ML20083H639
| ML20083H639 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 12/23/1983 |
| From: | Gerrets T LOUISIANA POWER & LIGHT CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| SCD-78, W3K83-2029, NUDOCS 8401130282 | |
| Download: ML20083H639 (2) | |
Text
-
.~
~
- 4 LOUISIANA P O W E P & L 1 G H T! P O. BOX 6008
- NEW ORLEANS. LOUISIANA 70174 34a OcLAnONoc s1 ster
[504) 366-2345 EiiYs sysY$
December 23, 1983 W3K83-2029 Q-3-A35.07.78 Mr. John T. Collins Regional Administrator, Region IV g;
bg fq a i
s
\\ 'f,i);
i U. S. Nuclear Regulatory Commission j
611 Ryan Plaza Drive, Suite 1000 g
Jid - 3184 I fll Arlington, Texas 76012
REFERENCE:
LP&L Letter W3K83-1613 dated October 25, 1983 i
ih t
..g..
Dear Mr. Collins:
SUBJECT:
Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 78
'herican Bridge Structural Steel Deficiencies" Fifth Interim Report The above referenced letter indicated submittal of a Final Report to the USNRC on December 22, 1983.
At the present time, verification of the supporting documentation is scheduled to be completed in mid January 1984.
A Final Report will be submitted by January 31, 1984.
Very truly yours, T. F. Gerrets Quality Assurance Manager TFG:CNH:SSTG cc: Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.
20555 8401130282 831223 PDR ADOCK 05000382 1
S pop g y l
gn.
- ,y
.Mr. John-T. Collins-December 23,'1983 W3K83-2029 Page 2-
'ec:'- Director.
Office of Management Information and Program Control U. S. Nuclear Regulatory Commission
-Washington,LD.C.
20555 Mr. E. L. Blake
.Shaw, Pittman, Potts, & Trowbridge 1800 M Street, N.W.
Washington, D.C.-
20036 Mr. W. M. Stevenson Monroe & Lemann 1424 shitney Building New Orleans, Louisiana 70130
.