ML20084H475

From kanterella
Jump to navigation Jump to search
Forwards Procedures Generation Package for Emergency Operating Procedures,Including plant-specific Technical Guidelines for Units 1 & 2 & plant-specific Writers Guide. NRC Review Requested Per NUREG-0899
ML20084H475
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 05/01/1984
From: Gucwa L
GEORGIA POWER CO.
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML20084H477 List:
References
RTR-NUREG-0899, RTR-NUREG-899 GL-82-33, NED-84-231, NUDOCS 8405080073
Download: ML20084H475 (2)


Text

- .- . -

Georgia Power Company 333 Piedmont Avenue +

Atlanta, Georgia 30308 l4 Telephone 404 5266526 I

Ma;Inng Address' l Post Offce Box 4545 l Atlanta Gecrgia 30302 l Georgia Power L T. Gucwa the southern e4xtrc system Manager Nuclear Engineenng and Chief Nuclear Eng:noer NED-84-231 May 1, 1984 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 Division of Licensing -

U. S. Nuclear Regulatory Caiunission Washington, D. C. 20555 NRC DOCKETS 50-321, 50-366 OPERATING LIGNSES DPR-57, NPF-5 EIMIN I. HA'101 NUCLEAR PIAlff LNI'IS 1, 2 StBMITIAL OF PROCEDURES GENERATION PAOUGE FOR EMERGENCY OPERATING PROCEDURES Gentlemen:

Generic Letter 82-33 dated December 17, 1982, requires that NRC-licensees subnit a procedures generation package (PGP) at least three months prior to the start of formal operator training on the upgraded emergency operating procedures (EOPs) . Accordingly, we hereby submit for NRC review, the enclosed PGP based on the guidelines of NUREG 0899.

Section 7.1 of NURBG 0899 states that licensees may request that the NRC perform a limited review of the PGP and provide a preliminary evaluation.

Georgia Power Company (GPC) requests this evaluation in order to receive early NRC irput and thereby avoid the possibility of extensive revisions to our final EOPs.

Please note the following related to the Unit 1 and ' Unit 2 Plant Specific Technical Guidelines: 1) page 85 of 93 (Suppression Pool Ioad

, Limit) will be provided at a later date due to calculational work still in i' progress; 2) page 34 of 93 makes reference to a calculation being performed by General Electric for the BE Owners' Group which may change the value for j the maximum suberitical banked rod withdrawal position; and 3) a new revision to the generic BNR emergency procedure guidelines require a 4

e slight revision to values in the table on pages 71 of 93 80 of 93. <

! These changes will result in only minor revisions to the Hatch EDPs. 'Ib l avoid a delay in our BOP training schedule, we request that the NRC perform their review on the enclosed Rev. O PGP. Revisions as required will be sent 1 later. l t

l Wk!

F o!NOS1 PDR Jh V'

\\

E o

GeorgiaPower d Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 May 1, 1984 Page 2 Please contact this office if you have any questions or connents.

Very truly yours, W M/&

L. T. Gucwa PIS/

Enclosure xc: J. T. Beckhan, Jr.

H. C. Nix, Jr.

J. P. O'Reilly (NRC- Region II)

Senior Resident Inspector i

rwm e- - - _ _ _ _ _ _ - _ - _ _ - - . - _ _ _ _ _ - - _ _ - - - _ _ - _ - - . . _ _ _ . _ _ . _ . - _ _ - _ _ _ _ . _ - _ _ _ _ _ _ _ - _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - - - - _ - _ . - _ - - . _ - _ - . _ _ _ _ _ _ _ - . _ _ _ _ _ _ _ _ - - _ _ _ - _ - _ _ - _ _ _ _ _ _ _ _ _ - _ - _ _ .