Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML091590026 + (16:29:52, 14 January 2025)
- ML091590006 + (16:29:53, 14 January 2025)
- ML091590002 + (16:29:54, 14 January 2025)
- 05000282/LER-2009-004, Residual Heat Removal System Inoperability While in Mode 4 Due to Potential Steam Voiding + (16:29:57, 14 January 2025)
- ML091560579 + (16:29:58, 14 January 2025)
- ML091560555 + (16:29:59, 14 January 2025)
- IR 05000440/2009403 + (16:30:06, 14 January 2025)
- ML091560522 + (16:30:07, 14 January 2025)
- 05000456/LER-2009-001, For Braidwood Station, Unit 1, Steam Generator Tube Exceeding Plugging Criteria Remained in Service During Previous Cycle + (16:30:10, 14 January 2025)
- ML091560496 + (16:30:10, 14 January 2025)
- ML091560441 + (16:30:11, 14 January 2025)
- ML091560437 + (16:30:12, 14 January 2025)
- NRC 2009-0058, Response to Request for Additional Information License Amendment Request 241 Alternative Source Term + (16:30:13, 14 January 2025)
- ML091560411 + (16:30:14, 14 January 2025)
- ML091560367 + (16:30:15, 14 January 2025)
- ML091560349 + (16:30:15, 14 January 2025)
- ML091560308 + (16:30:16, 14 January 2025)
- RBG-46916, Requests for Relief from ASME Section XI Volumetric and Visual - Examination Requirements - Second 10-Year Interval + (16:30:17, 14 January 2025)
- ML091560200 + (16:30:18, 14 January 2025)
- ML091560229 + (16:30:18, 14 January 2025)
- ML091560176 + (16:30:19, 14 January 2025)
- L-09-711, Response to Request for Additional Information Related to Inservice Testing Program Requests in Support of the Third Ten-Year Interval + (16:30:20, 14 January 2025)
- ML091560130 + (16:30:20, 14 January 2025)
- 05000247/LER-2009-002, Manual Reactor Trip Due to Decreasing Steam Generator Levels Caused by a Loss of Main Feedwater Pump 21 and Failure of the Main Turbine to Automatically Runback + (16:30:24, 14 January 2025)
- NLS2009034, Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency and Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process + (16:30:24, 14 January 2025)
- W3F1-2009-0025, Withdrawal of License Amendment Request License Condition to Support Implementation of Extended In-Service Inspection Interval + (16:30:25, 14 January 2025)
- W3F1-2009-0021, License Amendment Request to Revise the Departure from Nucleate Boiling Ratio (DNBR) Safety Limit + (16:30:26, 14 January 2025)
- 2CAN060901, Response to Request for Additional Information for the Technical Specification Change to Modify RCS Flow Verification + (16:30:27, 14 January 2025)
- L-2009-128, Deviation from EPRI MRP-146 Ultrasonic Examination Schedule - NEI 03-08 Needed Work Product Element + (16:30:27, 14 January 2025)
- L-2009-124, Submission of Annual Report to the International Atomic Energy Agency + (16:30:28, 14 January 2025)
- RS-09-069, Withdrawal of Request for License Amendment Regarding Spent Fuel Storage Pool Criticality + (16:30:29, 14 January 2025)
- ML091550819 + (16:30:30, 14 January 2025)
- ML091550806 + (16:30:31, 14 January 2025)
- Press Release-09-104, NRC Issues Safety Evaluation Report for the Prairie Island Nuclear Plant License Renewal Application + (16:30:31, 14 January 2025)
- ML091550803 + (16:30:32, 14 January 2025)
- ML091550791 + (16:30:33, 14 January 2025)
- ML091550768 + (16:30:34, 14 January 2025)
- ML091550769 + (16:30:34, 14 January 2025)
- ML091550763 + (16:30:35, 14 January 2025)
- ML091550760 + (16:30:35, 14 January 2025)
- ML091550750 + (16:30:36, 14 January 2025)
- L-09-157, Discharge Monitoring Report (NPDES) Permit No. PA0025615 + (16:30:37, 14 January 2025)
- ML091550723 + (16:30:38, 14 January 2025)
- ML091550720 + (16:30:39, 14 January 2025)
- SECY-09-0025, SRM-M090604B - Affirmation: I. SECY-09-0025 - Entergy Nuclear (Pilgrim & Vermont Yankee); Ii. SECY-09-0040 - Entergy Nuclear Generation Co. & Entergy Nuclear Operations Inc. (Pilgrim) + (16:30:40, 14 January 2025)
- JAFP-09-0070, Emergency License Amendment Request Application for Technical Specification 3.8.1 Required Action B.4 Completion Time + (16:30:42, 14 January 2025)
- ML091550701 + (16:30:43, 14 January 2025)
- SECY-09-0040, M090604B-Affirmation: I. SECY-09-0025 Entergy Nuclear (Pilgrim and Vermont Yankee); Ii. SECY-09-0040 - Entergy Nuclear Generation Co. and Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station) + (16:30:44, 14 January 2025)
- ML091550697 + (16:30:46, 14 January 2025)
- ML091550692 + (16:30:47, 14 January 2025)
- ML091550690 + (16:30:48, 14 January 2025)