Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20080M841 + (13:58:50, 14 December 2024)
- ML20080M844 + (13:58:50, 14 December 2024)
- 05000346/LER-1995-001, :on 950126,determined That LOCA Analysis Results for 2 Ft Core Elevation Potentially non-conservative Due to Modeling Errors.Vendor Evaluated Current Fuel Cycle to Determine If Operating Limits Valid + (13:58:52, 14 December 2024)
- ML20080M828 + (13:58:53, 14 December 2024)
- ML20080M823 + (13:58:54, 14 December 2024)
- ML20080M822 + (13:58:55, 14 December 2024)
- IR 05000285/1983028 + (13:59:33, 14 December 2024)
- ML20080M811 + (13:59:34, 14 December 2024)
- ML20080M809 + (13:59:35, 14 December 2024)
- ML20080M807 + (13:59:36, 14 December 2024)
- ML20080M804 + (13:59:37, 14 December 2024)
- ML20080M801 + (13:59:38, 14 December 2024)
- ML20080M795 + (13:59:39, 14 December 2024)
- ML20080M796 + (13:59:39, 14 December 2024)
- ML20080M791 + (13:59:40, 14 December 2024)
- ML20080M789 + (13:59:40, 14 December 2024)
- ML20080M771 + (13:59:41, 14 December 2024)
- ML20080M778 + (13:59:41, 14 December 2024)
- 05000336/LER-1995-002-01, :on 950125,confirmed That Assumptions Made for Original Design Basis Analysis for Containment Sump Isolation Valve non-conservative.Caused by Inadequate Evaluation.Second Review Completed + (13:59:43, 14 December 2024)
- ML20080M759 + (13:59:44, 14 December 2024)
- ML20080M756 + (13:59:45, 14 December 2024)
- ML20080M752 + (13:59:45, 14 December 2024)
- FVY-83-104, Advises That Assessment of Two Viable Options for Location of Primary Emergency Operations Facilities,Per Suppl 1 to NUREG-0737,scheduled for Completion in Early Nov 1983.Final Decision Expected by 831119 + (13:59:46, 14 December 2024)
- ML20080M748 + (13:59:47, 14 December 2024)
- ML20080M747 + (13:59:47, 14 December 2024)
- ML20080M746 + (13:59:48, 14 December 2024)
- ML20080M745 + (13:59:49, 14 December 2024)
- ML20080M738 + (13:59:49, 14 December 2024)
- ML20080M735 + (13:59:50, 14 December 2024)
- ML20080M733 + (13:59:51, 14 December 2024)
- ML20080M729 + (13:59:51, 14 December 2024)
- ML20080M728 + (13:59:52, 14 December 2024)
- ML20080M722 + (13:59:52, 14 December 2024)
- ML20080M718 + (13:59:53, 14 December 2024)
- ML20080M721 + (13:59:53, 14 December 2024)
- 3F0295-15, Part 21 Rept Re GE Supplied Constant Voltage Transformers (Cvt).Vendot Supplied FPC W/Instructions on Mod of Cvts Located in Installed VBIT-1D,to Return Output Voltage to Required Values & FPC Modified Cvts + (13:59:57, 14 December 2024)
- ML20080M706 + (13:59:58, 14 December 2024)
- ML20080M703 + (13:59:58, 14 December 2024)
- 05000361/LER-1984-001, :on 840111,preparation of Fire Hazard Analysis & Review of Fire Protection Surveillance Results Identified Deficiencies in Fire Protection Program.Review in Progress. Complete Rept Will Be Submitted by 840228 + (14:00:00, 14 December 2024)
- ML20080M696 + (14:00:01, 14 December 2024)
- ML20080M694 + (14:00:03, 14 December 2024)
- 05000275/LER-1984-003, :on 840116,plant Experienced Spurious Safety Injection Actuation While in Cold Shutdown.Caused by Momentary Voltage Drop on Instrument Ac Bus 1-1.No Corrective Actions Planned + (14:00:05, 14 December 2024)
- ML20080M680 + (14:00:06, 14 December 2024)
- ML20080M676 + (14:00:06, 14 December 2024)
- ML20080M674 + (14:00:07, 14 December 2024)
- ML20080M673 + (14:00:08, 14 December 2024)
- ML20080M668 + (14:00:08, 14 December 2024)
- ML20080M664 + (14:00:09, 14 December 2024)
- ML20080M663 + (14:00:10, 14 December 2024)
- 05000275/LER-1984-005, :on 840116,diesel Generator 1-2 Automatically Started Due to 4 Kv Startup Power Bus Undervoltage.Caused by Operator Inadvertently Isolating Startup Transformer 12 from 4 Kv Vital Bus Feeder + (14:00:11, 14 December 2024)
- ML20080M659 + (14:00:12, 14 December 2024)