Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000361/LER-1983-081-03, /03L-0:on 830718,turbine Stop Valve 2UV-2200E Failed to Reopen After Stroking Closed Per Procedure.Caused by Grit in One Solenoid Dump Valve in Unitized Actuator. Solenoid Valve Replaced.Actuator Oil Filtered + (03:24:30, 15 December 2024)
- 0CAN088307, Forwards Proprietary Portion of Response to IE Bulletin 83-05 Re Hayward Tyler Pump Co Spare Parts Used at Facilities.Affidavit Encl.Response Withheld (Ref 10CFR2.790) + (03:24:32, 15 December 2024)
- ML20080D270 + (03:24:32, 15 December 2024)
- 05000260/LER-1983-047-03, /03L-0:on 830725,during Normal Operation,W/Hpci Removed from Svc to Calibr Tachometer,Hpci Rendered Inoperable.Caused by Wiring Error During Tachometer Calibr. Wires Reterminated.Procedure Revised + (03:24:34, 15 December 2024)
- ML20080D264 + (03:24:38, 15 December 2024)
- ML20080D263 + (03:24:39, 15 December 2024)
- ML20080D260 + (03:24:40, 15 December 2024)
- ML20080D257 + (03:24:41, 15 December 2024)
- ML20080D255 + (03:24:42, 15 December 2024)
- ML20080D253 + (03:24:43, 15 December 2024)
- ML20080D247 + (03:24:44, 15 December 2024)
- ML20080D250 + (03:24:44, 15 December 2024)
- ML20080D245 + (03:24:45, 15 December 2024)
- ML20080D239 + (03:24:46, 15 December 2024)
- ML20080D224 + (03:24:47, 15 December 2024)
- ML20080D210 + (03:24:48, 15 December 2024)
- ML20080D216 + (03:24:48, 15 December 2024)
- ML20080D208 + (03:24:50, 15 December 2024)
- ML20080D207 + (03:24:50, 15 December 2024)
- ML20080D205 + (03:24:51, 15 December 2024)
- ML20080D203 + (03:24:52, 15 December 2024)
- ML20080D200 + (03:24:53, 15 December 2024)
- ML20080D202 + (03:24:53, 15 December 2024)
- ML20080D197 + (03:24:54, 15 December 2024)
- ML20080D196 + (03:24:55, 15 December 2024)
- ML20080D194 + (03:24:56, 15 December 2024)
- ML20080D167 + (03:24:57, 15 December 2024)
- ML20080D183 + (03:24:57, 15 December 2024)
- AECM-83-0484, Final Deficiency Rept for Unit 1 & Interim Deficiency Rept for Unit 2 Re Failure of Agastat CR0095 Relay Bases.Bases Which Failed Push Test in Unit 1 Replaced.Investigation of Unit 2 Underway.Also Reportable Per Part 21 for Unit 1 + (03:24:58, 15 December 2024)
- ML20080D157 + (03:24:59, 15 December 2024)
- ML20080D164 + (03:24:59, 15 December 2024)
- ML20080D150 + (03:25:00, 15 December 2024)
- 05000255/LER-1983-054-03, /03L-0:on 830721,boric Acid Critical Heat Trace Points 408B & 409 Found Reading Low.Caused by Blown Fuse on Boric Acid Heat Trace Circuit 409B.Lack of Heater Capacity on 409B Caused 408B to Read Low + (03:25:02, 15 December 2024)
- ML20080D142 + (03:25:03, 15 December 2024)
- 05000237/LER-1983-059-03, /03L-0:on 830723,drywell Oxygen Analyzer Found Not Operating.Caused by Selecting Switch Stuck in on Position Causing Overload to Stepping Switch Coil Which Burned Coil Out.Analyzer Repaired + (03:25:05, 15 December 2024)
- ML20080D137 + (03:25:06, 15 December 2024)
- ML20080D117 + (03:25:07, 15 December 2024)
- ML20080D121 + (03:25:07, 15 December 2024)
- BVY-94-123, Application for Amend to License DPR-28 to Change Instrument Identification for ECCS Actuation Instrumentation + (03:25:08, 15 December 2024)
- 3F1294-12, Forwards Proprietary Calculation 32-1235116-00, Fm Assessment of CR-3,Pressurizer WP-15 Weld Flaw Until End-Of- Life & Calculation 32-1235087-00, CR-3,Pressurizer Surge Nozzle Stresses. Encls Withheld (Ref 10CFR2.790(b)(1)) + (03:25:09, 15 December 2024)
- ML20080D112 + (03:25:09, 15 December 2024)
- ML20080D081 + (03:25:10, 15 December 2024)
- ST-HL-AE-4948, Forwards Rev 11 to Operations QA Plan + (03:25:11, 15 December 2024)
- 05000302/LER-1994-011, :on 941115,personnel Error Leads to Missed Surveillance Resulting in Violation of Ts.Surveillance for BSV-11 & BSV-12 Was Performed by Verifying Valve Position Locally at Each Valve + (03:25:17, 15 December 2024)
- 05000321/LER-1994-014, :on 941119,reactor Automatically Shut Down Per Design on Turbine Stop Valve Closure Which Resulted in Loss of Feedwater Heating.Caused by Damaged Wire in Drain Pot Level Switch.Switch Repaired on 941119 + (03:25:19, 15 December 2024)
- 05000298/LER-1994-031, :on 941115,discovered That Steam Leak Detection Sys Temp Switches Not Being Calibrated within Surveillance Interval Intended by Tss.Caused by Personnel Error. Calibration Schedule of Switches Updated + (03:25:21, 15 December 2024)
- ML20080D045 + (03:25:22, 15 December 2024)
- JPN-94-066, Transmits Response to NRC RAI Re Design of Plant Core Shroud Preemptive Repair.Encl Response Contains Info That MPR Assoc Inc Maintains in Confidence & Withholds from Public Disclosure.Encl Withheld + (03:25:23, 15 December 2024)
- ML20080D043 + (03:25:23, 15 December 2024)
- RBG-15-721, Interim Deficiency Rept DR-74 Re Incorrect Installation of 1/4-inch drilled-in expansion-type Anchor Bolts.Initially Reported on 830531.Addl Info Expected from Ae by 830909. Interim or Final Rept by 830928 + (03:25:24, 15 December 2024)
- ML20080D025 + (03:25:24, 15 December 2024)
- BSEP-94-0511, Provides Results of CP&L Determination Re Feasibility of Single Point Radiation Control Area at Plant,Satisfying Commitment Established in Suppl 2 to Response to NOV 92-32-01 Issued 940912 + (03:25:25, 15 December 2024)