Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20079H097 + (04:33:31, 15 December 2024)
- ML20079H092 + (04:33:32, 15 December 2024)
- ML20079H089 + (04:33:33, 15 December 2024)
- ML20079H090 + (04:33:33, 15 December 2024)
- ML20079H083 + (04:33:41, 15 December 2024)
- ML20079H079 + (04:33:47, 15 December 2024)
- ML20079H073 + (04:33:48, 15 December 2024)
- ML20079H074 + (04:33:48, 15 December 2024)
- ML20079H060 + (04:33:55, 15 December 2024)
- ML20079H069 + (04:33:55, 15 December 2024)
- ML20079H055 + (04:33:56, 15 December 2024)
- 0CAN088215, Forwards Public Version of Transmittal of Amend 5 to Emergency Plan,Incorporating Both State of AR & in-house Comments.W/O Encl + (04:33:57, 15 December 2024)
- ML20079H047 + (04:33:57, 15 December 2024)
- ML20079H031 + (04:33:58, 15 December 2024)
- RBG-16-743, Interim Deficiency Rept DR-107 Re Category I 125-volt Dc Air Circuit Breakers Supplied by Brown Boveri Electric Corp. Investigation Incomplete.Interim or Final Status Rept Expected by 840320 + (04:33:59, 15 December 2024)
- ML20079H030 + (04:33:59, 15 December 2024)
- ML20079H017 + (04:34:00, 15 December 2024)
- ML20079H012 + (04:34:00, 15 December 2024)
- ML20079H010 + (04:34:01, 15 December 2024)
- ML20079H011 + (04:34:01, 15 December 2024)
- ML20079H003 + (04:34:02, 15 December 2024)
- ML20079G981 + (04:34:13, 15 December 2024)
- ML20079G980 + (04:34:14, 15 December 2024)
- RBG-16-746, Interim Deficiency Rept DR-155 Re Personnel Airlock Seals Supplied by Wj Woolley Co.Investigation Incomplete.Interim or Final Status Rept Will Be Provided by 840515 + (04:34:15, 15 December 2024)
- ML20079G978 + (04:34:15, 15 December 2024)
- ML20079G971 + (04:34:16, 15 December 2024)
- RBG-16-745, Interim Deficiency Rept DR-154 Re High Voltage Cable Terminations.Investigation Incomplete.Interim or Final Status Rept Expected by 840406 + (04:34:17, 15 December 2024)
- ML20079G964 + (04:34:17, 15 December 2024)
- ML20079G951 + (04:34:25, 15 December 2024)
- ML20079G948 + (04:34:33, 15 December 2024)
- ML20079G939 + (04:34:50, 15 December 2024)
- ML20079G938 + (04:34:50, 15 December 2024)
- BECO-84-010, Forwards Revised QA Program (Beqam II) Resolving Comments in IE Insp Rept 50-293/83-22.Controlled Document Identifying Beqam II & ANSI N18.7 Requirements to Be Issued by 840331 + (04:34:58, 15 December 2024)
- ML20079G930 + (04:34:58, 15 December 2024)
- ML20079G925 + (04:35:05, 15 December 2024)
- ML20079G924 + (04:35:06, 15 December 2024)
- ML20079G918 + (04:35:07, 15 December 2024)
- ML20079G922 + (04:35:07, 15 December 2024)
- ML20079G903 + (04:35:08, 15 December 2024)
- ML20079G892 + (04:35:09, 15 December 2024)
- ML20079G883 + (04:35:22, 15 December 2024)
- BECO-91-123, Requests NRC Review & Approval of Encl Engineeing Evaluation of Elevated Tailpipe Temp on Safety Relief Valve 203-3D Discovered on 910814.Operation W/Leakage Will Not Cause Setpoint Drift in Excess of Drift Permitted by Tech Specs + (04:35:29, 15 December 2024)
- ML20079G880 + (04:35:29, 15 December 2024)
- ML20079G877 + (04:35:30, 15 December 2024)
- ML20079G859 + (04:35:55, 15 December 2024)
- ML20079G851 + (04:36:09, 15 December 2024)
- ML20079G850 + (04:36:10, 15 December 2024)
- ML20079G841 + (04:36:31, 15 December 2024)
- ML20079G835 + (04:36:32, 15 December 2024)
- B13930, Submits Evaluation of 910323 Inadvertent Pressurization of Isolated Portion of RCS Loop B,Causing Excursion Outside Normal Operating Pressure/Temp Limits.Results Indicated Integrity of Affected Components Not Compromised + (04:36:35, 15 December 2024)
- ML20079G827 + (04:36:41, 15 December 2024)
- RBG-16-638, Interim Deficiency Rept DR-138 Re ITE-Gould Motor Overload Relays & Trip Ranges.Investigation Incomplete.Interim or Final Rept Expected by 840330 + (04:36:42, 15 December 2024)