Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20080H994 + (02:59:47, 15 December 2024)
- ML20080H991 + (02:59:47, 15 December 2024)
- AECM-84-0043, Suppl to Final Part 21 Rept Re Failure of Qualified Cables on Transamerica Delaval Generators to Pass IEEE Flame Test Due to Inadequate Temp Rating for Cable Insulation. Initially Reported on 821214 + (02:59:48, 15 December 2024)
- ML20080H985 + (02:59:48, 15 December 2024)
- ML20080H984 + (02:59:49, 15 December 2024)
- ML20080H981 + (02:59:50, 15 December 2024)
- ML20080H979 + (02:59:52, 15 December 2024)
- ML20080H974 + (02:59:53, 15 December 2024)
- RBG-41197, Special Rept:On 950119,Div II EDG Experienced Invalid Failure When Diesel Room Standby Ventilation Fan Breaker Failed During Monthly Div II EDG Operability Test.Ge Type AKR-30 Breaker Returned to Vendor for Detailed Evaluation + (02:59:53, 15 December 2024)
- 05000280/LER-1984-001-01, :on 840106,overtemp delta-T Signal Tripped Reactor.Caused by Power Surge During Gaitronics Sys Maint. Gaitronics Sys Test Will Be Written & Performed & Results Will Be Used to Develop Procedure + (02:59:56, 15 December 2024)
- ML20080H960 + (02:59:57, 15 December 2024)
- ML20080H951 + (02:59:58, 15 December 2024)
- ML20080H958 + (02:59:58, 15 December 2024)
- ML20080H950 + (02:59:59, 15 December 2024)
- 05000328/LER-1984-001-02, :on 840105,containment Ventilation Isolation Occurred When High Radiation Alarm Actuated.Caused by Voltage Spike.Isolation Reset & Flow Switches Mounted on Shock Absorbing Rubber Mounts + (03:00:01, 15 December 2024)
- BECO-LTR-95-019, Comments on Proposed Policy Statement on PRA Methods in Nuclear Regulatory Activities + (03:00:02, 15 December 2024)
- ML20080H940 + (03:00:03, 15 December 2024)
- 05000263/LER-1984-004, :on 840110,emergency Filtration Train Transferred to Emergency Mode in Control Room Hvac.Caused by Chlorine Monitor Tape Cassette Running Out,Resulting in Tape Break & Spurious Monitor Trip + (03:00:05, 15 December 2024)
- ML20080H935 + (03:00:06, 15 December 2024)
- ML20080H927 + (03:00:06, 15 December 2024)
- ML20080H923 + (03:00:10, 15 December 2024)
- RBG-16-926, Interim Deficiency Rept DR-103 Re Lifting Lugs on Containment Dome.Investigation Ongoing.Interim or Final Status Rept Will Be Submitted by 840316 + (03:00:10, 15 December 2024)
- ML20080H893 + (03:00:11, 15 December 2024)
- ML20080H889 + (03:00:15, 15 December 2024)
- HL-4781, Submits Addl Info Requested by NRC Re Recent Core Shroud Mod on Plant Unit 1 + (03:00:16, 15 December 2024)
- ML20080H876 + (03:00:16, 15 December 2024)
- ML20080H866 + (03:00:17, 15 December 2024)
- ML20080H875 + (03:00:17, 15 December 2024)
- LIC-95-0047, Monthly Operating Rept for Jan 1995 for Fort Calhoun Station Unit 1 + (03:00:18, 15 December 2024)
- ML20080H865 + (03:00:18, 15 December 2024)
- ML20080H850 + (03:00:22, 15 December 2024)
- ML20080H841 + (03:00:23, 15 December 2024)
- ML20080H847 + (03:00:23, 15 December 2024)
- ML20080H835 + (03:00:24, 15 December 2024)
- ML20080H826 + (03:00:25, 15 December 2024)
- ML20080H832 + (03:00:25, 15 December 2024)
- ML20080H814 + (03:00:26, 15 December 2024)
- ML20080H822 + (03:00:26, 15 December 2024)
- TXX-4101, Interim Deficiency Rept Re Defective Delaval Piston Skirt Castings for Diesel Generators.Piston Skirt Castings Will Be Replaced W/Casting Provided by Supplier by May 1984 + (03:00:27, 15 December 2024)
- 05000327/LER-1984-002-02, :on 840112,actuation of High Radiation Alarm Caused Auxiliary Bldg Ventilation Isolation.Caused by Voltage Spike Generating Electromagnetic Interference W/ High Radiation Causing Trip + (03:00:32, 15 December 2024)
- ML20080H798 + (03:00:33, 15 December 2024)
- ML20080H792 + (03:00:37, 15 December 2024)
- 05000289/LER-1983-046, Revised LER 83-046/01T-1:on 831214,nuclear safety-related Circuit for make-up Pump Lube Oil Pressure Trip Found Incorrectly Routed.Caused by Design Oversight.Circuits for make-up Pumps Rerouted in Raceways + (03:00:41, 15 December 2024)
- 05000278/LER-1983-022-03, /03L-0:on 831207,4 Kv Emergency Bus Undervoltage Relay IVA-127 Failed to Operate.Caused by Binding of Relay Rotating Disk Due to Dust Buildup.Relays Cleaned,Tested & Returned to Svc + (03:00:46, 15 December 2024)
- ML20080H778 + (03:00:47, 15 December 2024)
- ML20080H776 + (03:00:52, 15 December 2024)
- ML20080H766 + (03:00:53, 15 December 2024)
- RBG-16-929, Interim Deficiency Rept DR-158 Re ITE-32D Relays Supplied by Brown Boveri.Investigation Incomplete.Next Rept Will Be Provided by 840418 + (03:00:53, 15 December 2024)
- ML20080H733 + (03:00:54, 15 December 2024)
- BSEP-83-4063, Responds to NRC Ltr Re Significant Finding C Noted in IE Insp Repts 50-324/80-43 & 50-325/80-45.Corrective Actions: Improved Sys for Condensor Pit Releases Will Be Completed by 840630 + (03:00:54, 15 December 2024)
- 05000338/LER-1984-001, :on 840109,plant Shut Down Due to High RCS Unidentified Leakage.Caused by Defective Tubes & Leaking Tube Plugs.Tubes Plugged & Leaking Plugs Repaired + (03:00:56, 15 December 2024)
- ML20080H729 + (03:01:00, 15 December 2024)