Clarifies NUREG-0737,Item II.E.4.1 Re Dedicated Hydrogen Penetrations.Plant Design Incorporates Containment Atmosphere Dilution Sys to Control Gases Following DBE
ML20086L723
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 02/03/1984
From: Bayne J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Vassallo D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.E.4.1, TASK-TM JPN-84-07, JPN-84-7, NUDOCS 8402080415
Download: ML20086L723 (2)


Text

- _ _ _ _ _ _ _ _ _.

5 23 M,un Stmet WMe ihnt New Vxk 10601 914 00L62'00

  1. > NewWrkPbwer 2 ~a~

E mecutive VKe Presvient 4# Authority February 3, 1984 JPN-84-07 Director of Nuclear Reactor Regulation U.

S.

Nuclear Regulatory Commission Washington, D.

C.

20555 Attention:

Mr. Domenic B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing

Subject:

James A.

FitzPatrick Nuclear Power Plant Docket No. 50-333 NUR3G-0737 Item II.E.4.1 Dedicated Hydrogen Penetrations

Reference:

1.

PASNY letter, R.

J.

Pasternak to T.

A.

Ippolito, dated September 30, 1980 (JAFP-80-759).

Dear Sir:

Clarification 1 to NUREG-0737 Item II.E.4.1 states that an acceptable alternative to providing dedicated hydrogen penetrations is a combined design that is single-failure proof for operation of the purge system.

The James A.

PitZPatrick Nuclear Power Plaat design incorporates a Containment Atmosphere Dilution (CAD) System which provides for control of postulated combustible gases following a Design Basis Event (DBE).

The CAD System is incorporated in a combined design with tne Drywell and Suppression Chamber Incrting and Purge System, and all purging is via the Standby Gas Treatment System.

To insure the capability for purge initiation without requiring operator entry into the Reactor Building and to eliasinate concern about a single failuce while purging, a piping and valve modification was proposed in Reference 1.

This modification was completed during the 1981-1982 refueling outage with the exception of providing a source of Class IE redundant power to two motor operated valves which was originally not available.

/[h 8402080415 840203

~'

PDR ADOCK 05000333 O

P PDR

1 9'

Arrangements are being made to obtain a motor control center which will provide Class IE power for both-this item and for

. Appendix R applications.

This motor-control center is scheduled for installation prior to July 1, 1985.

If you have any questions, please contact Mr. J.

A. Gray, Jr.

of my staff.

Very truly yours,

(~

,n

).Qt J.

Bayne Executive Vic/

e-President Nuclear Generation cc: