa fit M W 7 R{h,5GiA5 83 MG 8 A9: 48 Florida Power C 0 A P 7 A ATION August 4, 1983 3F-0883-02 Mr. James P. O'Reilly Regional Administrator, Region II Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission 101 Marietta Street N. W., Suite 2900 Atlanta, Ga.
30303
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. OPR-72 NRC Inspection Report 82-11 Redraw of Flow Diagrams on CAD
Dear Mr. O'Reilly:
We have completed our commitment to redraw the existing Flow Diagrams (302 & 318 series) on a Computer Aided Dratting (CAD) system by placing all of the 302 and 318 series drawings in the computer, incorporating the installed modifications including the Refuel IV modifications, in-corporating the field verification walk-down markings, and issuing the up-to-date Flow Diagrams on 8/1/83.
Sincerely, s
G. R. Westafer Manager Nuclear Licensing and Fuel Management EMG/feb 8310250458 830804 PDR ADOCK 05000302 G