ML20086L707

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1991 for Wolf Creek Generating Station
ML20086L707
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 11/30/1991
From: Bailey J, Mike Williams
WOLF CREEK NUCLEAR OPERATING CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NO-91-0348, NO-91-348, NUDOCS 9112170040
Download: ML20086L707 (7)


Text

. ,

9 J

~

Wt9LP CREEK NUCLEAR OPERATING CORPORATION John A. Bailey Vice President Operahons December 13, 1991 NO 91 0348 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station F1-137 Washington, D. C. 20555

Subject:

Docket No. 50-482: November, 1991, Monthly Operating Report Gentlemen:

Attached is the November, 1993, Monthly Operating Report for Wolf Creek Generating Station. This submittal is being made in accc,rdance with the requirements of Technical Specification 6.9.1.8.

Very truly yours, Job d j John A. Bailey 6

Vice President operations JABlaem Attachment cci A. T. Howell.(NRC), w/a R. D. Martin (NRC), w/a G. A. Pick (NRC), w/a W. D. Reckley (NRC), w/a a - ,,

.e - "M- '(

r,p gu , . , .

PO. Box 411 i Burkngton. KS 66839 J Phone. (316) 364-8831

_ _,, ~ , _ m m

,y

Attachment to f40 91-0348 WOLF CREEK NUCLEAR OPDWTIIG CORPOEMTION NOLF CREEK GDERATIIG STAl' ION MON 1MLY OPD ETI1G REPORT HONrris tbvmber YEAR: 1991 Docket Ib. : 50-402 Facility Operating Idcense Ib. : NPF-42 Report Ib. 81 z

Prepared by:

Merlin G. Williams

Attachmen't to NO 91-0348 SLM'MY The following report hignlights the operating experience of Wolf Cmok Generating Station for the nonth of Ibrsnber,1991. This report is being provided pursuant to Technical Specification 6.9.1.8.

I. StWMY OF OPERATIIG EXPERIF2CE The unit renined shutdown the entire nonth of idenber 1991 for mfueling activities, with Ibvater 30 representing day 72 of the continuing refueling outagv. The unit began the month in }bde 6, refueling, as fuel loading cont.inued in preparation for Cycle 6. Fuel loading and stud tensioning w re cmplettd tbvster 14, and the unit entered Mode 5, cold shutdown, with the unit remaining in this node for the runinder of the nonth.

II. MAJOR SAFE 1Y REIATED MAINTENAICE JCTIVITIES

1. Cmpleted naintenance on "B" emergency diesel generator, "B" essential service eter system, and "B" train mergency core ccoling systens.
2. Completed repair of "B" residual heat runaval pump notor, including rotor balancing.
3. Capleted fuel loading and reassanbly of reactor vessel head ard internals.
4. Cmpleted STS FJ-001 A and B, integrated safeguards tests.
5. Cmpleted sludge lancing on all steam genexators.
6. Cmpleted filling and venting of rtector coolant systan.
7. Ongoing, inspection, testing, evaluation, and resolution of notar operated valves.

Wolf Creek Generating Station Monthly Operating Report Ib runber 1991 Page 1 of 5

( Attachkent to NO 91-0348 OPERATDG DATA REPCRT DOCKET NO. 50-482 NOLF CREEK GENERATDG STATIQi WOLF CREEK NUCLEAR OPERATDG OCEPCRATIGi DATE 12-01-91._

CCMPIRITD BY M. Williams TELEPimE 2]i_3fz4-8831 OPERATDG STARE

1. Reporting Periods Nwmber,1991 Gross ikxtra in Etporting Period: 720
2. Currently Authorized Power Invel(MWt): 3411 Max. Depend. Capacity (Mb-lbt) _1,135 Dasign Electrical Rating (IMe-Not): 1170
3. Power level to Nhich RestrictM (If Any)(Mb-Net): N/A _
4. Reasons for restriction (If Any): N/A

