Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20086S420 + (06:31:02, 14 December 2024)
- ML20086S412 + (06:31:04, 14 December 2024)
- ML20086S416 + (06:31:04, 14 December 2024)
- ML20086S410 + (06:31:05, 14 December 2024)
- ML20086S407 + (06:31:06, 14 December 2024)
- ML20086S405 + (06:31:06, 14 December 2024)
- 05000254/LER-1991-023-01, :on 911126,control Room HVAC Toxic Gas Analyzer Annunicated Trouble Alarms,Causing Control Room Vents to Isolate.Cause Undetermined.Analyzer Declared Inoperable & New Probes Ordered + (06:31:09, 14 December 2024)
- ML20086S402 + (06:31:10, 14 December 2024)
- NPL-95-0324, Documents Compliance W/Intent of WOG Muhp 6002, Recommended Rod Control Surveillance Test & of Util Completion of Requested Rod Control Sys Timing Changes at Pbnp,Per GL 93-04 + (06:31:11, 14 December 2024)
- ML20086S382 + (06:31:13, 14 December 2024)
- ML20086S388 + (06:31:13, 14 December 2024)
- ML20086S376 + (06:31:14, 14 December 2024)
- ML20086S378 + (06:31:14, 14 December 2024)
- ML20086S369 + (06:31:15, 14 December 2024)
- ML20086S361 + (06:31:15, 14 December 2024)
- ML20086S360 + (06:31:16, 14 December 2024)
- BECO-91-155, Describes Program Plan for Completing Individual Plant Exam of External Events for Severe Accident Vulnerabilities,Per Suppl 4 to Generic Ltr 88-20.Exam Will Include Seismic Events,Internal Fires,High Winds & External Floods + (06:31:17, 14 December 2024)
- ML20086S347 + (06:31:17, 14 December 2024)
- 3F0795-16, Informs That Based on Preliminary Info Re Makeup Tank Operations,Util Confirmed That 940905 Evolution on Makeup Tank Evolution Conducted on 940904.Investigations Re Issue of Incomplete Makeup Tank Info Ongoing + (06:31:18, 14 December 2024)
- ML20086S332 + (06:31:19, 14 December 2024)
- ML20086S330 + (06:31:19, 14 December 2024)
- ML20086S327 + (06:31:20, 14 December 2024)
- ML20086S322 + (06:31:21, 14 December 2024)
- ML20086S317 + (06:31:22, 14 December 2024)
- ML20086S314 + (06:31:23, 14 December 2024)
- ML20086S309 + (06:31:23, 14 December 2024)
- ML20086S303 + (06:31:24, 14 December 2024)
- ML20086S306 + (06:31:24, 14 December 2024)
- ML20086S302 + (06:31:25, 14 December 2024)
- ML20086S297 + (06:31:26, 14 December 2024)
- ML20086S294 + (06:31:27, 14 December 2024)
- ML20086S293 + (06:31:27, 14 December 2024)
- ML20086S288 + (06:31:29, 14 December 2024)
- ML20086S280 + (06:31:34, 14 December 2024)
- ML20086S275 + (06:31:35, 14 December 2024)
- B15304, Informs NRC of Util Election to Extend Present Second 10-yr ISI Interval for Facility by 12 Months,As Allowed by ASME Code + (06:31:36, 14 December 2024)
- ML20086S270 + (06:31:36, 14 December 2024)
- ML20086S265 + (06:31:37, 14 December 2024)
- ML20086S256 + (06:31:38, 14 December 2024)
- ML20086S264 + (06:31:38, 14 December 2024)
- ML20086S254 + (06:31:39, 14 December 2024)
- ML20086S247 + (06:31:41, 14 December 2024)
- ML20086S240 + (06:31:42, 14 December 2024)
- ML20086S231 + (06:31:43, 14 December 2024)
- ML20086S222 + (06:31:44, 14 December 2024)
- ML20086S221 + (06:31:45, 14 December 2024)
- 05000281/LER-1976-004-01, /01T:on 760606,after Maint on Valve 1-CH-125,heat Tracing Circuits on Boric Acid Tank C Recirculation Line Not Placed Back Into Operation.Operating Procedure 1D Modified + (06:31:47, 14 December 2024)
- 05000280/LER-1976-005-01, /01T:on 760805,NSSS Vendor Informed of Error Discovered in LOCA ECCS Analysis.Reactor Vessel Upper Head Water Temp Should Be Assigned Value Similiar to Hot Leg Temp + (06:31:52, 14 December 2024)
- ML20086S215 + (06:31:53, 14 December 2024)
- 05000281/LER-1976-005-01, /01T:on 760915,pressurizer Level Fell 45% Below Level Set Point.Caused by Tube Leak in Steam Generator A. Steam Generator Isolated + (06:31:58, 14 December 2024)
- 05000364/LER-1984-003, :on 840130,reactor Tripped Due to low-low Level in Steam Generator 2C.Caused by Closure of Main Feedwater Regulating Valve 2C Due to Instrumentation Channel Spiking Low.Nlp Card Replaced + (06:32:00, 14 December 2024)
- JPN-95-037, Forwards Summarization of Scope of FW Nozzle/Sparger Exams Performed During Last & Previous Outages + (06:32:01, 14 December 2024)