Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- LD-83-341, Comments on MOU Between NRC & Each State within Compact. Addition of Proposed Insp Program Would Be Redundant Considering Present Regulation Stds & Would Incur Addl Expense & Time Delays + (06:50:50, 14 December 2024)
- ML20086L990 + (06:50:53, 14 December 2024)
- ML20086L948 + (06:50:57, 14 December 2024)
- ML20086L936 + (06:50:59, 14 December 2024)
- ML20086L930 + (06:50:59, 14 December 2024)
- NG-20-0023, Decommissioning Funding Status Report + (06:51:00, 14 December 2024)
- ML20086L914 + (06:51:01, 14 December 2024)
- ML20086L913 + (06:51:01, 14 December 2024)
- ML20086L894 + (06:51:02, 14 December 2024)
- 05000282/LER-1995-007, :on 950618,indentified That Door Seal Test of Containment Maintenance Airlock Not Performed within 3 Days of Last Use.Caused by Personnel Error.Surveillance Performed Immediately + (06:51:04, 14 December 2024)
- ML20086L884 + (06:51:05, 14 December 2024)
- ML20086L855 + (06:51:05, 14 December 2024)
- ML20086L853 + (06:51:06, 14 December 2024)
- 05000282/LER-1995-008, :on 950617,found That Sf Pit Continous Air Monitor Not Operating.Caused by Broken Drive Belt on Sample Pump.Belt Replaced + (06:51:07, 14 December 2024)
- 3F1291-03, Monthly Operating Rept for Nov 1991 for Crystal River Unit 3 + (06:51:09, 14 December 2024)
- ML20086L850 + (06:51:09, 14 December 2024)
- ML20086L837 + (06:51:10, 14 December 2024)
- ST-HL-AE-3947, Monthly Operating Repts for Nov 1991 for South Texas Project Units 1 & 2 + (06:51:11, 14 December 2024)
- ML20086L827 + (06:51:11, 14 December 2024)
- ML20086L821 + (06:51:12, 14 December 2024)
- ML20086L820 + (06:51:12, 14 December 2024)
- NRC-95-4509, Provides Correct Ltr Numbers to 950220 Correspondence Re Presentation Materials Entitled, Steam Generator Tube Alternate Plugging Criteria W/Tube Expansion + (06:51:13, 14 December 2024)
- ML20086L815 + (06:51:14, 14 December 2024)
- 05000443/LER-1995-002, :on 950618,manual Reactor Trip Initiated After Power Lost to Both Turbine EHC Pumps.Caused by Inadequate Design for 13.8 Kv non-safety Related Transformer.Trip Critical Transformers Replaced + (06:51:15, 14 December 2024)
- ML20086L785 + (06:51:16, 14 December 2024)
- U-601910, Monthly Operating Rept for Nov 1991 for Clinton Power Station,Unit 1 + (06:51:17, 14 December 2024)
- ML20086L760 + (06:51:18, 14 December 2024)
- ML20086L747 + (06:51:26, 14 December 2024)
- ML20086L746 + (06:51:27, 14 December 2024)
- ML20086L738 + (06:51:28, 14 December 2024)
- ML20086L739 + (06:51:28, 14 December 2024)
- ML20086L733 + (06:51:29, 14 December 2024)
- PY-CEI-NRR-1422, Monthly Operating Rept for Nov 1991 for Perry Unit 1.W/ + (06:51:30, 14 December 2024)
- ML20086L732 + (06:51:30, 14 December 2024)
- ML20086L723 + (06:51:31, 14 December 2024)
- ML20086L724 + (06:51:31, 14 December 2024)
- ML20086L722 + (06:51:32, 14 December 2024)
- 05000334/LER-1983-043-03, /03L-0:on 831229,main Steam Safety Valve Effluent Monitor Declared Inoperable.Cause Unknown.Monitor Left Energized to Ensure Proper Operation & Returned to Svc + (06:51:33, 14 December 2024)
- ML20086L717 + (06:51:40, 14 December 2024)
- ML20086L716 + (06:51:41, 14 December 2024)
- ML20086L712 + (06:51:41, 14 December 2024)
- ML20086L710 + (06:51:42, 14 December 2024)
- ML20086L709 + (06:51:43, 14 December 2024)
- ML20086L707 + (06:51:44, 14 December 2024)
- ML20086L708 + (06:51:44, 14 December 2024)
- JAFP-91-0815, Monthly Operating Rept for Nov 1991 for Ja Fitzpatrick Nuclear Power Plant + (06:51:45, 14 December 2024)
- ML20086L698 + (06:51:46, 14 December 2024)
- ML20086L691 + (06:51:49, 14 December 2024)
- ML20086L687 + (06:51:50, 14 December 2024)
- ML20086L684 + (06:51:50, 14 December 2024)
- ML20086L673 + (06:51:51, 14 December 2024)