Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20083H713 + (10:45:04, 14 December 2024)
- 05000311/LER-1983-061-03, /03L-0:on 831207,during Maint Shutdown,Safeguards Equipment Control Channel 2A Inadvertently Actuated While Testing,Causing Vital Bus 2A to Be Deenergized.Caused by Reversing Polarity of Leads + (10:45:06, 14 December 2024)
- ML20083H711 + (10:45:07, 14 December 2024)
- BECO-83-301, Application for Proposed Tech Spec Change 83-15 to License DPR-35,correcting Error in GE Oct 1983 Reload Licensing Submittal for Restart from Refueling Outage 6 + (10:45:11, 14 December 2024)
- ML20083H703 + (10:45:12, 14 December 2024)
- ML20083H700 + (10:45:13, 14 December 2024)
- RBG-16-711, Interim Deficiency Rept DR-137 Re Preheat Requirements for Pipe Support Welds.Investigation Continuing.Next Rept Will Be Provided by 840410 + (10:45:13, 14 December 2024)
- RBG-16-678, Forwards Changes to FSAR Section 2.4 in Response to Items Identified by Environ & Hydrological Engineering Branch in Draft SER Re Local Flooding.Changes Will Be Incorporated Into Next FSAR Amend + (10:45:14, 14 December 2024)
- ML20083H690 + (10:45:15, 14 December 2024)
- 05000267/LER-1983-052-03, /03L-0:on 831208,prestressed Concrete Reactor Vessel Cooling Water Outlet Temp Exceeded 120 F Limit.Caused by Absence of Svc Water Preventing Necessary Heat Exchange. Flow Returned to Sys 46 HX + (10:45:17, 14 December 2024)
- ML20083H676 + (10:45:21, 14 December 2024)
- ML20083H673 + (10:45:22, 14 December 2024)
- ML20083H669 + (10:45:22, 14 December 2024)
- ML20083H663 + (10:45:23, 14 December 2024)
- ML20083H664 + (10:45:23, 14 December 2024)
- ML20083H662 + (10:45:24, 14 December 2024)
- 05000373/LER-1983-148-03, /03L-0:on 831118,bus 142Y Deenergized & Switchgear 136X Equipment Failed to Loadshed.Caused by Main Sensing Contact Welding Closed.Contact Separated & Burnished + (10:45:26, 14 December 2024)
- AECM-83-0777, Responds to NRC Re Violations Noted in IE Insp Rept 50-416/83-46.Corrective Actions:Surveillance Procedure 06-ME-1M61-V-0001 Revised & Reissued as Rev 20.TCN 7 Requiring Valve Alignment Sketch Incorporated + (10:45:27, 14 December 2024)
- ML20083H655 + (10:45:27, 14 December 2024)
- RBG-16-640, Interim Deficiency Rept DR-112 Re 1E Battery Chargers Supplied by Power Conversion Products,Inc.Investigation Incomplete.Next Rept Will Be Provided by 840316 + (10:45:28, 14 December 2024)
- ML20083H651 + (10:45:28, 14 December 2024)
- 05000311/LER-1983-065-03, /03L-0:on 831207,diesel Generator 2B Voltage Regulator Failed,Causing Generator Breaker to Trip on Overcurrent.Caused by Grounded Voltage Regulator Control Power Transformer.Transformer Replaced + (10:45:30, 14 December 2024)
- L-83-599, Responds to Requesting Review of Info Summary of Radioactive Effluents During 1981.Info Verified to Be Correct + (10:45:31, 14 December 2024)
- ML20083H642 + (10:45:32, 14 December 2024)
- ML20083H641 + (10:45:32, 14 December 2024)
- ML20083H640 + (10:45:33, 14 December 2024)
- ML20083H639 + (10:45:34, 14 December 2024)
- ML20083H638 + (10:45:35, 14 December 2024)
- ML20083H637 + (10:45:36, 14 December 2024)
- ML20083H636 + (10:45:36, 14 December 2024)
- 05000387/LER-1983-161-01, /01T-0:on 831209,during Refueling,Rcs Temp Allowed to Exceed 140 F.Shutdown Cooling Sys Operable & in Svc. Caused by Flawed Procedures.Reactor Coolant Temp Not Recorded While in Operational Condition 5 + (10:45:38, 14 December 2024)
- 05000327/LER-1983-186-03, /03L-0:on 831209,diesel Generator 1A-A Tripped on High Crankcase Pressure.Caused by Improperly Torqued Wrist Pin Bolts on Cylinder 8.Diesel Repaired.Affected Parts Sent to General Motors Electromotive Div for Insp + (10:45:40, 14 December 2024)
- ML20083H631 + (10:45:40, 14 December 2024)
- RBG-16-639, Interim Deficiency Rept DR-140 Re Engine Mounted Fuel Oil Line in Standby Diesel Generator.Investigation Incomplete. Next Rept Will Be Submitted by 840402 + (10:45:41, 14 December 2024)
- ML20083H623 + (10:45:42, 14 December 2024)
- ML20083H624 + (10:45:42, 14 December 2024)
- IR 05000254/2020401 + (10:45:43, 14 December 2024)
- ML20083H622 + (10:45:43, 14 December 2024)
- ML20083H614 + (10:45:44, 14 December 2024)
- ML20083H619 + (10:45:44, 14 December 2024)
- ML20083H608 + (10:45:45, 14 December 2024)
- ML20083H601 + (10:45:46, 14 December 2024)
- ML20083H605 + (10:45:46, 14 December 2024)
- ML20083H595 + (10:45:48, 14 December 2024)
- ML20083H594 + (10:45:48, 14 December 2024)
- ML20083H591 + (10:45:49, 14 December 2024)
- RBG-16-630, Interim Deficiency Rept DR-128 Re Stainless Steel Tubing Supplied by Gulfalloy,Hub,Inc & Capital Pipe & Steel. Investigation Incomplete.Interim or Final Status Rept Expected by 840315 + (10:45:50, 14 December 2024)
- ML20083H588 + (10:45:50, 14 December 2024)
- ML20083H578 + (10:45:51, 14 December 2024)
- 05000387/LER-1983-163-03, /03L-0:on 831120,repeated Emergency Outside Air Intake High Radiation Alarms Occurred Contrary to Tech Specs.Caused by Failure of Gm Tube.Tube Replaced,Calibr, Retested & Channel Returned to Svc + (10:45:53, 14 December 2024)
- ML20083H571 + (10:45:54, 14 December 2024)