Attachment to TXX 91244 Page 1 of 4 COM ANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT DOCXETNO:
50-445 UNIT:
CPSES1 DATE:
July 2,1991 COMPLETED BY:
Greg Thatcher TELEPHONE:
817 897 8223 OPERATING STATUS 1.
Reporting Period: ME_1911 Gross hours in reporting period:
210 2.
Currently authorized power level (MWt):
3.d11 Max. depend. capacity (MWe Net):.1_tSS
- Design Electrical Rating (MWe Net):
115D 3.
Power level to which restricted (if any) (MWe Net):
NONE 4.
Reasons for restriction (if any):
THIS MONTH YR TO DATE CUMULATIVE 5.
Number of hours rear, tor was critical 720 2652.45 5578.85 6.
Reactor reserve shutdown hours 0
1690.55 1963.45 720 2614.2 5479.9 7.
Hours generator on line 0
0 0
8.
Unit reserve shutdown hours 2,439,547 8,391.059 16,547,987 9.
Gross thermal energy generated (MWH) 803.116 2,791,899 5,456,899 10.
Gross electrical energy generated (MWH) 11.
Not electrical energy Generated (MWH) 769,150 2,648,271 5,161,785 12.
Reactor Service factor 100 61.1 72.3 13.
Reactor availability factor 100 100 97,7 14.
Unit service factor 100 60.2 71 15.
Unit aveitabi';ty f actor 100 60.2 71 16, Unit capacity factor (Using MDC) 92.9 53 58.1 92.9 53 58,1 17.
Unit capacity factor (Using Design MWe) 18, Unit forced outage rate 0
21.5 14.9 19, Shutdowns scheduled over next 6 months (Type, Date, and Duration of each):
a) Refucting,911005, 56 days, 20, if shutdown at end of report period, estimated date of startup:
21.
Units in test status (prior to commercial operation):
ACHIEVED Commercial Operation 900813 Estimated R1 December 16, 1991 0112170030 711212 PDR ALOCK 0::'000445 R