. Georgia Po r Company 40 inverness Cohter Parkway Post Office Box 1295 Birmiesham. Nabama 35201
- folephone 205 877-7279 m
resIdenI'belear GeorgiaPower Hatch Project te scuttun edrtt syster July 18, 1995 Docket No. 50-321 HL-4886
.50-366 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Edwin I. Hatch Nuclear Plant Revised Resm>nse to a Notice of Violation Gentlemen:
By letter dated June 12,1995, Georgia Power Company (GPC) responded to a Notice of Violation associated with Inspection Report 95-09. Recently, while researching information related to that response, additional information was discovered that warrants revising that response. Enclosure 1 is a revised response to Inspection Report 95-09.
[ is the Sununary Repcit for an after hours exercise conducted May 31,1989.
l Sincerely,
[
P
-f
/
I
. T. Beckham, Jr.
JDH/eb
Enclosures:
- 1. Supplemental Response to Violation 95-09-02.
- 2. Summary Report for the Off-Hours Semi-Annual HP Exercise Conducted May 31,1989.
O/ (TM /
1 cc: Georzia Power Company Mr. H. L. Sumner, Jr., Nuclear Plant General Manager NORMS I
I U. S Nuclear Regulatorv Commission. Washington. D. C.
l, yg{
Mr. K. Jabbour, Licensing Project Manager - Hatch U. S Nuclear Reculatory Commission. Region H Mr. S. D. Ebneter, Regional Administrator iff Mr. B. L. Holbrook, Senior Resident Inspector - Hatch 1
9507240056 950718 if i o ' ('l '
PDR ADOCK 05000321 i
O PDR
e
~
Encloture 1 Edwin I. Hatch Nuclear Plant Revised Response to Violation 95-09-02 REVISED RESPONSE TO VIOLATION 95-09-02 Subsequent to responding to violation 95-09-02 by letter dated June 12,1995, additional information has been discovered that shows the violation did not occur. The new information was discovered while doing an extensive review of site files to ascertain whether or not an acceptable after hours exercise had been performed during the last six years. The review efTort was initiated partly in response to NRC concerns expressed during telephone conversations subsequent to our June 12,1995 letter.
The new information shows that an afler hours exercise (see Enclosure 2) was conducted on May 31,1989 that contained the necessary elements needed to qualify as an afler hours exercise. This exercise tested the following elements:
1.
Accident detection and assessment.
)
2.
Emergency classification.
3.
Notification of onsite and offsite emergency responders.
4.
Communications.
5.
Radiological exposure control.
Even though that exercise contained the necessary elements for satisfying current Emergency Plan requirements, certain corrective actions for future exercises have been identified as a result of the findings contained in Inspection Report 95-09 and subsequent conversations with NRC Region II personnel. Specifically, for future afler hours exercises, GPC will assure the following minimum requirements are met.
The exercise will contain the necessary elements needed to demonstrate the effectiveness of the Emergency Plan.
All agencies (local, state and federal) will be invited to participate in the exercise.
As in all previous exercises, Georgia Power Company will continue to monitor exercise activities to assess the effectiveness of the plan. This will include identification and correction of any deficiencies identified.
IIL-4886 El-1
Encibsure 1 ReviiedResponse to Violation 95-09-02 The 1995 exercise, which is a full participation exercise, is presently scheduled for August 23,1995 during normal working hours. Even though it is possible to perform an after hours exercise this year, it would be extremely difficult since Hatch Unit 2 is scheduled for a refueling outage commencing September 20,1995. Accordingly, we would like NRC approval to perform the afler hours exercise during 1996.
IIL-4870 E l-2 I
1 l
1 ENCLOSURE 2 EDWIN I. IIATCll NUCLEAR PLANT
SUMMARY
REPORT FOR TIIE OFF-IIOURS SEMI-ANNUAL IIP EXERCISE CONDUCTED MAY 31,1989 1