Text
f 1
s 4
Pubhc Service
+
Ekoc aM Gu Company 4
Joseph J. Hagen Pubhc Service Electric and Gas Company P.o. Box 236, Hancocks Bndge, NJ 08038 609-3394200 JUL 2 51995 v-..
. m., o-..
LR-N95115 LCR 94-08, 94-11 & 94-12 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
LICENSE CHANGE REQUESTS 94-08, 94-11 & 94-12 SACS /SSWS/EDG AOT EXTENSIONS AND EDG ONLINE MAINTENANCE FACILITY OPERATING LICENSE NPR-57 HOPE CREEK GENERATING ST7.T10N DOCKET NO. 50-354 This letter documents a July 20, 1995, teleconference held between PSE&G, the NRR Hope Creek Project Manager and the NRR Director for Project Directorate I-2.
The purpose of this teleconference was to discuss the subject license change requests (LCRs).
Specifically, the proposed Safety Evaluation Report conditions pertaining to the extended diesel generator allowed outage time (AOT) were reviewed and are accepted by PSE&G as indicated in the July 24, 1994, May 26, 1995 and July 10, 1995 submittals concerning the subject LCRs. of this letter contains the conditions discussed during the teleconfer mce.
The Technical Specification Bases will be revised to include these conditions.
A copy of this letter has been sent to the State of New Jersey.
Should you have any questions regarding this transmittal, please feel free to contact us.
Sincerely, A
Attachment (1) n.
'10072 00 9508010170 950725 PDR ADDCK 05000354 d\\
P_
\\
...__m
~
i h
Document Control Desk JUL 2 5 ISGS LR-N95115 ALL WITH ATTACHMENT:
C
~Mr. T.
T. Martin,' Administrator - Region I U.
S.
Nuclear Regulatory Commission 475 Allendale Road l
King of Prussia, PA 19406 Mr.
D.
H. Moran, Licensing Project Manager - Hope Creek U.
S.
Nuclear Regulatory Commission One White Flint North Mail Stop 14E21 11555 Rockville Pike Rockville, MD 20852 Mr.
R.
Summers (SO9)
USNRC Senior Resident Inspector ^
t Mr. K. Tosch, Manager, IV NJ Department of Environmental Protection Division of Environmental Quality CN 415 Trenton, NJ 08625
REF: LR-N95115 STATE OF NEW JERSEY
)
)
SS.
COUNTY OF SALEM
)
J. Hagan, being duly sworn according to law deposes and says:
I am Vice President - Nuclear Operations of Public Service Electric and Gas Company, and as such, I find the matters set forth in the above referenced letter, concerning the Hope Creek Generating Station, are true to the best of my knowledge, information and belief.
^
Subscribed and Sworn to before me this
[$
day ofc(/ [c/
1995
/
/
Qi f f /t k f 2 L Notary Public of New Jersey W WE L M 8 TON ININT PUSUC OF NEW JERSEr My Commisstes aghs Dec. 30,19 My Commission expires on
ATTACHMENT 1 Granting the 14 day AOT extension for EDG C and D is based on the following conditions being met by the licensee:
1.
The licensee should verify through TS, procedures, or detailed analysis that the required systems, subsystems, trains, components, and devices that are required to mitigate the consequences of an accident are available and operable before removing an EDG for extended preventative maintenance (PM).
In addition, positive measures should be provided to preclude subsequent testing or maintenance activities on these systems, subsystems, trains, components, and devices while the EDG is inoperable.
2.
The overall unavailability of the EDG should not exceed the value that was used in the PRA supporting the proposed AOT.
3.
When C or D EDG is removed from service for an extended 14 i
day AOT, any two of the remaining EDGs must be capable, operable, and.available to mitigate the consequences of a LOOP condition.
4.
The removal from service of safety systems and important non-safety equipment, including offsite power sources, should be minimized during the extended 14 day AOT.
5.
Entry into this LCO action statement should not be abused by repeated voluntary entry into and exit from the LCo.
To clarify the use of the extended AOT the licensee will add the following insert to the Hope Creek TS bases:
"The primary intent of the extended EDG AOT is that the extended EDG AOT from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 14 days may be needed to perform preplanned EDG maintenance such as teardowns and modifications that would otherwise extend beyond the i
original 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> AOT."
6.
Any component testing or maintenance that increases the likelihood of a plant transient should be avoided.
Plant operation should be stable during the extended 14 day AOT.
7.
Voluntary entry into this LCO action statement should not be scheduled if adverse weather conditions are expected.