'Ihis Month Yr. to Date Omd ative

5. Namber of Iburs Reactor was Critical 0.0 6,294.6 43,690.1
6. Reactor Reserve Shutdown Iburs 0.0 0.0 339.8
7. 1 burs Generator on Line 0.0 6,288.4 43,112.2
8. Unit Reserve Shutzlown ibuts 0.0 0.0 0.0
9. Gross Thermal Energy GeneratM (M) 0 JJ,028,566 140,093,591
10. Gross Eler:trical Energy GeneratM (M41) 0 6,198,737 _48,713,506
11. Net Electrical Energy Generated ( M ) 0 5,872,679 46,469,537
12. Reactor Service Factor 0.0 78.5 79.8
13. Reactor Availability Factor 0. 0 78.5 80.5
14. Unit Service Factor 0.0 78.4 78.8_
15. Unit Availability Factor 0.0 78.4 78.0
16. Unit Capacity Factor (Using MDC) 0.0 64.5 _ 75.1
17. Unit Capacity Factor (Using Design Mb) 0.0 62.6 72.6
18. Unit Forced Outage Rate 0.0 0.0 3.5
19. Shutdowns Scheduled Over Next 6 Fbnths (Type, Date, and Duration of each): N/A
20. If Shut Dom at End of Report Period, Estimated Date of Startup: January 1, 1992 .

vblf Creek Generating Staticn Monthly Operating Report j lbverber 1991 '

Page 2 of 5

A,ttachbent to NO 91-0348 l:

AVDUGE DAIIN UNIT IOffR ILVEL DOCKET 10. 50-402 NOLF CREEK GENERATIl0 STATICE HOLF CREEK NUCLEAR OPERATI!U (X]RPORATION 1%TE 12-01-91 CCMPLETED BY M. Wi11f ams TELEP110NE .116-364-881}, -

- }Omi Novcsnber, 1991

!%Y AVERAGE DAILY IOVER LEVEL DAY AVDUGE DAILY POWER LINEL (MM-Net) (INe-!bt) 1 0 17 0 2 0 18 0 e 3 0 19 0 .,___

4 0 20 0 5 0 21 0 6 0 22 0 _ _ _

7 0 23 0 ,

8 0 24 0 9 0 25 0 10 0 _

26 0 11 0 27 0 -

12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 N/A 16 0 Wolf Creek Generating Station Monthly Operating Report Ibvmber 1991 Page 3 of 5 i 1

Attachment.to NO 91-0348 UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET.NO. 50-482 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION' DATE 12-01-91 COMPLETED BY M. Williams REPORT MONTH November, 1991 TELEPHONE 316-364-3831, TYPE METHODS SHiJTTING F: FORCED' DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS / COMMENTS No Date S: SCHEDULED _(HOURS) (1) OR REDUCING POWER (2) 3 911101 S 720.0 C 4 Continued scheduled refueling outage.

SIMfARY: The unit remained in a scheduled refueling outage throughout the month.

1) REASON: A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD: 1. MANUAL B: MAINTENANCE OR TEST ' F: ADMINISTRATIVE 2. MAhTAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3. AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4. CONTINUED
5. REDUCED LOAD
0. GTHER

+

Wolf Creeh Generating Station Monthly Operating Report November.1991 Page 4 of 5

Attachment to N0 91-0348 NOLF CREEK 1ACLFAR OPERATIlG CXXtPORATICN HOLP CREEK GDERATIIG STATION LNIT 10.1 Formi lbvanber, 1991

SUMMARY

OF OPDtATIlG EXPERIDCE Listed below in chronological sequence is a sumnary of operati29 experiences for this month which requized load reduction or resulted in significant non-load related incidents.

DATE TIME EVDLP lbwxrber 1, 1991 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> Unit in Ibde 6, refueling.

Ibverber 14, 1991 2226 hours0.0258 days <br />0.618 hours <br />0.00368 weeks <br />8.46993e-4 months <br /> Unit in Mode 5, cold shutdown.

Ibvac;er 30, 1991 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> Unit in }bde 5, cold shutdown.

Vblf Creek Generating Station hbnthly Operatily Report November 1991 .

Page 5 of 5 l

- _ - _ _ - _ - _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ .