Atta' chm:nt to TXX. 91376 Pag)1 of 4 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPER ATING REPORT DOCKETNO:
5^ 445 UNIT:
CPSES 1 DATE:
October 9,1991 COMPLETED BY:
Greg Thatcher TELEPHONE:
817 897 8223 OPERATING STATUS 1.
Reporting Perbd: SEPTEMBER 1991 Gross hours in reporting period:
22.0 2.
Currently authorized power level (MWI):
aill Max. depend. capacity (MWo. Net):.L110
- Design Electrical Rating (MWo. Net):
1110 3.
Power level to which restricted (if any) (MWe-Net):
NONE 4.
Reasons for restriction (if any):
THIS MONTH YRTO DATE CUMULATIVE 5.
Number of hours reactor was critical 720 4841.45 7767.85 0
1709.55 1982.45 6.
Reactor reserve shutdown hours 720 4798.2 7663.9 7.
Hours generator on line 0
0 0
8.
Unit reserve shutdown hours 2,431.361 15,742,446 23,899,374 9.
Gross thermal energy generated (MWH) 10.
Gross electrical energy generated (MWH) 802,524 5,208,683 7,873,683 R1 11 Not electrical energy generated (MWH) 768,809 4,960,737 7,474,251 12.
Reactor Service factor 100 73.9 78.2 13.
Reactor avaltability factor 100 100 98.2 14.
Unit service factor 100 73.2 77.2 15.
Unit availability f actor 100 73.2 77.2 16.
Unit capacity factor (Using MDC) 92.9 65.8 65.5 92.9 65.8 65.5 17.
Unit capacity factor (Using Design MWe) 18.
Unit forced outago rate 0
13.4 11.4 19.
Shutdowns scheduled over next 6 months (Type, Date, and Duration of each):
a) Refueling,911005.
56 days.
~
20.
If shutdown at end c' report period, estimated date of startup:
21.
Units in test status (prior to commeicial operation):
ACHIEVED Commorcial Operation 900813 Estimated R1 December 16, 1991
)
9112170034 911213
)
FDR ADOCK 0000 3
-