ML20086L716

From kanterella
Jump to navigation Jump to search
Deficiency Rept 83-14 Re Cable Grip Installation.Initially Reported on 831229.Also Updates Info Re Noncompliance Noted in IE Insp Repts 50-454/83-49 & 50-455/83-35.Personnel Retrained on Proper Cable Grip Installation
ML20086L716
Person / Time
Site: Byron  Constellation icon.png
Issue date: 01/31/1984
From: Tramm T
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
8070N, 83-14, NUDOCS 8402080395
Download: ML20086L716 (2)


Text

- _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - -

F I

l CN Commonwealth Edison

) one First Nusomi Plaza, Chictgo, Illmois p/?)8

( O ~/ Address R; ply to: Post Offica Box 767 (j Chicago, Illinois 60690 January 31, 1984 Mr. James G. Keppler Regional Administrator U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137

Subject:

Byron Generating Station Units 1 and 2 Cable Grip-Installation NRC Docket Nos. 50-454 and 50-455 _

Reference (a): December 30, 1983 letter from D. L.

Farrar to J. G. Keppler.

Dear Mr. Keppler:

On December 29, 1983 Commonwealth Edison notified your office of a deficiency reportable pursuant to 10 CFR 50.55(e) regard 3ng cable grip installation at Byron Generating Station. This letter fulfills the thirty-day reporting requirement of the regulation. It also updates information provided in reference (a) regarding a related noncompliance which was identified in I&E Inspection Report Nos. 50-454/83-49 and 50-455/83-35. For your tracking purposes this deficiency is numbered 83-14.

Description of Deficiency Cable support grips were not always installed per the requirements of Sargent & Lundy STD-EB-200. The deviations can be categorized into two basic violations of the specification requirements; (1) the size of the cable grip installed did not meet the sizing requirements of the specification and (2) too many cables installed or being supported by a single grip.

Analysis of Safety Implication Additional information regarding cable grip capabilities has been requested from the manufacturers. That information is necessary to assess the potential safety implications of this deficiency.

Corrective Actions As indicated in reference (a), contractor personnel were retrained in September, 1983 to assure that cable grips will be correctly installed and inspected. Evaluation of installed cable grips will be completed within 30 days. A final report will be provided at that time. ~

6 B402080395 840131 .

PDR ADOCK 05000454  %

PDR S g% )}$

l

s '. -

l' 0

J. G. Keppler 2- January 31, 1984 C

Please address any questions you may have regarding this matter to this office.

Very truly yours

, f,fpn._ -

T. R. Tramm Nuclear Licensing Administrator 1m i.

8070N~