Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20084H589 + (09:33:16, 14 December 2024)
- ML20084H582 + (09:33:17, 14 December 2024)
- 3F0584-03, Requests That 840130 Tech Spec Change Request 112,changing Steam Generator Operating Level,Be Granted on Exigent Basis. Limitation of 30 MW Costing Customers Approx $20,000/day in Replacement Fuel Cost + (09:33:18, 14 December 2024)
- ST-HL-AE-1059, Responds to IE Bulletin 83-08, Electrical Circuit Breakers W/Undervoltage Trip Feature in Use in Safety-Related Application Other than Reactor Trip Sys. No Circuit Breakers W/Undervoltage Trip Attachment Utilized + (09:33:18, 14 December 2024)
- ML20084H577 + (09:33:19, 14 December 2024)
- ML20084H575 + (09:33:20, 14 December 2024)
- ML20084H574 + (09:33:20, 14 December 2024)
- W3P84-1259, Requests That Installation & Testing of Filters in Airborne Radioactivity Removal Sys & RAB Normal HVAC Be Delayed Until Initial Criticality,Due to Impact on Current Fuel Load Schedule & Depletion of Filters Due to Const + (09:33:21, 14 December 2024)
- ML20084H568 + (09:33:21, 14 December 2024)
- ML20084H560 + (09:33:22, 14 December 2024)
- ML20084H561 + (09:33:22, 14 December 2024)
- B11141, Forwards Response to Matls Engineering Branch Draft SER Open Item Mteb 250.8 Re Volumetric Exam of Pipe Welds. Response Should Resolve Concerns + (09:33:23, 14 December 2024)
- ML20084H554 + (09:33:23, 14 December 2024)
- LD-84-133, Schedules 1984 Annual Emergency Plan Exercise for 840922. Exercise Will Include Onsite & Offsite Agencies + (09:33:24, 14 December 2024)
- ML20084H547 + (09:33:25, 14 December 2024)
- 05000395/LER-1984-020, :on 840407,procedure Failed to Clearly Identify & Document Calibr of Individual train-related Low Fluid Oil Pressure Switches.Procedure 302.035 Revised & Calibr Performed on Each Switch + (09:33:26, 14 December 2024)
- ML20084H545 + (09:33:27, 14 December 2024)
- ML20084H541 + (09:33:28, 14 December 2024)
- ML20084H534 + (09:33:29, 14 December 2024)
- ML20084H540 + (09:33:29, 14 December 2024)
- ML20084H531 + (09:33:30, 14 December 2024)
- ML20084H533 + (09:33:30, 14 December 2024)
- ML20084H521 + (09:33:31, 14 December 2024)
- ML20084H527 + (09:33:31, 14 December 2024)
- ML20084H519 + (09:33:32, 14 December 2024)
- ML20084H517 + (09:33:33, 14 December 2024)
- 05000250/LER-1984-013, :on 840403,turbine Runback Occurred.Caused by Spurious Rod Drop in Nuclear Instrumentation Sys Channel N-44.Plant Stabilized at Approx 75% Power W/O Problem + (09:33:35, 14 December 2024)
- 05000324/LER-1995-002-02, :on 950510,HPCI Sys Failed to Operate as Required During Performance of HPCI Periodic Test.Caused by End of Burnout.Verified Adequacy of Similar Resistors in Unit 1 & 2HPCI & RCIC Sys + (09:33:37, 14 December 2024)
- ML20084H512 + (09:33:38, 14 December 2024)
- ML20084H511 + (09:33:38, 14 December 2024)
- ML20084H508 + (09:33:39, 14 December 2024)
- ML20084H507 + (09:33:39, 14 December 2024)
- TXX-4131, Informs That Evaluation of Discrepancy in Vendor Documentation of QA Inspector Eye Exam Records Continuing. Completion Anticipated by 840416 + (09:33:40, 14 December 2024)
- ML20084H504 + (09:33:40, 14 December 2024)
- ML20084H503 + (09:33:41, 14 December 2024)
- ML20084H499 + (09:33:42, 14 December 2024)
- ML20084H501 + (09:33:42, 14 December 2024)
- ML20084H497 + (09:33:43, 14 December 2024)
- ML20084H496 + (09:33:43, 14 December 2024)
- ML20084H495 + (09:33:44, 14 December 2024)
- ML20084H489 + (09:33:45, 14 December 2024)
- ML20084H493 + (09:33:45, 14 December 2024)
- ML20084H482 + (09:33:46, 14 December 2024)
- ML20084H475 + (09:33:46, 14 December 2024)
- ML20084H474 + (09:33:47, 14 December 2024)
- ML20084H473 + (09:33:48, 14 December 2024)
- ML20084H472 + (09:33:48, 14 December 2024)
- ML20084H470 + (09:33:49, 14 December 2024)
- ML20084H471 + (09:33:49, 14 December 2024)
- 05000369/LER-1984-012, :on 840330,during Periodic Test,Diesel Generator 1A Experienced Automatic Start Signal.Caused by 4160-volt Emergency Bus Eta Blackout When Feeder Breaker Mistakenly Opened.Breaker Closed & Loaded + (09:33:51, 14 December 2024)
- ML20084H464 + (09:33:52, 14 December 2024)