ML20084H561

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Fuel Handling Grapple & Malfunction of Refueling Platform Hoist Brake.Initially Reported on 740516 & 23,respectively.Grapple 10-inch & 7-inch Section Fell,Breaking Stops Which Fell Into Reactor
ML20084H561
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 06/20/1974
From: Gilleland J
TENNESSEE VALLEY AUTHORITY
To: Knuth D
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20084H553 List:
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8305040632
Download: ML20084H561 (2)


Text

_

l O

^}~

^ TENNESSEE VALLEY AUTHORITY >

CHATTANOOGA, TENNESSEE 37401 June 20, 1974 l

$NESE$E PARTNERSHIP Mr. Donald F. Knuth, Director l

Directorate of Regulatory Operations U.S. Atomic Energy Commission Washington, DC 20545

Dear Mr. Knuth:

Initial report of Deficiency 1 involving the fuel-handling grapple in Browns Ferry Nuclear Plant unit 2 was made on May 16, 1974. On May 23, 1974, an initial report was made concerning the malfunction of the refueling platform hoist brake in Browns Ferry Nuclear Plant unit 2 (Deficiency 2).

A request of May 31, 1974, to AEC-DRO Inspector W. S. Little to cover these deficiencies in the same report was granted.

In accordance with paragraph 50.55(e) of 10 CFR 50, this is submitted as an interim report for the two occurrences.

Deficiency 1: After a modification to the fuel-handling grapple, the 10-inch section became stuck in the 12-inch section. In order to loosen the stuck section, the grapple was jarred while over the reactor vessel. The 10-inch and 7-inch sections of the grapple fell about 15 feet, impacting on the grapple stops. Some of the grapple stops broke loose and fell into the reactor vessel.

Deficiency 2: The electromechanical brake on the

. refueling platform main hoist motor was found to be inoperative.

I  ;

J l  : \ i l i 1 , ir a sf p

} bd#o l .

(

') -

4 1762 i 1

.-,r.s.. .~- - - - . . .

-._.~,.,n m_~. .

9

n.,;; . - - - -

. L w.wwu s . . ,, w~ w.w, . . . _

---, c s ,

p(n Mr. Donald F. Knuth June 20, 1974 The information we have received on these two deficiencies is

- . insufficient to complete the final report. We plan to submit the final report by July 16, 1974.

Very truly yours, AaA9s

. E. Gilleland Assistant to the Manager of Power  !

t CC: . Mr. Norman C. Moseley, Director Directorate of Regulatory Operations U.S. Atomic Energy Commission Region II - Suite 818 230 Peachtree Street, NW.